Fangshan line explained

Other Name:M25 North (planned name)
Line 25 North
Type:Rapid transit
System:Beijing Subway
Status:Operational
Locale:Fengtai and Fangshan districts
Beijing
Stations:16
Daily Ridership:102,600 (2014 Avg.)
132,100 (2014 Peak)[1]
Operator:Beijing Mass Transit Railway Operation Corporation Limited
Character:Underground and elevated
Depot:Yancun
Stock:6-car Type B (BD24)
Linelength:31.8km (19.8miles)
Electrification: third rail
Map State:collapsed

The Fangshan Line of the Beijing Subway is a rapid transit line in western Beijing that runs from in Fangshan District north and east to in Fengtai District. The line is 31.8km (19.8miles). It is mainly elevated, including 10 elevated stations and 6 underground stations.[2] It allows residents of Beijing's western suburbs to connect to the rest of the Beijing Subway network. Fangshan line's color is

orange.

It was opened on December 30, 2010. An expansion of the line came on December 30, 2017, with the opening of the one-station western extension to . The line was extended further north from Guogongzhuang station to the southwest corner of the Third Ring Road. The extension is 5.25km (03.26miles) in length and it is fully underground.[3] [4] The northern extension opened on December 31, 2020.[5]

Route

The Fangshan line starts at, just west of the East Yancun Bridge, where it interchanges with the Yanfang line. Previously, it started at which is located at the intersection of Changhong West Road and Suzhuang Street in the Liangxiang area of Fangshan District. The line makes four stops in Liangxiang including at the Fangshan Campus of the Beijing Institute of Technology. The line then heads north to the towns of Guangyang and Changyang. After crossing the Yongding River, the Fangshan Line enters Fengtai District where the line makes two more stops, at Dabaotai near the Beijing World Park, and at Guogongzhuang, also the southern terminus of Line 9. The line then makes four stops further northeast connecting with Line 10 at and connecting with Line 16 at .

Stations

List of stations from northeast to southwest:

Station NameConnectionsNearby Bus StopsDistance
[6]
Location
0.0000.000Fengtai
1.1381.138
1.7932.931
1.6714.602
(through service during weekday peak)1.3865.988
1.4387.426
6.46613.892Fangshan
4.04217.934
2.15020.084
1.47421.558
2.00323.561
1.18824.749
1.73926.488
1.33327.821
1.33129.152
2.30531.457

Through service

In 2021, it was announced that there will be some through service between Line 9 and the Fangshan line. The operator is retrofitting the signal systems of both lines to achieve this.[7] [8] Through service started on 18 January 2023.[9]

Future Development

Phase 3

The Phase 3 of the line will add 10.9 km, with 8 stations. The extension start from station on the Phase 2 of the Fangshan line and end at station (interchange to Line 4). New interchange stations on this project includes station (interchange to Line 14, 16, Daxing Airport Express), station (interchange to Line 1) and station (interchange to Line 4). According to the information released in July 2022, the extension is included in the "Beijing Rail Transit Phase III Construction Plan".[10]

History

Construction of the Fangshan Line was originally set to begin in 2012[11] but was moved up to April 1, 2009, to use stimulus funding provided by the government to counter the Financial Crisis of 2007-08.[12] The names of Phase 1 stations was announced on March 25, 2010, as a 7-day publicity.[13]

On December 30, 2010, the line began operating from Suzhuang to Dabaotai, but was not connected to any other line of the subway system. One year later, on December 31, 2011, the Dabaotai to section opened, linking the Fangshan Line with Line 9 and the rest of the subway network.

On December 30, 2017, the line was extended one stop westward to Yancun Dong (E).

On December 31, 2020, the line was extended north by 4 stations.

