Florida State Road 429 Explained

State:FL
Type:Toll
Route:429
Map Custom:yes
Map Notes:SR 429 highlighted in red
Maint:FTE and CFX
Length Mi:53.61
Length Round:3
Established:2000
Direction A:South
Terminus A: in Four Corners
Direction B:North
Terminus B: in Sanford
Junction: in Four Corners
in Winter Garden
in Apopka
in Apopka
Previous Type:SR
Next Type:SR
Previous Route:426
Next Route:430
Counties:Osceola, Orange, Lake, Seminole

State Road 429 (SR 429), also known as the Daniel Webster Western Beltway or Western Expressway south of US 441, and the Wekiva Parkway north of US 441, is a controlled-access toll road built and maintained by the Central Florida Expressway Authority (CFX), the Florida's Turnpike Enterprise, and the Florida Department of Transportation (FDOT). Its mainline extends 51.77miles from I-4 (SR 400) in Four Corners north to I-4 in Sanford. Control cities are Apopka and Tampa although the control cities for traffic at the entrances at US 441 and north are Orlando, Tampa, and Daytona Beach. SR 429 was originally planned as a western half of SR 417.

Route description

SR 429 traverses some of the highest elevations in Orange County and is often within a few miles of the Lake Wales Ridge. It runs along the west side of Greater Orlando, later curving around Apopka, crossing the Wekiva River into Seminole County and connecting with Interstate 4 and Florida State Road 417 to complete a nearly complete ring around the city. The road peaks at Mile Marker 13 where on clear days it is possible to see the skyline of downtown Orlando to the northeast and various portions of Walt Disney World Resort to the southeast.

Florida's Turnpike Enterprise maintains the portion of the expressway south of Seidel Road, and CFX controls the portion north of the interchange. FDOT controls the portion north of SR 46.

History

The highway is named the "Daniel Webster Western Beltway" in honor of Daniel Webster, Florida's longest-serving legislator and figure often involved in state transportation issues.[1] Due to various complications in the planning and zoning phases of the roadway, Section B would end up being constructed much later (nearly 15-20 years) than Sections A and C.

Section A

Section A is the original 10.6miles section from Florida's Turnpike in Ocoee, to US 441 in Apopka. It has a toll plaza in the middle, which was one of the first toll plazas in the Orlando area with open road tolling for users of the E-Pass and related electronic toll collection systems. The road itself was finished in July 2000, temporarily ending at SR 50, and the four-level cloverstack interchange with Florida's Turnpike was completed in February 2001. Prior to the reconstruction of the I-4/SR 408 interchange near Downtown Orlando in 2021, this interchange featured the highest ramp in the Orlando area.

SR 429 was planned to continue north from its original US 441 junction, but because the land needed for this proposed SR 429 extension’s right of way was not secured ahead of time, new housing was developed north of the US 441 junction. This forced a change in plans for the extension of SR 429, leading to the re-designation of the northernmost 1.9 miles of what was SR 429 to the newly-created State Road 451 (SR 451) toll road in January 2013. This “new” toll road — with minimal new construction (at its connection with the newly-constructed SR 414/SR 429/SR 451 interchange) — consisted primarily of existing roadway, and in essence, simply re-designated the portion of SR 429 north of its junction with SR 414. In doing so — and in order to continue northward extension of SR 429, the original section of roadway south of SR 414 was rerouted on a track to the west, on a newly constructed section of highway that is dually-designated as both SR 429 and SR 414 toll roads, and extends them both to an interchange with US 441 (SR 500/Orange Blossom Trail) which lies approximately 2.5 miles north-west of the original SR 429/US 441 junction (now the SR 451/US 441 junction). North of this interchange with US-441, the SR 414 designation ends, and the toll road continues under the SR 429 designation. Thus, this rerouting shifted the roadway to the west, allowing it to continue north of US-441 on secured land before turning eastward and rejoining the right-of-way that was planned for construction of the long-awaited Wekiva Parkway. The Wekiva Parkway (section B) would complete the ultimate goal of extending SR 429 northwards to a junction with I-4, and thereby complete a Western Beltway around the Orlando metro area.

