Flushing and North Side Railroad explained

Railroad Name:Flushing and North Side Railroad
Locale:Queens County, N.Y., U.S.
Start Year:1868
End Year:1874
Predecessor Line:New York and Flushing Railroad
Successor Line:Long Island Rail Road
Hq City:College Point, New York

The Flushing and North Side Railroad was a former railroad on Long Island built by Conrad Poppenhusen as a replacement for the former New York and Flushing Railroad. The railroad was established in 1868, was merged with the Central Railroad of Long Island in 1874 to form the Flushing, North Shore and Central Railroad, and was finally acquired by the Long Island Rail Road in 1876. Today the main line is known as the Port Washington Branch of the Long Island Rail Road.

Predecessor railroads

New York and Flushing Railroad

Before the Flushing and North Side, most of the line was originally built by the New York and Flushing Railroad (NY&F), in 1854 from Hunters Point in Long Island City to Flushing, before the LIRR opened its line to Long Island City.[1] Chartered on March 3, 1852, it was the first railroad on Long Island not to be part of the Long Island Rail Road. The company was taken over by Oliver Charlick and reorganized in 1859 as the New York and Flushing Railroad,[2] and established a subsidiary known as the "North Shore Railroad" to extend the line from Flushing to Great Neck in 1866 (see below). Originally intending to run further east to Roslyn, Oyster Bay, and even Huntington, the NY&F's plans were thwarted by the LIRR who reached those destination first, as well as poor service that the company became known for.

Flushing and Woodside Railroad

Dissatisfied with the NY&F's service, residents of Flushing and Newtown convinced the LIRR to incorporate the Flushing and Woodside Railroad on February 24, 1864 as a competing branch to Flushing.[3] [4] The branch ran from Woodside toward Great Neck Junction, with a branch to Whitestone. When the NY&F collapsed after construction of the Great Neck Extension, the LIRR acquired the railroad and left this branch unfinished. After Poppenhausen created the Flushing and North Side Railroad, he also acquired the Flushing and Woodside, but was able to complete construction of the line, which became the Woodside Branch of the Flushing and North Side. The line only contained one other station at Junction Boulevard and 35th Avenue called Grinnell station. This station opened on April 24, 1874 and closed in October 1877. East of Grinnell station and the Flushing River, there was a junction leading either toward the main line of the F&NS railroad or the Whitestone Branch.

North Shore Railroad

Despite service complaints, New York and Flushing established a subsidiary called the North Shore Railroad of Long Island on September 25, 1863 to extend the line from Flushing to Great Neck. The extension opened on October 27, 1866.[5] Unfortunately, the NY&F realized that they could not survive the competition, and sold their line (and their lease on the North Shore Railroad of Long Island.[6]) to the LIRR in 1867. The LIRR benefitted by preventing the South Side Railroad from using the New York and Flushing access to the LIRR's Long Island City terminal, and by keeping the North Side Railroad from extending east to Huntington in competition with the LIRR.[7] The LIRR also stopped construction on the incomplete Flushing and Woodside.[8] [9]

Formation

Flushing citizens, feeling they had been tricked into building the Flushing and Woodside in order to scare the Flushing and North Side into selling out to the LIRR, convinced wealthy residents of College Point and Whitestone, including Conrad Poppenhusen, to incorporate the Flushing and North Side Railroad on April 3, 1868. This company had the right to build a line from Long Island City to Flushing and beyond to Roslyn, with a branch from Flushing to Whitestone. The group gained control of the unfinished Flushing and Woodside Railroad, and opened its line to Flushing, paralleling the LIRR from Long Island City to Woodside, in 1868[10] and to College Point and Whitestone in 1869.[11] This new line attracted most of the traffic from the older New York and Flushing, and the LIRR wanted to get rid of its Flushing branch.

In 1869, an affiliate of the Flushing and North Side, the Whitestone and Westchester Railroad, built the Whitestone Branch. It was intended to cross the East River to Westchester County, but never had the chance to do so. The line had a spur to a freight dock on Flushing Bay which crossed the Woodside Branch and the connecting line between the Woodside and Whitestone Branches. After the Flushing Bay Freight spur, the line itself also crossed the Woodside Branch, and then merged with the Woodside-Whitestone connector before crossing the Flushing River. From there it contained four stations, one at Bridge Street, College Point, and two in Whitestone, one at 14th Avenue and the other at 155th Street, which has been called Whitestone Landing station, and Beechhurst Yacht Club station. Malba station was not built until decades after the line was acquired by the LIRR.

