İZBAN explained

Railroad Name:İzmir Banliyö Sistemi
Logo Filename:İZBAN logo.svg
Map Size:250
Marks:İZBAN
Locale:İzmir
Start Year:2007
Predecessor Line:Çiğli suburban
Cumaovası suburban
Electrification:25 kV AC overhead
Length:136km (85miles)
Hq City:Ataşehir, Çiğli
Website:İZBAN Official Site
İzmir Banliyö Anonim Şirketi
Type:Government partnership organised as a joint-stock company
Location City:Alsancak, İzmir
Location Country:Turkey
Area Served:İzmir
Key People:Seçkin Mutlu (CEO)
Industry:Rail transport
Services:Commuter railway service in İzmir
Owner:TCDD (50%)
İzmir Municipality (50%)

İZBAN, previously known as Egeray, is a commuter rail system serving İzmir and its metropolitan area, mainly on a north–south axis, via two lines: The Northern Line and the Southern Line. Averaging a daily ridership of 185,000 passengers, it is the busiest commuter rail system in Turkey, slightly ahead of the Marmaray commuter line in Istanbul.[1] İZBAN is a portmanteau of the words "İzmir" and "Banliyö" (suburb in Turkish).

Established in 2007 and began operations in 2010, İZBAN was formed to revive old commuter rail in İzmir., İZBAN operates a 136km (85miles) long system, with 41 stations.

İZBAN A.Ş., founded in 2006, operates the railway and is owned 50% by the Turkish State Railways and 50% by the İzmir Metropolitan Municipality. İZBAN is a part of the municipality's transportation master plan.

Routes

İZBAN currently has four routes; The Aliağa-Cumaovası, serving the central districts of the city and into Aliağa, The Southern Line, serving the central districts, Adnan Menderes Airport, the southern town of Menderes and the southern town of Torbalı, The Tepeköy-Selçuk which connects the town of Torbalı with the town of Selçuk, The Çiğli-Halkapınar line only runs during rush hours on weekends in order to reduce pressure on The Aliağa-Cumaovası and The Menemen-Tepeköy lines. Apart from The Tepeköy-Selçuk line, all lines run through the central districts providing 8 trains per hour in the central district

width=200Route !width=100Distance !width=100Trains Per Hour !Districts served
Aliağa-Cumaovası78km (48miles)3Menemen, Konak, Bayraklı, Karşıyaka, Çiğli, Buca, Gaziemir, Menderes
Menemen-Tepeköy84 km(52 mi)3Konak, Bayraklı, Karşıyaka, Çiğli, Buca, Gaziemir, Menderes, Torbalı
Tepeköy-Selçuk26km (16miles)2
Çiğli-Halkapınar 26km (16miles)Weekday rush only.Bayraklı, Karşıyaka, Çiğli,

History

İZBAN A.Ş. was jointly created on 10 January 2007 by the İzmir Municipality and the Turkish State Railways to operate commuter service within the city. Previously commuter service was operated by the State Railways but service wasn't very frequent and trains weren't as efficient. By 2006 commuter ridership within İzmir was at its all time lowest with only 98,000 boardings that year. This followed a steady decrease in ridership since the 1990s.[2] In order to revive commuter service in the city, the State Railways executed a complete overhaul of their two lines within the city. On 23 July 2006 the State Railways temporarily suspended all rail service into İzmir. Regional and intercity trains would terminate at Çiğli in the north and Gaziemir in the south.

During this time, the 24 existing commuter stations were rebuilt and 5 new stations were added. 15 new bus transfer terminals were added to integrate commuter service with the citywide bus service ESHOT. All grade crossings were converted to overpasses or underpasses with the exception of 7 crossings that were operational when service began. Today, only 3 remain and will be removed in the near future. Two railway tunnels were built in Karşıyaka and Şirinyer with a total of 4 underground stations and the railway's former right of way were converted into parks. Tracks were relaid with cement ties and signalization was upgraded to a central control station at Alsancak. Turnstiles were added at stations to integrate them with the citywide smartcard, Kentkart. A new maintenance facility was opened in Çiğli as well as a small yard was opened in Cumaovası for the trains. Works on the southern line finished in mid-2009 and regional service was restored to Basmane station. Works on the Northern Line finished in Spring 2010 and service was restored on 1 May 2010.

