Evelyn station explained

Evelyn
Style:SCVTA
Symbol:yes
Symbol Location:santaclara
Address:Evelyn Avenue at Pioneer Way
Borough:Mountain View, California
Coordinates:37.3909°N -122.0664°W
Platform:1 side platform
Parking:196 spaces
Accessible:Yes
Other Services Header:Former services
Mapframe:yes
Mapframe-Zoom:14

Evelyn station is a former VTA light rail station located in Mountain View, California. The station platform was on the then-single-track section east of Downtown Mountain View station. It was accessed via a pedestrian tunnel under the Caltrain tracks from Evelyn Avenue at the intersection with Pioneer Way. The station was closed and demolished in 2015 to permit double-tracking of the line.

History

The station was built as part of the Tasman West extension project and opened December 17, 1999. The VTA decided in August 2014 to close and remove Evelyn station early in 2015. As part of the Light Rail Efficiency Project, a second track was added between Mountain View station and Whisman station for the Mountain View–Winchester, and leaving Evelyn in place would have required narrowing Central Expressway and Evelyn Avenue to accommodate the track.[1] According to VTA, the station was the second least-utilized station in the VTA light rail system.

After the station closed in 2015, the park and ride lot across the street from the station remained available to transit passengers but was lightly used.[2] [3] In May 2019, the lot was leased to the City of Mountain View who plans to use the lot as a safe place for people living in vehicles to park. The long-term plan is to use the two-acre parking lot parcel to build 180 affordable apartments.[4]

Notes and References

  1. Permanent Evelyn Station Closure Begins March 16. Ethan. Winston. Santa Clara Valley Transportation Authority. March 5, 2015. March 15, 2015.
  2. News: DeBolt . Daniel . VTA pulls plug on Evelyn station . Mountain View Voice . August 15, 2014.
  3. News: Hassan . Anser . Mountain View plans to convert VTA parking lot into parking spot for homeless . May 28, 2020 . . May 9, 2019 . en.
  4. News: Noack . Mark . Mountain View leases land for safe parking, affordable housing . May 28, 2020 . Mountain View Voice . May 9, 2019 . en.