The Hooton–Helsby line is a railway line in the north-west of England that runs from Hooton on the Chester–Birkenhead line to the village and junction station at Helsby where it joins the Chester–Warrington line.

History

The line from to was opened in 1863. The line was built by the Birkenhead Railway which had been taken over by the LNWR and the Great Western Railway (GWR) jointly in 1860.

The section west of has been part of the Merseyrail network since 1994. This part of the line is electrified. There are no longer through train services to Liverpool's city centre via Birkenhead.

A branch at Helsby connected the line to the former West Cheshire Railway to Northwich via Mouldsworth Junction. The line closed in 1991 and tracks were lifted in 1995.

Passenger services

Former services

Services previously used to operate from Hooton to Helsby. This service was relatively frequent (every half-hour until 1993), operating via Ellesmere Port. It was withdrawn after the line was electrified west of Ellesmere Port. Station signs at Ince and Elton railway station still display signage relating to services to/from Hooton.

Hooton–Ellesmere Port

Services are operated by Merseyrail as part of the Wirral Line network with trains running every 30 minutes. From Hooton services continue to Liverpool via the Chester–Birkenhead line.[1]

Ellesmere Port–Helsby

Northern did, until May 2019, operate a Department for Transport-set minimum service[2] of three trains daily in each direction between Ellesmere Port and Helsby, Cheshire.

There were 6 passenger services each day (except Sunday):[3]

05:10 Liverpool Lime Street to Ellesmere Port
06:33 Helsby to Ellesmere Port
18:50 Helsby to Ellesmere Port

06:19 Ellesmere Port to Helsby
06:53 Ellesmere Port to Warrington Bank Quay
19:10 Ellesmere Port to Manchester Victoria

In previous years, services have operated towards Hooton via Ellesmere Port and Liverpool Lime Street via Warrington Bank Quay.

Since the May 2019 and the introduction of the "Northern Connect" Chester to Leeds services the Ellesmere Port line timetable was altered.

There still are 6 services per day excluding Sunday.

Services are:

05:10 Liverpool Lime Street to Ellesmere Port

06:17 Ellesmere Port to Helsby

06:34 Helsby to Ellesmere Port

07:15 Ellesmere Port to Leeds

All of the above are operated by the same unit.

Another unit operates the below services:

15:38 Leeds to Ellesmere Port

18:23 Ellesmere Port to Manchester Victoria - Unit then goes to Newton Heath Depot just north of Manchester Victoria.

Freight services

Ellesmere Port saw frequent freight traffic until 1996 with branches to several wharves as well as Eastham Oil Terminal.[4] In 2005 a single track line to Manisty Wharf in Ellesmere Port was reopened for a regular coal flow to Fiddlers Ferry power station.[5] [6] This freight route enters Ellesmere Port from Helsby.[7] Freightliner Heavy Haul currently operates the service, with two trains per day.[8]

In 2008 Quinn Glass was planning expansion and wanted to serve their 205acres site at Elton which outputs 1.2 billion glass containers per year for the food and beverage industry[9] near the Ince & Elton railway station by rail. Network Rail Route Strategy states that Quinn Glass is interested in additional passenger and freight services on this line. It is also thought that planning permission requires Quinn Glass to maximise upon existing public transport links.[10] A trial service ran on 7 April 2011 and a twice-weekly service every Wednesday and Friday commenced on 13 April 2011.[11] [12] Those services were operated by Freightliner Heavy Haul and transported sand from Sibelco's Middleton Towers Quarry in Middleton, Norfolk.[13] [14] [15] [16] [17] [18] At present the sand is transported by road the final five miles to the Quinn Glass plant from a former Cawoods siding in Ellesmere Port beside the Manchester Ship Canal, south of Manisty Wharf, but from November 2011 trains were due to begin using a dedicated terminal at the plant itself.[19] [20] It was announced during this month that construction work had been delayed due to the discovery of a badger sett on the proposed site. Completion of the new line was set back to the end of June 2012 with a reported total cost of more than £2 million.[21] In November 2012 it emerged that Quinn Glass had broken a planning condition requiring the rail terminal to be operational by November 2011.[22] The company cited additional demands by Network Rail and the Environment Agency's decision to switch off the Frodsham Marshes pumping stations as causes of delay. Quinn Glass have since been granted an extended period by Cheshire West and Chester council during which to complete the project.[23]

Stations

Three of the four stations between Helsby and Ellesmere Port are unstaffed. Two of them, Ellesmere Port and Ince and Elton, are accessible for those in wheelchairs. Stanlow and Thornton and Helsby both have footbridges as their only means of exit. Facilities at Ince and Elton and Stanlow and Thornton are basic, comprising little more than covered waiting areas and timetable information. Ellesmere Port has full ticket-selling capabilities, including a Ticket Vending Machine and a staffed ticket office, along with real-time information displays and help points. Helsby has real-time information displays and a Ticket Vending Machine.

