The Extremely Large Telescope (ELT) is an astronomical observatory under construction.[1] When completed, it will be the world's largest optical/near-infrared ELT. Part of the European Southern Observatory (ESO) agency, it is located on top of Cerro Armazones in the Atacama Desert of northern Chile.

The design consists of a reflecting telescope with a 39.3m (128.9feet) segmented primary mirror and a 4.2sigfig=2NaNsigfig=2 diameter secondary mirror. The telescope will be supported by adaptive optics, six laser guide star units, and multiple large science instruments. The observatory's design will gather 100 million times more light than the human eye, equivalent to about 10 times more light than the largest optical telescopes existing as of 2023, and will correct for atmospheric distortion. It has around 250 times the light gathering area of the Hubble Space Telescope and, according to the ELT's specifications, will provide images 16 times sharper than those from Hubble.[2]

The project was originally called the European Extremely Large Telescope (E-ELT), but the name was shortened in 2017.[3] The ELT is intended to advance astrophysical knowledge by enabling detailed studies of planets around other stars, the first galaxies in the Universe, supermassive black holes, and the nature of the Universe's dark sector, and to detect water and organic molecules in protoplanetary disks around other stars. As planned in 2011, the facility was expected to take 11 years to construct, from 2014 to 2025.[4]

On 11 June 2012, the ESO Council approved the ELT programme's plans to begin civil works at the telescope site, with the construction of the telescope itself pending final agreement with governments of some member states. Construction work on the ELT site started in June 2014. By December 2014, ESO had secured over 90% of the total funding and authorized construction of the telescope to start, which will cost around one billion euros for the first construction phase. The first stone of the telescope was ceremonially laid on 26 May 2017, initiating the construction of the dome's main structure and telescope.[5] The telescope passed the halfway point in its development and construction in July 2023, with completion and first light planned at that time for 2028.[6] [7]

History

On 26 April 2010, the European Southern Observatory (ESO) Council selected Cerro Armazones, Chile, as the baseline site for the planned ELT. Other sites that were under discussion included Cerro Macon, Salta, in Argentina; Roque de los Muchachos Observatory, on the Canary Islands; and sites in North Africa, Morocco, and Antarctica.[8]

Early designs included a segmented primary mirror with a diameter of 42sigfig=2NaNsigfig=2 and an area of about 1300sigfig=3NaNsigfig=3, with a secondary mirror with a diameter of 5.9sigfig=2NaNsigfig=2. However, in 2011 a proposal was put forward to reduce overall size by 13% to 978 m2, with a 39.3sigfig=2NaNsigfig=2 diameter primary mirror and a 4.2sigfig=2NaNsigfig=2 diameter secondary mirror.[9] This reduced projected costs from 1.275 billion to 1.055 billion euros and should allow the telescope to be finished sooner. The smaller secondary is a particularly important change; 4.2sigfig=2NaNsigfig=2 places it within the capabilities of multiple manufacturers, and the lighter mirror unit avoids the need for high-strength materials in the secondary mirror support spider.

ESO's Director General commented in a 2011 press release that "With the new E-ELT design we can still satisfy the bold science goals and also ensure that the construction can be completed in only 10–11 years."[10] The ESO Council endorsed the revised baseline design in June 2011 and expected a construction proposal for approval in December 2011. Funding was subsequently included in the 2012 budget for initial work to begin in early 2012.[11] The project received preliminary approval in June 2012. ESO approved the start of construction in December 2014, with over 90% funding of the nominal budget secured.

The design phase of the 5-mirror anastigmat was fully funded within the ESO budget. With the 2011 changes in the baseline design (such as a reduction in the size of the primary mirror from 42 m to 39.3 m), in 2017 the construction cost was estimated to be €1.15 billion (including first generation instruments).[12] [13] In 2014, the start of operations was planned for 2024. Actual construction officially began in early 2017,[14] and a technical first light is planned for 2028.

Planning

ESO focused on the current design after a feasibility study concluded the proposed 100sigfig=3NaNsigfig=3 diameter, Overwhelmingly Large Telescope, would cost €1.5 billion (£1 billion), and be too complex. Both current fabrication technology and road transportation constraints limit single mirrors to being roughly 8sigfig=2NaNsigfig=2 per piece. The next-largest telescopes currently in use are the Keck Telescopes, the Gran Telescopio Canarias and the Southern African Large Telescope, which each use small hexagonal mirrors fitted together to make a composite mirror slightly over 10sigfig=2NaNsigfig=2 across. The ELT uses a similar design, as well as techniques to work around atmospheric distortion of incoming light, known as adaptive optics.