Service

Currently, İZBAN operates 164 daily trains in both directions between Cumaovası and Aliağa.[3] All of the tracks are owned by the Turkish State Railways. There are also bus terminals integrated with several new stations. These stations are: Halkapınar, Şirinyer, Semt Garajı, Esbaş, Sarnıç and Cumaovası on the Southern Line, Mavişehir, Çiğli, Egekent 2, Hatundere, Biçerova, Menemen and Ulukent on the Northern Line.

Ridership

İZBAN is by far the busiest commuter railroad in Turkey, carrying more passengers than the rest of Turkey's other commuter railroads combined.[4] The average daily ridership is about 100,000. In its first month, İZBAN carried about 2,000 passengers daily, this grew to 40,000 by the end of December and doubled to 80,000 by February. With the opening of the rail-bus transfers on the Northern Line, daily ridership has increased to 100,000. This is expected to rise to 140,000 by April. İZBAN, at 6 months old had carried more than 1.6 million passengers from its opening on August 30, 2010, making it one of the world's fastest growing commuter railroads.[5] Below is a list of the top 10 busiest stations on the system .

Rank Station Passengers (2011) Daily Passengers Lines
1 2,061,535 8,380 -
-
-Halkapınar
2 1,943,187 7,899 -
-
3 1,793,536 7,290 -
-
-Halkapınar
4 1,483,999 6,032 -
-
5 1,396,351 5,676 -
-
-Halkapınar
6 1,044,191 4,244 -
-
-Halkapınar
7 948,731 3,856 -
-
8 879,333 3,574 -
-
-Halkapınar
9 872,063 3,544 -
-
-Halkapınar
10 819,504 3,331 -
-
-Halkapınar

Rolling stock

width=100Model !width=100Picture !width=100Numbers !width=100Built !width=100Type !width=150Power !width=150Builder (Designer)
22001–22033 2010–2011 EMU CAF
22101–22140 2012–2015 EMU Hyundai Rotem

Future Developments

In 2022, the Izmir Metropolitan Municipality announced that work on two inflill stations would begin in 2023. The stations will be called Lale, located between Şirinyer and Kemer, and Katip Çelebi University, located between Egekent and Ulukent.

In 2023 the mayor of Izmir announced plans for two new stops in Menemen. The stops will be called Koyundere and Asarlık. Both will be located between Egekent 2 and Menemen stations.[6]

Aliağa-Bergama

İZBAN plans to extend the line 55 km north of Aliağa to Bergama. The goal of this project is to link the ancient cities of Pergamon and Ephesus with İzmir by rail.[7]

Suspended

Menemen-Manisa

An extension to Manisa was planned and construction was expected to begin towards the end of 2011. This would mean the upgrading of several stations (Emiralem, Ayvacık, Muradiye, Horozköy) and a major upgrade of the Manisa Railway Station, as well as adding a few new stations to serve all villages near the line(Yahşelli, Göktepe). Together with this, the existing single track line, would be made double track and electrified with 25 kV AC overhead wire.

See also

External links

Notes and References

  1. http://www.izban.com.tr/ İZBAN
  2. http://www.tcdd.gov.tr/Upload/Files/ContentFiles/2010/istatistik/2006yillik.pdf TCDD Annual Report
  3. http://www.izban.com.tr/Sayfalar/Single.aspx?Page=33 İZBAN Sefer Saatleri
  4. http://egedesonsoz.com/default.asp?sayfa=haberdetay&part=yerel-yonetimler&hID=787711&haber=aktarma-geldi-boyle-oldu%3A-gunde-100-bin-yolcu- Ege den son söz
  5. https://izbansaatleri.com İzban saatleri
  6. Web site: Başkan Soyer: Menemen'e Iki IZBAN Durağı Kazandiracağız.
  7. [:tr:İZBAN|İZBAN]