Section B

Section B, also known as the Wekiva Parkway, is a 25miles section of SR 429 connecting from US 441 in Apopka to I-4 in Sanford. It had been under debate for over a decade due to its planned alignment being complicated by the ecologically fragile Wekiva River basin, shifting support from Lake County, and the need to re-align the planned path due to the original route being blocked by residential development to the north of Section A’s northern terminal junction with US-441. In 2004, an agreement was reached for its completion. Upon completion, it will be built largely as a long causeway with a limited number of exits to better control development in the region. It is now planned to link SR 429 with SR 417, creating a continuous beltway north of Orlando;[2] however, older plans involved a short drive on I-4 or its collector/distributor roads to reach SR 417.

On May 25, 2011, the Florida Department of Transportation and CFX announced that they were partnering to jointly explore the construction of the Wekiva Parkway extension. The proposed route will extend through Orange, Lake, and Seminole Counties and is estimated to cost $1.8 billion. Officials hope to break ground in 2012, with completion by 2021.[3]

On January 20, 2016, the first stub section from CR 435 (Mount Plymouth Road) near Haas Road in Orange County to SR 46 east of Camp Challenge Road in Lake County opened to traffic and it is the first all-electronic toll road in Central Florida.[4]

On July 27, 2017, the Wekiva Parkway's mainline was extended from the US 441 connector road to a new northern terminus at Kelly Park Road.[5]

On March 31, 2018, the Wekiva Parkway's mainline was extended from Kelly Park Road to a new northern terminus at SR 46. Along with this, a 3.36miles spur known as SR 453 connecting the Wekiva Parkway with SR 46 near Sorrento was opened in conjunction with the extension. This was the final section of the CFX's Section 2 of the road, and the final section of the CFX's section altogether. The final 12miles section of the Wekiva Parkway between SR 46 and I-4 is under construction and is planned to open in 2023. This section will be constructed and maintained by FDOT.[6] [7] [8] [9]

On May 16, 2022, a 6miles section of the Wekiva Parkway between SR 46 near Mount Plymouth to SR 46 just west of Longwood Markham Road in Seminole County opened to traffic. This was the longest section of FDOT's section of the highway to open and includes several wildlife crossing bridges.[10]

On August 1, 2022, the northbound lanes of a 2miles section of the Wekiva Parkway between SR 46 just west of Longwood Markham Road and SR 46 just west of Orange Boulevard in Seminole County opened to traffic,[11] while the southbound lanes opened to traffic on August 15, 2022.[12] [13]

On October 21, 2022, the ramp from westbound I-4 to southbound SR 429, along with the section of the southbound lanes to SR 46 opened to traffic. This section is 1.75miles in length.[14]

On January 26, 2024, the final segment of the Wekiva Parkway at SR 46 just west of Orange Boulevard in Seminole County to I-4 in Sanford opened to traffic, thus officially completing the entirety of SR 429 and by extension the greater beltway around Greater Orlando, comprising SR 429 along with SR 417.[15]

Section C

Section C is the 22miles section from Florida's Turnpike to I-4 (SR 400) in Four Corners south of Walt Disney World. The 3miles section from Florida's Turnpike to CR 535 was completed in December 2002. The part from CR 535 south to New Independence Parkway opened December 16, 2005, with the extension to US 192 opening December 23.[16] The Turnpike-maintained section, south of Seidel Road, was on a very tight construction schedule. An extended cold snap required the contractor to push to reach the opening date, although the interchanges at Western Way and Seidel Road were not complete. The Western Way interchange was not scheduled to open until Spring of 2006 to coincide with the opening of the new Expedition Everest ride at Disney's Animal Kingdom. The open road tolling gantry, while located north of US 192, was let for construction with the southern five miles (8 km) and was never intended to be open to traffic in conjunction with the 2005 opening between US 92 and Seidel. The Schofield Road interchange was identified as a future interchange, meaning that on December 23 no interchanges were open between US 192 and New Independence Parkway. Other openings were April 4, 2006[17] [18] for Western Way, April 12, 2006, for Seidel Road, and December 9, 2006, for the remainder from US 192 south to I-4.[19] The Schofield Road interchange opened in May 2015.