In 1869, the New York State Legislature authorized the Flushing and North Side to buy the New York and Flushing east of the LIRR crossing at [12] connections were built by the Flushing and North Side at Woodside/Winfield and Flushing to connect its lines. The New York and Flushing continued to own the line west of Winfield, and soon became the South Side Railroad's access to Long Island City.

The segment between what was to become the former and stations was abandoned for passenger service in 1875, and completely abandoned in 1880. Part of the right-of-way ran through what is today the Mount Zion Jewish Cemetery in Maspeth.[13] The Flushing and Woodside was merged into the Flushing and North Side in 1871, and its line was abandoned in favor of the ex-New York and Flushing line.[9] [14]

Proposed expansion

Since both the NY&F and F&NS planned to expand service east of Great Neck, subsidiaries of the railroad were created for this purpose. In the case of the F&NS, two proposed railroads included the North Shore and Port Washington Railroad and the Roslyn and Huntington Railroad. Neither of these proposals were carried out. In fact, they were eliminated during the merger with the Central Railroad of Long Island in 1874 (see below), although the LIRR did try to extend the line to Roslyn until 1882 due to the difficulty of construction around the Manhasset Valley.

Mergers

On June 19, 1874, all branches of the Flushing and North Side Railroad, including the Main Line to Great Neck were incorporated into the Flushing, North Shore and Central Railroad, which included the Central Railroad of Long Island. Two years later, it would become part of the Long Island Rail Road. Despite the failed attempt to extend the line from Great Neck to in 1882, wealthy Port Washington residents persuaded the LIRR to bring the terminus to their hometown in 1895. This required the construction of the Manhasset Viaduct over Manhasset Bay, which was completed on June 23, 1898. The Woodside and Whitestone Branches were abandoned.

Station listing

Main Line

LocationStationMiles (kilometers)
to Penn Station
Current Connections/notesHistory
58th Street (formerly Betts Avenue/Fifth Street) & 39th Avenue (formerly Riker Avenue), WoodsideWoodside
Subway:
Bus (New York City Bus): Q18, Q32, Q53
Opened November 15, 1869 on north side of tracks west of 58th Street; closed 1914 and demolished 1916 (replaced with current structure during grade crossing elimination)
WoodsideOpened July 1854 on southeast corner of 50th Avenue and 69th Street; moved to the junction in August 1876 to also serve the Main Line-->; closed 1929
ElmhurstOpened 1855 as Newtown; name changed to Elmhurst June 1897; closed 1985
CoronaService began June 26, 1854; station opened April 2, 1855 on west side of National Avenue as Fashion Race Course; renamed West Flushing when 108th Street was abandoned, and Corona in June 1872; closed 1963
Opened September 1854 on north side of line and east side of 108th Street; later abandoned and name assigned to later Corona station
Whitestone JunctionFor the Whitestone Branch. Located east of the current station.
Great Neck JunctionFor the Woodside Branch, Creedmoor Branch, and short-lived Flushing Branch. Located on the east bank of the Flushing River
Main Street and 41st Avenue, FlushingFlushing-Main Street9.5 (15.3)Subway:
Bus (New York City Bus): Q12, Q17, Q20, Q25, Q26, Q28, Q34, Q44, Q48, Q58
Bus (Nassau Inter-County Express): n20, n20L, n21
Service began June 26, 1854
150th Street and 41st Avenue, Flushing10.3 (16.6)Bus (New York City Bus): Q15Not built until either 1889 or 1890 by the LIRR.
162nd Street and Northern Boulevard, Flushing11.1 (17.9)Bus (New York City Bus): Q12, Q13, Q28Service began October 27, 1866, as East Flushing station until 1872. Sometimes called Flushing - Broadway station. Elevated between 1912 and 1913.
11.7 (18.8)Bus (New York City Bus): Q12, Q13, Q28, Q76 Not built until 1901 by the LIRR.
213th Street and 41st Avenue, Bayside12.6 (20.3)Bus (New York City Bus): Q13, Q31
235th Street and 41st Avenue, Douglaston13.9 (22.4)Bus (New York City Bus): Q12, QM3
Bus (Nassau Inter-County Express): n20G
Originally Little Neck Station between 1866 and June 1870.
14.5 (23.3)Bus (New York City Bus): Q12, Q36
Bus (Nassau Inter-County Express): n20G
Middle Neck Road and Station Plaza at Great Neck Road, Great Neck Plaza15.7 (25.3)Bus (Nassau Inter-County Express): n20G, n20H, n21, n25, n57, n58Service began on October 27, 1866, and served as the terminus of the line until 1898.
All stations beyond this point were built by the Long Island Rail Road as the Port Washington Branch which was completed on June 23, 1898