A 40-metre-class mirror will allow the study of the atmospheres of extrasolar planets.[15] The ELT is the highest priority in the European planning activities for research infrastructures, such as the Astronet Science Vision and Infrastructure Roadmap and the ESFRI Roadmap.[16] The telescope underwent a Phase B study in 2014 that included "contracts with industry to design and manufacture prototypes of key elements like the primary mirror segments, the adaptive fourth mirror or the mechanical structure (...) [and] concept studies for eight instruments".

Design

The ELT will use a novel design with a total of five mirrors.[17] The first three mirrors are curved (non-spherical) and form a three-mirror anastigmat design for excellent image quality over the 10-arcminute field of view (one-third of the width of the full Moon). The fourth and fifth mirrors are (almost) flat, and respectively provide adaptive optics correction for atmospheric distortions (mirror 4) and tip-tilt correction for image stabilization (mirror 5). The fourth and fifth mirrors also send the light sideways to one of two Nasmyth focal stations at either side of the telescope structure, allowing multiple large instruments to be mounted simultaneously.

ELT mirror and sensors contracts

Primary mirror

The 39-metre primary mirror will be composed of 798 hexagonal segments, each approximately 1.4 metres across and with 50 mm thickness.[18] Two segments will be re-coated and replaced each working day, to keep the mirror always clean and highly reflective.

Edge sensors constantly measure the positions of the primary mirror segments relative to their immediate neighbours. 2394 position actuators (3 for each segment) use this information to adjust the system, keeping the overall surface shape unchanged against deformations caused by external factors such as wind, gravity, temperature changes and vibrations.[19]

In January 2017,[20] ESO awarded the contract for the fabrication of the 4608 edge sensors to the FAMES consortium, which is composed of French company Fogale[21] and German company Micro-Epsilon.[22] These sensors can measure relative positions to an accuracy of a few nanometres, the most accurate ever used in a telescope.

In May 2017, ESO awarded two additional contracts. One was awarded to the German company Schott AG who will manufacture the blanks of the 798 segments, as well as a maintenance set of 133 additional segments. This maintenance set allows segments to be removed, replaced, and recoated on a rotating basis once the ELT is in operation. The mirror is being cast from the same low-expansion ceramic Zerodur as the existing Very Large Telescope mirrors in Chile.

The other contract was awarded to the French company, Safran Reosc,[23] a subsidiary of Safran Electronics & Defense. They will receive the mirror blanks from Schott, and polish one mirror segment per day to meet the 7-year deadline. During this process, each segment will be polished until it has no surface irregularity greater than 7.5 nm root mean square. Afterward, Safran Reosc will then mount, test, and complete all optical testing before delivery. This is the second-largest contract for ELT construction and the third-largest contract ESO has ever signed.

The segment support system units for the primary mirror are designed and produced by CESA (Spain)[24] and VDL (the Netherlands). The contracts signed with ESO also include the delivery of detailed and complete instructions and engineering drawings for their production. Additionally, they include the development of the procedures required to integrate the supports with the ELT glass segments; to handle and transport the segment assemblies; and to operate and maintain them.[25]

As of July 2023, over 70% of the mirror segment blanks and their supporting structures have been manufactured, and by early 2024 tens of segments had been polished.[26]

Secondary mirror

Making the secondary mirror is a major challenge as it is highly convex, and aspheric. It is also very large; at 4.2 metres in diameter and weighing 3.5 tonnes, it will be the largest secondary mirror ever employed on an optical telescope and the largest convex mirror ever produced.

In January 2017,[20] ESO awarded a contract for the mirror blank to Schott AG, who cast it later the same year from Zerodur. In May 2017,[27] Schott AG was also awarded the contract for the much larger primary segment of the mirror.

Complex support cells are also necessary to ensure the flexible secondary and tertiary mirrors retain their correct shape and position; these support cells will be provided by SENER.[28] Like the tertiary mirror, the secondary mirror will be mounted on 32 points, with 14 along its edges and 18 on the back. The entire assembly will be mounted on a hexapod, allowing its position to be aligned every few minutes to sub-micrometer precision. Deformations on the secondary mirror have a much smaller effect on the final image compared to errors on the tertiary, quaternary, or quinary mirrors.

