Eksar | |
Style: | Mumbai Metro |
Type: | Mumbai Metro station |
Address: | Eksar Village, Eksar, Borivali, Mumbai, Maharashtra 400091 |
Coordinates: | 19.2409°N 72.8434°W |
Owned: | Mumbai Metropolitan Region Development Authority (MMRDA) |
Operator: | Maha Mumbai Metro Operation Corporation Limited (MMMOCL) |
Platform: | 2 (2 side platform) |
Tracks: | 2 |
Structure: | Elevated, Double track |
Parking: | No |
Map State: | collapsed |
Mapframe: | yes |
Mapframe-Marker: | rail |
Mapframe-Zoom: | 14 |
Eksar is an elevated metro station on the North-South corridor of the Yellow Line 2A of Mumbai Metro in Mumbai, India. This station is located in Borivali, Mumbai. This station is owned by the Mumbai Metropolitan Region Development Authority (MMRDA), and was inaugurated on 2 April 2022.[1] [2]
J Kumar Infraprojects was awarded the contract to construct the station in June 2016.[3] The MMRDA announced that electrification of the line had been completed on 26 May 2020.[4]
Eksar was opened to the public on 2 April 2022, along with the first phase of Line 2A.[5] [6]
G | Street Level | Exit/Entrance |
L1 | Mezzanine | Fare control, station agent, Metro Card vending machines, crossover |
L2 | Side platform | Doors will open on the left |-| style="border-bottom:solid 1px gray;" width="100" |Platform 2 Southbound| style="border-bottom:solid 1px gray;" width="500" |Towards → Andheri West next station is Borivali West|-|Platform 1 Northbound|Towards ← Dahisar East next station is Mandapeshwar IC Colony|-| colspan="2" style="border-top:solid 2px black;border-right:solid 2px black;border-left:solid 2px black;border-bottom:solid 1px gray;" align="center" |Side platform | Doors will open on the left |
Like all other stations and railways of Mumbai metro, Eksar station also uses 25,000 volt AC power system by overhead catenary to operate the trains.