Notes and References

  1. Web site: Train times. Wirral Line. Valid from 15 December 2019 to 16 May 2020. 2020-11-19.
  2. Web site: Northern TSR Table. December 2017 Monday to Friday. gov.uk. 5 September 2023.
  3. https://be803fe5c416e39d38ae-aa21086260d3bd4e072d597fe09c2e80.ssl.cf3.rackcdn.com/images/timetables/2018-05/summer-2018-timetables/Northern-15-1017-32pp-v2.pdf Timetables Summer 2018
  4. Web site: Manchester Ship Canal Railway at Ellesmere Port . John . Brightley . 29 July 2010 . . 6 August 2010.
  5. Web site: Route Plan O - Merseyside . 30 March 2010 . Route Plans 2010 . Network Rail . 30 May 2011 . 1 October 2012 . https://web.archive.org/web/20121001084558/http://www.networkrail.co.uk/browse%20documents/StrategicBusinessPlan/RoutePlans/2010/Route%20O%20-%20Merseyside.pdf . dead .
  6. Web site: Route Plan N West Coast . 1 April 2010 . Route Plans 2010 . Network Rail . 9 . 29 May 2011.
  7. Web site: Network Capability – Baseline Declaration : (1) Line-speeds : (2) London North Western Route (North) . 31 March 2009 . . 4 August 2010 . 18 January 2016 . https://web.archive.org/web/20160118053107/http://www.networkrail.co.uk/browse%20documents/baseline%20capability/track%20and%20route%20mileage,%20permissible%20line%20speeds/table%20a_track_and_route%20miles_linespeed_lnw_%20n%20route.pdf . dead .
  8. Web site: Manisty Wharf, Ellesmere Port - Film & TV Locations . 2010 . MediaCityUK . 20 May 2011.
  9. News: Quinn Glass Bottle Production Facility, Elton, Cheshire . Packaging Gateway . 20 May 2011.
  10. Web site: Quinn Glass Planning Application . May 4, 2008 . dead. https://web.archive.org/web/20071027044710/http://www.chester.gov.uk/PDF/Planning-quinn-glass.pdf . October 27, 2007 .
  11. Peel Ports and Quality Freight Re-open Ellesmere Port Rail Head . 20 April 2011 . The Peel Group . Manchester . 20 May 2011 . https://web.archive.org/web/20110720124523/http://www.peel.co.uk/news/peelportsandqualityfreightreopenellesmereportrailhead . 20 July 2011 . dead . dmy-all .
  12. Web site: Notice Board . Hulme, Charlie . 11 April 2011 . North Wales Coast Railway . 20 May 2011.
  13. News: Freightliner begin new contract with Quinn Glass . 15 April 2011 . The Aggregates & Recycling Information Network . 20 May 2011.
  14. News: Ellesmere Port rail head re-opens . 2 May 2011 . Rail Professional . 20 May 2011.
  15. News: Peel Ports Mersey joint venture re-opens Ellesmere Port rail facility . Hodgson, Neil . 27 April 2011 . Liverpool Daily Post . 20 May 2011.
  16. News: Peel Ports and Quality Freight Group reopens rail tracks in Ellesmere Port after 20 years . Stocks-Moore, Laurie . 27 April 2011 . Ellesmere Port Pioneer . 20 May 2011.
  17. News: Freightliner Heavy Haul wins transportation contract . Samuel, A. . 14 April 2011 . Rail.co . 20 May 2011.
  18. Web site: Freightliner Heavy Haul begins new contract with Quinn Glass . 15 April 2011 . Multimodal . 20 May 2011 . https://web.archive.org/web/20120324081807/http://www.multimodal.org.uk/htm/n20110415.442021.htm . 24 March 2012 . dead . dmy-all .
  19. Freightliner Heavy Haul new contract with Quinn glass . O'Boyle, Mary-Clare . 14 April 2011 . . 20 May 2011.
  20. Web site: New glass flow for Freightliner . Norfolk Railway Society . 20 May 2011.
  21. News: Flint. Rachel. Quinn Glass starts work on long-awaited railway line in Helsby. 23 June 2012. Ellesmere Port Pioneer. 23 November 2011.
  22. News: Boss at Elton-based Quinn Glass admits rail head 'not ready' . David . Holmes . Chester Chronicle . 22 November 2012 . 7 April 2013.
  23. News: Cheshire glass firm gets more time to open rail link . Ellesmere Port Pioneer . 19 December 2012 . 7 April 2013.