Fives–Hirson railway explained

Box Width:auto
Fives–Hirson Railway
Status:Open
Locale:France (Hauts-de-France)
Start:Lille
End:Hirson
Open:1869 - 1872
Owner:SNCF (1938–present)
Linelength:123km (76miles)
Tracks:Double track

The Fives–Hirson railway is a double tracked electrified railway line linking Lille-Flandres with Hirson.

History

The line opened in stages:[1]

Infrastructure

Electrification was complete by 1958. The line uses automatic block signalling (BAL, Bloc Automatique Lumineux).

References

50.2707°N 3.5874°W

Notes and References

  1. Web site: Rapports et délibérations - Nord, Conseil général. Gallica. 22 March 2014.