The pre-formed glass-ceramic blank of the secondary mirror is being polished and tested by Safran Reosc.[29] [30] The mirror will be shaped and polished to a precision of 15 nanometres (15 millionths of a millimetre) over the optical surface.

By early 2024 this mirror was reported to be close to final accuracy.[26]

Tertiary mirror

The 3.8-metre concave tertiary mirror, also cast from Zerodur, will be an unusual feature of the telescope. Most current large telescopes, including the VLT and the NASA/ESA Hubble Space Telescope, use two curved mirrors to form an image. In these cases, a small, flat tertiary mirror is sometimes introduced to divert the light to a convenient focus. However, in the ELT the tertiary mirror also has a curved surface, as the use of three mirrors delivers a better final image quality over a larger field of view than would be possible with a two-mirror design.[20]

Much like the secondary mirror (with which it shares many design characteristics), the tertiary mirror will be slightly deformable to regularly allow deviations to be corrected. Both mirrors will be mounted on 32 points, with 18 on their backside and 14 along their edges.[31]

As of July 2023, the tertiary mirror has been cast and is in polishing.

Quaternary mirror

The 2.4-metre quaternary mirror is a 2-millimeter-thick flat adaptive mirror. With up to 8000 actuators, the surface can be readjusted one thousand times per second.[32] The deformable mirror will be the largest adaptive mirror ever made,[33] and consists of six component petals, control systems, and voice-coil actuators. The image distortion caused by the turbulence of the Earth's atmosphere can be corrected in real-time, as well as deformations caused by the wind upon the main telescope. The ELT's adaptive optics system will provide an improvement of about a factor of 500 in the resolution compared to the best seeing conditions achieved so far without adaptive optics.[33] The AdOptica consortium,[34] partnered with INAF (Istituto Nazionale di Astrofisica) as subcontractors, are responsible for the design and manufacture of the quaternary mirror.[35] The 6 petals were cast by Schott in Germany and polished by Safran Reosc.[36] [37]

As of July 2023, all 6 petals are completed and in the process of being integrated into their support structure. The six laser sources for the adaptive optics system, which will work hand-in-hand with the quaternary mirror, have also been completed and are in testing.

Quinary mirror

The 2.7-metre by 2.2-metre quinary mirror is a tip-tilt mirror used to refine the image using adaptive optics. The mirror will include a fast tip-tilt system for image stabilization that will compensate perturbations caused by wind, atmospheric turbulence, and the telescope itself before reaching the ELT instruments.[38]

As of early 2024 the six component petals had been fabricated and are being brazed into a single unit.[26]

ELT dome and structure

Dome construction

The ELT dome will have a height of nearly 74 metres from the ground and a diameter of 86 metres,[39] making it the largest dome ever built for a telescope. The dome will have a total mass of around 6100 tonnes, and the telescope mounting and tube structure will have a total moving mass of around 2800 tonnes.

For the observing slit, two main designs were under study: one with two sets of nested doors, and the current baseline design, i.e. a single pair of large sliding doors. This pair of doors has a total width of 45.3 m.

ESO signed a contract for its construction,[40] together with the main structure of the telescopes, with the Italian ACe Consortium, consisting of Astaldi and Cimolai[41] and the nominated subcontractor, Italy's EIE Group.[42] The signature ceremony took place on 25 May 2016[43] at ESO's Headquarters in Garching bei München, Germany.

The dome is to provide needed protection to the telescope in inclement weather and during the day. A number of concepts for the dome were evaluated. The baseline concept for the 40m-class ELT dome is a nearly hemispherical dome, rotating atop a concrete pier, with curved laterally-opening doors. This is a re-optimisation from the previous design, aimed at reducing the costs, and it is being revalidated to be ready for construction.[44]

One year after signing the contract, and after the laying of the first stone ceremony in May 2017, the site was handed over to ACe, signifying the beginning of the construction of the dome's main structure.

Astronomical performance

In terms of astronomical performance the dome is required to be able to track about the 1-degree zenithal avoidance locus as well as preset to a new target within 5 minutes. This requires the dome to be able to accelerate and move at angular speeds of 2 degrees/s (the linear speed is approximately 5 km/h).[45]

The dome is designed to allow complete freedom to the telescope so that it can position itself whether it is opened or closed. It will also permit observations from the zenith down to 20 degrees from the horizon.

