Eildon Dam
Location Map:Australia Victoria
Location Map Caption:Location of the Eildon Dam in Victoria
Coordinates:-37.1928°N 145.8969°W
Country:Australia
Location:Victorian Alps, Victoria
Status:O
Operator:GoulburnMurray Water
Dam Type:E
Dam Crosses:Goulburn River
Dam Height:84.5m (277.2feet)
Dam Length:1085m (3,560feet)
Dam Volume:10200e3m3
Spillway Type:Controlled
Spillway Capacity:3356m3/s
Res Name:Lake Eildon
Res Capacity Total:3390000ML
Res Catchment:3885km2
Res Surface:13832ha
Res Max Depth:79m (259feet)
Res Elevation:288.9m (947.8feet)
Plant Name:Eildon Hydroelectric Power Station
Plant Coordinates:-37.2219°N 145.9214°W
Plant Operator:AGL Energy
Plant Turbines:Four
Plant Capacity:135MW
Plant Annual Gen:226GWh
Website: at GoulburnMurray Water

The Eildon Dam is a rock and earth-fill embankment dam with a controlled spillway, located on the Goulburn River between the regional towns of and within Lake Eildon National Park, in the Alpine region of Victoria, Australia. The dam's purpose is for the supply of potable water, irrigation, and the generation of hydroelectricity. The impounded reservoir is called Lake Eildon.The first cut of ground was done by Mr Bain and Mr MacLean from Scotland.

Location and features

Designed by the State Rivers and Water Supply Commission of Victoria, construction of the original water storage, which was known as Sugarloaf Reservoir, took place between 1915 and 1929 to provide irrigation water for what was a vast uncultivated area on Victoria's northern plains. The original weir was modified in 1929, and again in 1935, to increase the storage capacity to 377000ML. However, this reservoir was still limited in its capacity to meet the growing demand for water in the Goulburn Valley and to protect farmers during drought years. Following a detailed feasibility study of all possible storage sites on the Goulburn River, it was decided that the existing dam site was the most suitable for construction of a larger dam. In 1951, work began to enlarge the storage to its present capacity. The enlargement was completed in 1955 and the storage was renamed Lake Eildon.[1]

The embankment dam wall is constructed with an earth core and rock fill, rising to a height of 83m (272feet).[2] The core component materials of the wall include of rock and earth. With a catchment area of that includes the Goulburn, Delatite, Howqua, Big, and Jamieson rivers and several minor tributaries,[3] the reservoir covers an area of 13832ha. The reservoir has a capacity of 3390000ML with an average depth of, and can release a maximum outflow of approximately via its controlled spillway. The crest of the uncontrolled spillway is 288.9m (947.8feet) and is approximately 1085m (3,560feet) long.[1] [2]

Lake Eildon is connected to the metropolitan water supply of Melbourne, the state capital, via a pipeline from the Goulburn River. On average, 91% of the water from Lake Eildon goes to the Goulburn Weir and the Waranga Basin before it flows to irrigators in the Goulburn Valley system.

Power generation

Operated by AGL Energy, Eildon Hydroelectric Power Station is a hydroelectric power station that operates during the irrigation season from August to May. Its operation is mainly governed by release of water to meet irrigation demands, but it may also be operated during winter and spring when flood releases can be used to generate electricity. The power station can also be used to meet short-term emergency power needs resulting from industrial disputes or plant breakdown elsewhere in the State's power grid. Initially completed as part of the Sugarloaf Reservoir with just of hydroelectric generating power, capacity was increased by 1957 to through the installation of two turbines. The first 67MW turbine was commissioned in 1956, and a second in 1957.[4] In addition, there are two turbines; these were decommissioned in 1971, but recommissioned in 2001. These smaller turbines were relocated from the former Sugarloaf Power Station on the Eildon Weir, completed in 1929 and in use until work on the larger dam started in 1951.[5] This renovation of the oldest turbines in 2001 led to a generation capacity of . A 5200ML pondage below the dam temporarily detains water discharged from the power station and regulates releases downstream to minimise variations in flow due to intermittent power generation. In 1995 the Eildon Pondage Power Station, a small hydro-electric station with output was installed on the pondage.[1] [2] In 2024, AGL studied the options of expanding the scheme with pumped-storage hydroelectricity.[6]

Eildon Power Station has four turbo generators, with a total generating capacity of of electricity. It produces an average of around of electricity per annum.[7]

