Eurovea Tower | |
Location: | Ružinov, Bratislava, Slovakia |
Coordinates: | 48.1398°N 17.1272°W |
Address: | 821 09 Ružinov, Slovakia |
Status: | Complete |
Building Type: | Residential |
Floor Count: | 46 |
Start Date: | 2019 |
Completion Date: | 2023 |
Roof: | 168m (551feet) |
Structural System: | Concrete |
Floor Area: | 12400sigfig=3NaNsigfig=3 |
Elevator Count: | 6 |
Developer: | J&T Real Estate, a.s. |
Architect: | GFI Architektúra + Dizajn |
Main Contractor: | STRABAG AG; SYTIQ as; VHS-PS, S.R.O. |
The Eurovea Tower is a high-rise residential skyscraper in Bratislava, Slovakia. The building was inaugurated in 2022 and stands at 168 metres (551 ft) tall, being divided into 46 floors.[1] It is the tallest building in Slovakia and the first skyscraper over 150m (490feet) built in the country.[2] [3] The tower is part of Eurovea City complex and housing 389 apartments.[4]
The construction of the landmark began in March 2019 and was completed in the fall of 2023. The tower contains 408 apartments and 1,400 parking spaces. The developer is J&T Real Estate and the main architects are GFI Architektúra + Dizajn. The tower has six super-fast elevators that can travel at a speed of 6 m/s (22 km/h). These elevators broke the national record for the fastest elevator in the country and the highest superfast elevator in eastern Europe.[5]
The landmark tower is part of the second phase of the Eurovea project and is located on Pribinová Street, where several other high-rise buildings are under construction or planned by main developer Developer J&T Real Estate.[6] The details regarding the second extension of the project show 24,000 m2 (260,000 sq ft) of retail space to be added, 389 apartments in Eurovea Tower and 96 apartments in Eurovea Riverside, 40,300 m2 (434,000 sq ft) of office space, 2.245 parking spots, green area on the riverfront will grow by two times (from 8,400 to 15,000 m2 (90,000 to 161,000 sq ft)).[7]