SegmentCommencementLengthStation(s)Name
Dabaotai — Suzhuang30 December 201024.791NaN1[14] 10Phase 1
Guogongzhuang — Dabaotai31 December 20111
Suzhuang — Yancundong30 December 20172.21NaN1[15] 1Western extension
Guogongzhuang — Dongguantounan31 December 20204.81NaN14Northern extension

Notes and References

  1. Web site: http://www.tocc.org.cn/xxzx/jtxxfw/yxjc/jtyxfx/ryxfx/201405/t20140501_87902.htm. zh:2014年4月30日综合交通总体运行情况. 2014-05-02. 北京市交通信息中心 北京市交通运行监测调度中心. 2014-05-01. https://web.archive.org/web/20140502194541/http://www.tocc.org.cn/xxzx/jtxxfw/yxjc/jtyxfx/ryxfx/201405/t20140501_87902.htm. 2014-05-02. dead.
  2. http://business.sohu.com/20100324/n271058024.shtml 北京地铁房山线规划方案公布 设车站11座
  3. Web site: 2015-11-19. 房山线将延伸"牵手"多条地铁.
  4. Web site: 2018-03-12. 北京轨道交通房山线北延四环路站通过结构验收. 2021-10-05. 2020-08-08. https://web.archive.org/web/20200808170514/http://zjw.beijing.gov.cn/bjjs/xxgk/zwdt/509554/index.shtml. dead.
  5. News: 明日起,地铁房山线北延、16号线中段和有轨电车T1线开通试运营!. 2020-12-30.
  6. Web site: 站间距信息 北京地铁官方网站 . Beijing Subway . 2020-01-07.
  7. Web site: 2021-04-12. 今年房山线和9号线跨线运营. https://web.archive.org/web/20210506145926/http://liuyan.people.com.cn/threads/content?tid=9646112. 2021-05-06. 2021-05-06.
  8. Web site: 2021-03-25. 1号线八通线 房山线9号线 今年实现跨线运营. https://web.archive.org/web/20210325031930/http://www.bj.xinhuanet.com/2021-03/25/c_1127252466.htm. 2021-03-25. 2021-05-06.
  9. News: 工作日早晚高峰运行!明起房山线9号线部分列车开始跨线运行. 2023-01-17. 2023-01-18.
  10. Web site: 附件1:北京市轨道交通第三期建设规划(2022-2027年)环境影响报告书(征求意见稿).pdf. 2022-07-08. July 8, 2022. https://web.archive.org/web/20220708041025/https://www.rails.cn/download/2022/%E9%99%84%E4%BB%B61%EF%BC%9A%E5%8C%97%E4%BA%AC%E5%B8%82%E8%BD%A8%E9%81%93%E4%BA%A4%E9%80%9A%E7%AC%AC%E4%B8%89%E6%9C%9F%E5%BB%BA%E8%AE%BE%E8%A7%84%E5%88%92%EF%BC%882022-2027%E5%B9%B4%EF%BC%89%E7%8E%AF%E5%A2%83%E5%BD%B1%E5%93%8D%E6%8A%A5%E5%91%8A%E4%B9%A6%EF%BC%88%E5%BE%81%E6%B1%82%E6%84%8F%E8%A7%81%E7%A8%BF%EF%BC%89.pdf. live.
  11. http://news.sina.com.cn/c/2008-06-29/002515834782.shtml "北京轨道交通房山线提前至年内开工", 北京晨报
  12. http://epaper.jinghua.cn/html/2009-01/07/content_382029.htm "地铁房山线11座站名确定" 京华时报
  13. Web site: 北京地铁15号线、房山线站名公示听取意见(附站名)_手机网易网 . 3g.163.com . dead . https://web.archive.org/web/20190326183300/http://3g.163.com/news/article/62MII1VA000146BD.html . 2019-03-26.
  14. Web site: 房山线北延四站明年开工. 北起丰台区郭公庄站,南至房山区苏庄站。全长24.79公里,设11座车站.
  15. Web site: 全自动、磁浮、有轨电车 北京宣布开通三条轨道交通新线. https://web.archive.org/web/20171230013152/http://www.xinhuanet.com/local/2017-12/29/c_1122187776.htm. dead. December 30, 2017. 2017-12-29. 30日还将开通房山线阎村东至苏庄的一站一区间,长度约2.2公里.