State Road 414 Phase 2

During June 2010, construction work began on the westward extension of SR 414. Approximately of SR 429 roadway was demolished and on May 14, 2012, a new interchange opened from SR 429 northbound to SR 414 eastbound and from SR 414 westbound to SR 429 southbound. SR 429 and SR 414 now run concurrently to a new interchange with US 441 near Plymouth where the SR 414 designation ends. The control city is Mount Dora. The road previously signed as SR 429 north of the current SR 414 interchange has been redesignated as SR 451 and has been extended across US 441 to a new northern terminus at Vick Road.

See also

External links

Notes and References

  1. News: Smith . James . Webster leaves Legislature with family, principles, faith intact . September 1, 2010 . Florida Baptist Witness . May 8, 2008 . dead . https://web.archive.org/web/20120307100542/http://www.gofbw.com/news.asp?ID=551 . March 7, 2012 .
  2. Web site: Home . wekivaparkway.com.
  3. News: State, Expressway Authority form partnership to build Wekiva Parkway. D'Marko. Dave. May 25, 2011. July 7, 2011. https://web.archive.org/web/20111024155246/http://www.cfnews13.com/article/news/2011/may/251337/State,-Expressway-Authority-form-partnership-to-build-Wekiva-Parkway. October 24, 2011. dead. Central Florida News 13. Orlando, FL.
  4. Web site: Wekiva Parkway - News.
  5. Web site: SR 429 Wekiva Parkway from US 441 to North of Ponkan Road / Prince Contracting.
  6. News: Commissioner Parks: Regional connectivity is key to raising Lake's quality of life. Parks. Sean. March 7, 2018. Daily Commercial. March 31, 2018.
  7. News: Wekiva Parkway segment set to open into Lake County. Spear. Kevin. March 16, 2018. Orlando Sentinel. March 31, 2018.
  8. News: New Wekiva Parkway section to open March 31. March 23, 2018. Fox 35 Orlando. March 31, 2018.
  9. News: As new stretch of Wekiva Parkway opens, concern for Mount Plymouth remains. Hudak. Stephen. March 30, 2018. Orlando Sentinel. March 31, 2018.
  10. News: Castro . Amanda . Lehman . Mark . Largest section of Wekiva Parkway opens . June 5, 2022 . . . May 16, 2022.
  11. News: DeMarco . Jack . New section of Wekiva Parkway set to open Monday . August 28, 2022 . . . July 31, 2022.
  12. News: McDaniel . Dave . Wekiva Parkway project set to open new road for drivers . August 28, 2022 . . . August 14, 2022.
  13. News: Streit . Katie . New section of Wekiva Parkway opens Monday in Seminole County . August 28, 2022 . . . August 14, 2022.
  14. News: Lehman . Mark . Connection from I-4 to Wekiva Parkway opens . October 22, 2022 . ClickOrlando . . October 21, 2022.
  15. News: Trezza . Matt . Wekiva Parkway, 25-mile toll road, officially opens in Central Florida . January 31, 2024 . . . January 26, 2024.
  16. News: Scott . Powers . Western Beltway pushes 5½ miles farther south . . December 16, 2005 . January 12, 2012 . dead . https://web.archive.org/web/20051220123035/http://www.orlandosentinel.com/orl-westernbelt1605dec16,0,736853.story . December 20, 2005 . mdy-all .
  17. News: Beth . Kassab . Scott . Powers . New road access to Disney to open . https://archive.today/20120713082935/http://pqasb.pqarchiver.com/orlandosentinel/access/1010500231.html?FMT=ABS&FMTS=ABS:FT&type=current&date=Mar+27,+2006&author=&pub=Orlando+Sentinel&edition=&startpage=8&desc=New+road+access+to+Disney+to+open . dead . July 13, 2012 . Orlando Sentinel . March 27, 2006 . January 12, 2012.
  18. News: Western Way Opens . Orlando, FL . . April 4, 2006 .
  19. News: Rich . Mckay . Drivers, rejoice: Last leg of Western Beltway open . https://archive.today/20120910150127/http://www.orlandosentinel.com/news/orl-beltway0906dec09,0,2628206.story?coll=orl-news-headlines . dead . September 10, 2012 . Orlando Sentinel . December 9, 2006 . January 12, 2012.