Windscreen

With such a large opening, the ELT dome requires the presence of a windscreen to protect the telescope's mirrors (apart from the secondary), from direct exposure to the wind. The baseline design of the windscreen minimises the volume required to house it. Two spherical blades, either side of the observing slit doors, slide in front of the telescope aperture to restrict the wind.

Ventilation and air-conditioning

The dome design ensures that the dome provides sufficient ventilation for the telescope not to be limited by dome seeing. For this the dome is also equipped with louvers, whereby the windscreen is designed to allow them to fulfill their function.

Computational fluid dynamic simulations and wind tunnel work are being carried out to study the airflow in and around the dome, as well as the effectiveness of the dome and windscreen in protecting the telescope.

Besides being designed for water-tightness, air-tightness is also one of the requirements as it is critical to minimise the air-conditioning load. The air-conditioning of the dome is necessary not only to thermally prepare the telescope for the forthcoming night but also in order to keep the telescope optics clean.

The air-conditioning of the telescope during the day is critical and the current specifications permit the dome to cool the telescope and internal volume by 10 °C over 12 hours.

Science goals

The ELT will search for extrasolar planets—planets orbiting other stars. This will include not only the discovery of planets down to Earth-like masses through indirect measurements of the wobbling motion of stars perturbed by the planets that orbit them, but also the direct imaging of larger planets and possibly even the characterisation of their atmospheres.[46] The telescope will attempt to image Earthlike exoplanets.

Furthermore, the ELT's suite of instruments will allow astronomers to probe the earliest stages of the formation of planetary systems and to detect water and organic molecules in protoplanetary discs around stars in the making. Thus, the ELT will answer fundamental questions regarding planet formation and evolution.[47]

By probing the most distant objects the ELT will provide clues to understanding the formation of the first objects that formed: primordial stars, primordial galaxies and black holes and their relationships. Studies of extreme objects like black holes will benefit from the power of the ELT to gain more insight into time-dependent phenomena linked with the various processes at play around compact objects.

The ELT is designed to make detailed studies of the first galaxies. Observations of these early galaxies with the ELT will give clues that will help understand how these objects form and evolve. In addition, the ELT will be a unique tool for making an inventory of the changing content of the various elements in the Universe with time, and to understand star formation history in galaxies.

One of the goals of the ELT is the possibility of making a direct measurement of the acceleration of the Universe's expansion. Such a measurement would have a major impact on our understanding of the Universe. The ELT will also search for possible variations in the fundamental physical constants with time. An unambiguous detection of such variations would have far-reaching consequences for our comprehension of the general laws of physics.

Instrumentation

The telescope will have several science instruments and will be able to switch from one instrument to another within minutes. The telescope and dome will also be able to change positions on the sky and start a new observation in a short time.

Four of its instruments, the first generation, will be available at or shortly after first light, while two others will begin operations later. Throughout its operation other instruments can be installed.[48]

The first generation includes four instruments: MICADO, HARMONI and METIS, along with the adaptive optics system MORFEO.

The second generation of instruments consists of MOSAIC and ANDES.

Comparison

One of the largest optical telescopes operating today is the Gran Telescopio Canarias, with a 10.4 m aperture and a light-collecting area of 74 m2. Other planned extremely large telescopes include the 25 m/368 m2 Giant Magellan Telescope and 30 m/655 m2 Thirty Meter Telescope, which are also targeting the second half of the 2020 decade for completion. These two other telescopes roughly belong to the same next generation of optical ground-based telescopes.[55] [56] Each design is much larger than previous telescopes.

The size of the ELT has been reduced from its original design (Overwhelmingly Large Telescope). Even with that reduction, the ELT is significantly larger than both other planned extremely large telescopes. It has the aim of observing the universe in greater detail than the Hubble Space Telescope by taking images 15 times sharper, although it is designed to be complementary to space telescopes, which typically have very limited observing time available. The ELT's 4.2-metre secondary mirror is the same size as the primary mirror on the William Herschel Telescope, the second largest optical telescope in Europe.

Name Aperture
diameter (m)
Collecting
area (m²)
First light Ref
align=left Extremely Large Telescope (ELT) 39.3 978 2028 [57]
align=left Thirty Meter Telescope (TMT) 30.0 655 ?
align=left Giant Magellan Telescope (GMT) 25.4 368 2029 [58]
align=left Southern African Large Telescope (SALT) 11.1 × 9.8 79 2005
align=left Gran Telescopio Canarias (GTC) 10.4 74 2007
align=left 10.0 76 1990, 1996
align=left Very Large Telescope (VLT) 8.2 50 (×4) 1998–2000
Notes: Future first-light dates are provisional and likely to change.