Houseboats

As the only inland waterway where houseboats are permitted, Lake Eildon has a thriving houseboat culture with over 700 on the lake.[8] There is a Private Harbour and a Public Harbour. Rental of houseboats is possible in the latter. Some boats are restricted to daytime operation due to lack of lighting. The Private Harbour manages the owners' houseboats with staff and facilities that cater to over 18 marinas. Both harbours provide fueling facilities.[9]

Drought and recovery

During the drought years in Victoria in the 2000s, Lake Eildon rarely filled and the once-thriving holiday destinations around the lake were unable to attract visitors, leading to considerable economic hardship. Although water is in great demand for agriculture, careful regulation has kept outflows fairly static. During November 2006 the lake dropped to a low of only 15% from the previous year level of 48.3%.[10] The lake reached as low as 5.3% in 2007.[11]

After many years with below average rainfall, 2010 saw Lake Eildon receive above average rainfall and rose from 23% of capacity in May 2010 to be 82.5% as of March 2011.[1] On the night of the 13th October 2022, Lake Eildon inflows peaked at 145,000 megalitres per day, decreasing overnight to 100,000, far above the dam's maximum outflow of 38,000 megalitres per day with the spill gates open. On the 15th October 2022, due to an abnormal amount of rain in the region, the lake filled up to 100.3% of its capacity for the first time since 1994. Because the spillway gates were raised, this raised the height of the dam allowing more water into the reservoir than is normally able.[12]

In film

The nearby town of Bonnie Doon was the location for the holiday scenes in the movie, The Castle. Lake Eildon was also the main location used for the 1975 feature film version of The Box, as well as the 1989 direct-to-video Australian horror film Houseboat Horror.

See also

External links

Notes and References

  1. Web site: Lake Eildon. GoulburnMurray Water. 16 July 2014. dead. https://web.archive.org/web/20140925023826/http://www.g-mwater.com.au/water-resources/storages/goulburn/lakeeildon. 25 September 2014. dmy-all.
  2. Web site: Register of Large Dams in Australia. Excel (requires download). Australian National Committee on Large Dams. 2010. 16 July 2014. Dams information. 12 December 2013. https://web.archive.org/web/20131212120804/http://www.ancold.org.au/wp-content/uploads/2012/10/Dams-Australia-2010-v1-for-website.xls. dead.
  3. Web site: Map of Lake Eildon, VIC. Bonzle Digital Atlas of Australia. 16 July 2014.
  4. Book: Edwards, Cecil . Brown Power. A jubilee history of the SECV . State Electricity Commission of Victoria . 1969 .
  5. Web site: Goulburn-Murray Water: Lake Eildon . 4 August 2019 . https://web.archive.org/web/20070928170844/http://www.g-mwater.com.au/article.asp?ContentID=lake_eildon&ContainerID=goulburn_storages%2F . 28 September 2007 . dead .
  6. Web site: AGL eyes quicker and cheaper pumped hydro “conversions” to back up wind and solar . RenewEconomy . en-AU . 14 June 2024.
  7. Web site: Eildon Power Station . . 13 October 2006 . https://web.archive.org/web/20060918165540/http://www.agl.com.au/AGLNew/About+AGL/Generation+assets/Hydro+electric+power/Eildon.htm . 18 September 2006 . dead . dmy .
  8. Web site: Houseboating on Lake Eildon . . 2022-09-14 . Victoria Department of Land, Water and Planning (DELWP) . State Government of Victoria . 2022-12-02.
  9. Web site: Houseboats at Lake Eildon . . 2022-09-06 . G-MWater . Goulburn-Murray Water. ABN 46 761 336 846 . 2022-12-02.
  10. Web site: Storage Levels - November 2006 . 11 April 2012 . https://web.archive.org/web/20120325090233/http://www.water.vic.gov.au/monitoring/monthly/archive/monthly_water_report7/storage_levels . 25 March 2012 . dead .
  11. https://metro.co.uk/2022/10/18/australia-a-lake-has-filled-up-for-the-first-time-in-28-years-17584598/ Lake Eildon full for the first time in 28 years.
  12. Elvin, S. (2022, October 18). It's rained so much a lake has filled up for the first time in 28 years. Metro. Retrieved October 19, 2022, from https://metro.co.uk/2022/10/18/australia-a-lake-has-filled-up-for-the-first-time-in-28-years-17584598/