Original New York & Flushing section

LocationStationMiles (kilometers)
to Penn Station
Connections/notesHistory
Hunter's Point, Long Island CityHunter's Point1854. Later became Long Island City (LIRR station)
Long Island CityOpened in 1854. Acquired by the South Side Railroad of Long Island, before becoming an LIRR station. Decommissioned in 1998.
Junction with South Side Railroad of Long Island (now LIRR Montauk Branch) at Laurel Hill. Segment abandoned in 1880. LIRR installed small station from 1890-1900.
MaspethMaspeth1855 to 1858. Revived along Montauk Branch from 1895 and 1924.
WoodsideJunction between LIRR and NY&F Main Lines. The former NY&F between Laurel Hill and Winfield was abandoned in 1880.
Continues as F&NS Main Line to Great Neck.

Woodside Branch

LocationStationMiles (kilometers)
to Penn Station
Connections/notesHistory
5.1 (8.2)Subway:
Bus (New York City Bus): Q18, Q32, Q53
Western terminus of Woodside Branch
Grinnell1874–1877. Only station on the entire Woodside Branch. Was located at Junction Boulevard and 35th Avenue.
Junction with Central Railroad of Long Island.
Junction with Flushing Bay Freight Spur.
Eastern terminus at Junction with Whitestone Branch.
The entire line was abandoned<--in the late-1870's. -->

Whitestone Branch

LocationStationMiles (kilometers)
to Penn Station
Connections/notesHistory
Whitestone JunctionBegin at Port Washington Branch near Corona Yard east of the
current station.
Junction with Flushing Bay Freight Spur.
Connection to Woodside Branch.
FlushingFlushing–Bridge Street Named in order to distinguish itself from . 1870–1932.
College Point1869-1932.
MalbaOnly station on the line to have been built by the Long Island Railroad; 1909-1932.
WhitestoneWhitestone–14th AvenueWhitestone Line (NY&NST Trolley)1869-1932.
Whitestone Landing (at 155th Street). Also known as "Beechhurst Yacht Club Station". 1886-1932.
The entire line was abandoned on February 15, 1932.

External links

Notes and References

  1. Web site: PRR Chronology, 1854. June 2004.
  2. Web site: PRR Chronology 1859. March 2005.
  3. Web site: PRR Chronology, 1864. June 2004.
  4. Web site: Flushing and Woodside Railroad. Arrt's Arrchives.
  5. Web site: PRR Chronology, 1866. June 2004.
  6. Web site: PRR Chronology, 1866. June 2004.
  7. Web site: PRR Chronology 1867. June 2004.
  8. Book: Ron. Ziel. George H.. Foster. Steel Rails to the Sunrise. 1965.
  9. Book: Ross, Peter. A History of Long Island From its Earliest Settlement to the Present Time, History of the Long Island Railroad. 1903. 36.
  10. Web site: PRR Chronology 1868. June 2004.
  11. Web site: PRR Chronology 1867. June 2004.
  12. Web site: PRR Chronology 1869. June 2004.
  13. Web site: 1924 Long Island Railroad Corporate Blueprint. Arrt's Arrchives.
  14. Web site: PRR Chronology 1871. January 2005. 2010-08-05. 2013-10-14. https://web.archive.org/web/20131014023302/http://www.prrths.com/Hagley/PRR1871%20Jan%2005.pdf. dead.