Other Name: | M25 North (planned name) Line 25 North |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | Operational |
Locale: | Fengtai and Fangshan districts Beijing |
Stations: | 16 |
Daily Ridership: | 102,600 (2014 Avg.) 132,100 (2014 Peak)[1] |
Operator: | Beijing Mass Transit Railway Operation Corporation Limited |
Character: | Underground and elevated |
Depot: | Yancun |
Stock: | 6-car Type B (BD24) |
Linelength: | 31.8km (19.8miles) |
Electrification: | third rail |
Map State: | collapsed |
The Fangshan Line of the Beijing Subway is a rapid transit line in western Beijing that runs from in Fangshan District north and east to in Fengtai District. The line is 31.8km (19.8miles). It is mainly elevated, including 10 elevated stations and 6 underground stations.[2] It allows residents of Beijing's western suburbs to connect to the rest of the Beijing Subway network. Fangshan line's color is
orange.It was opened on December 30, 2010. An expansion of the line came on December 30, 2017, with the opening of the one-station western extension to . The line was extended further north from Guogongzhuang station to the southwest corner of the Third Ring Road. The extension is 5.25km (03.26miles) in length and it is fully underground.[3] [4] The northern extension opened on December 31, 2020.[5]
The Fangshan line starts at, just west of the East Yancun Bridge, where it interchanges with the Yanfang line. Previously, it started at which is located at the intersection of Changhong West Road and Suzhuang Street in the Liangxiang area of Fangshan District. The line makes four stops in Liangxiang including at the Fangshan Campus of the Beijing Institute of Technology. The line then heads north to the towns of Guangyang and Changyang. After crossing the Yongding River, the Fangshan Line enters Fengtai District where the line makes two more stops, at Dabaotai near the Beijing World Park, and at Guogongzhuang, also the southern terminus of Line 9. The line then makes four stops further northeast connecting with Line 10 at and connecting with Line 16 at .
List of stations from northeast to southwest:
Station Name | Connections | Nearby Bus Stops | Distance [6] | Location | |||
---|---|---|---|---|---|---|---|
0.000 | 0.000 | Fengtai | |||||
1.138 | 1.138 | ||||||
1.793 | 2.931 | ||||||
1.671 | 4.602 | ||||||
(through service during weekday peak) | 1.386 | 5.988 | |||||
1.438 | 7.426 | ||||||
6.466 | 13.892 | Fangshan | |||||
4.042 | 17.934 | ||||||
2.150 | 20.084 | ||||||
1.474 | 21.558 | ||||||
2.003 | 23.561 | ||||||
1.188 | 24.749 | ||||||
1.739 | 26.488 | ||||||
1.333 | 27.821 | ||||||
1.331 | 29.152 | ||||||
2.305 | 31.457 | ||||||
In 2021, it was announced that there will be some through service between Line 9 and the Fangshan line. The operator is retrofitting the signal systems of both lines to achieve this.[7] [8] Through service started on 18 January 2023.[9]
The Phase 3 of the line will add 10.9 km, with 8 stations. The extension start from station on the Phase 2 of the Fangshan line and end at station (interchange to Line 4). New interchange stations on this project includes station (interchange to Line 14, 16, Daxing Airport Express), station (interchange to Line 1) and station (interchange to Line 4). According to the information released in July 2022, the extension is included in the "Beijing Rail Transit Phase III Construction Plan".[10]
Construction of the Fangshan Line was originally set to begin in 2012[11] but was moved up to April 1, 2009, to use stimulus funding provided by the government to counter the Financial Crisis of 2007-08.[12] The names of Phase 1 stations was announced on March 25, 2010, as a 7-day publicity.[13]
On December 30, 2010, the line began operating from Suzhuang to Dabaotai, but was not connected to any other line of the subway system. One year later, on December 31, 2011, the Dabaotai to section opened, linking the Fangshan Line with Line 9 and the rest of the subway network.
On December 30, 2017, the line was extended one stop westward to Yancun Dong (E).
On December 31, 2020, the line was extended north by 4 stations.
Segment | Commencement | Length | Station(s) | Name | |
---|---|---|---|---|---|
Dabaotai — Suzhuang | 30 December 2010 | 24.791NaN1[14] | 10 | Phase 1 | |
Guogongzhuang — Dabaotai | 31 December 2011 | 1 | |||
Suzhuang — Yancundong | 30 December 2017 | 2.21NaN1[15] | 1 | Western extension | |
Guogongzhuang — Dongguantounan | 31 December 2020 | 4.81NaN1 | 4 | Northern extension |