The ELT under ideal conditions has an angular resolution of 0.005 arcsecond which corresponds to separating two light sources 1 AU apart from 200lk=inNaNlk=in distance, or two light sources 30 cm apart from roughly 12,000 km distance. At 0.03 arcseconds, the contrast is expected to be 108, sufficient to search for exoplanets.[59] The unaided human eye has an angular resolution of 1 arcminute which corresponds to separating two light sources 30 cm apart from 1 km distance.

See also

External links

Notes and References

  1. News: Overbye . Dennis . Dennis Overbye . Good News and Bad News for Astronomers’ Biggest Dream - The National Science Foundation takes a step (just one) toward an "extremely large telescope." . 8 March 2024 . . live . https://archive.today/20240308112703/https://www.nytimes.com/2024/03/08/science/astronomy-extremely-large-telescope.html . 8 March 2024 . 8 March 2024 .
  2. Web site: The European Extremely Large Telescope ('ELT') Project . European Southern Observatory .
  3. Web site: information@eso.org . Renaming the E-ELT - Statement from ESO's Director General . 2023-10-09 . www.eso.org . en.
  4. News: The E-ELT construction proposal . European Southern Observatory . 16 January 2011 .
  5. News: Construction begins on world's largest telescope in Chilean desert. 26 May 2017. Reuters.
  6. Web site: ELT Timeline .
  7. Web site: ESO's Extremely Large Telescope is now half completed . European Southern Observatory .
  8. Vernin, Jean . Muñoz-Tuñón, Casiana . Sarazin, Marc . Vazquez Ramió, Héctor . Varela, Antonia M. . Trinquet, Hervé . Miguel Delgado, José . Jiménez Fuensalida, Jesús . Reyes, Marcos . Benhida, Abdelmajid . Benkhaldoun, Zouhair . García Lambas, Diego . Hach, Youssef . Lazrek, M. . Lombardi, Gianluca . Navarrete, Julio . Recabarren, Pablo . Renzi, Victor . Sabil, Mohammed . Vrech, Rubén . European Extremely Large Telescope Site Characterization I: Overview . Publications of the Astronomical Society of the Pacific . 1 November 2011 . 123 . 909 . 1334–1346 . 10.1086/662995 . 2011PASP..123.1334V . 120016246 . 22 June 2014 . https://web.archive.org/web/20160304030723/http://www.iac.es/site-testing/images/documents/pasp_overview.pdf . 4 March 2016 .
  9. News: Schilling . Govert . 14 June 2011 . Europe Downscales Monster Telescope to Save Money . Science Insider . 29 June 2020.
  10. News: ESO Moves One Step Closer to the First Extremely Large Telescope . ESO . 15 June 2011 . 17 August 2011 .
  11. Web site: The E-ELT Moves Closer to Reality . ESO . 9 December 2011.
  12. Web site: ESO's collaboration with industry. Xavier Bacons. ESO. 22 December 2017. 14 January 2018.
  13. Web site: ESO – Preparing a Revolution . 24 January 2018 . 10 April 2019 . https://web.archive.org/web/20190410220027/https://www.eso.org/public/teles-instr/elt/elt_rev/ . dead .
  14. Web site: Construction begins on the world's first super telescope. phys.org.
  15. Book: An Expanded View of the Universe – Science with the European Extremely Large Telescope. ESO Science Office.
  16. Web site: ESO – Europe's Window on the Universe . 15 June 2011.
  17. Hippler. Stefan. Adaptive Optics for Extremely Large Telescopes. Journal of Astronomical Instrumentation. 8. 2. 1950001–322. 2019. 10.1142/S2251171719500016. 2019JAI.....850001H. 1808.02693. 119505402.
  18. Web site: ESO – E-ELT Optics. www.eso.org. 24 January 2017. de.
  19. Web site: Multiple E-ELT Mirror Segments Tested Together for the First Time. www.eso.org. 24 January 2017.
  20. Web site: Contracts Signed for ELT Mirrors and Sensors. www.eso.org. 24 January 2017.
  21. Web site: FOGALE nanotech. www.fogale.fr. 24 January 2017.
  22. Web site: High precision sensors, measurement devices and systems. www.micro-epsilon.com. 24 January 2017. en.
  23. Web site: Safran Reosc. Safran Reosc. 29 May 2017.
  24. Web site: Compañía Española de Sistemas Aeronáuticos. 29 May 2017.
  25. Web site: ESO Awards Contracts for E-ELT Primary Mirror Segment Support System Units. www.eso.org. 29 May 2017.
  26. Web site: ESO’s ELT halfway through construction . Roberto Tamai. SPIE . June 19, 2024.
  27. Web site: 2017-05-30 . ESO signs contracts for the ELT's gigantic primary mirror . live . https://web.archive.org/web/20240614114357/https://phys.org/news/2017-05-eso-elt-gigantic-primary-mirror.html . 2024-06-14 . 2024-06-14 . Phys.org.
  28. Web site: SENER group . dead . https://web.archive.org/web/20170227121133/http://www.engineeringandconstruction.sener/sener-group . 2017-02-27 . 2017-01-24 . . es.
  29. Web site: ESO Signs Contract to Polish the E-ELT Secondary Mirror – French company Reosc will polish the largest secondary mirror ever built. www.eso.org. 24 January 2017.
  30. Web site: Safran. Safran. 24 January 2017.
  31. Web site: M2 and M3 Mirrors. ESO. 12 July 2023.
  32. Web site: ESO – E-ELT Optics. www.eso.org. 29 May 2017. de.
  33. Web site: ESO Awards Contract for E-ELT Adaptive Mirror Design Study. www.eso.org. 29 May 2017.
  34. Web site: www.adoptica.it. www.adoptica.it. 29 May 2017.
  35. Web site: Contract Signed for Final Design and Construction of Largest Adaptive Mirror Unit in the World. www.eso.org. 29 May 2017.
  36. Web site: ESO Signs Contract for Deformable Shell Mirrors for E-ELT. www.eso.org. 29 May 2017.
  37. Web site: M4 Mirror. www.eso.org. 12 July 2023.
  38. Web site: M5 Mirror. 7 July 2021 . European Southern Observatory.
  39. Web site: Construction of the ELT Dome Foundations Begins. 27 September 2019. 21 November 2020.
  40. Web site: ESO Signs Largest Ever Ground-based Astronomy Contract for ELT Dome and Telescope Structure. www.eso.org. 29 May 2017.
  41. Web site: Cimolai – Home Page. www.cimolai.com. 29 May 2017.
  42. Web site: EIE GROUP Home. www.eie.it. 29 May 2017. en.
  43. Web site: ESO Signs Largest Ever Ground-based Astronomy Contract for E-ELT Dome and Telescope Structure. www.eso.org. 24 January 2017.
  44. Web site: E-ELT Phase B Final Design Review. www.eso.org. 24 January 2017.
  45. Web site: ESO – E-ELT Enclosure. www.eso.org. 24 January 2017. de.
  46. Book: E-ELT The European Extremely Large Telescope – The World's Biggest Eye on the Sky (brochure). ESO.
  47. Web site: ESO – Are We Alone? . 15 June 2011 . https://web.archive.org/web/20130117081550/http://www.eso.org/public/teles-instr/e-elt/e-elt_exo.html . 17 January 2013 .
  48. Web site: Instruments ELT ESO . 2022-05-07 . elt.eso.org . en.
  49. Web site: ESO HARMONI Webpage . 16 April 2019.
  50. Web site: ESO METIS Webpage . 16 April 2019.
  51. Web site: ESO MICADO Webpage . 16 April 2019.
  52. Web site: ESO MORFEO Webpage . 23 April 2023.
  53. Web site: ESO MOSAIC Webpage . 16 April 2019.
  54. Web site: ESO HIRES Webpage . 16 April 2019.
  55. Web site: GMT Overview – Giant Magellan Telescope . 15 June 2011 . https://web.archive.org/web/20110609023406/http://www.gmto.org/overview.html . 9 June 2011 . dmy-all .
  56. Web site: About TMT – Thirty Meter Telescope . 15 June 2011 . https://web.archive.org/web/20110808172454/http://www.tmt.org/about-tmt . 8 August 2011 .
  57. Web site: Extremely Large Telescope – Timeline . 11 July 2023.
  58. Web site: 12 March 2021 . Giant Magellan Telescope – 6th mirror cast . 11 July 2023.
  59. https://www.eso.org/sci/libraries/SPIE2010/7735-84.pdf EPICS: direct imagine of exoplanets with the E-ELT