Edmonton Transit Service (ETS) | |
Parent: | City of Edmonton |
Founded: | 1908 |
Service Area: | Edmonton, Alberta |
Service Type: | Public Transit |
Routes: | 207 bus 3 LRT |
Stops: | 5,267[1] |
Hubs: | 25 |
Stations: | 29 (LRT)[2] |
Fleet: | 952 buses (as of 2022) 120 light rail vehicles (as of 2023) 130 DATS vehicles[3] |
Ridership: | |
Annual Ridership: | |
Fuel Type: | Bus: diesel, electric LRT: electric |
Operator: | City of Edmonton |
Ceo: | Carrie Hotton-MacDonald (Manager) |
The Edmonton Transit Service (ETS) (previously known as Edmonton Transit System) is the public transit service owned and operated by the City of Edmonton in Alberta, Canada. It operates Edmonton's bus and light rail systems. In, the system had a ridership of, or about per weekday as of .
Edmonton Transit Service began operations on 30 October 1908, under the name Edmonton Radial Railway (ERR), and alternatively as the Edmonton Radial Tramway.[4] Also in 1908, ERR acquired the Strathcona Radial Tramway Company Limited, and also began servicing the villages of North Edmonton and Calder. The transit service's name was changed to Edmonton Transportation Service in July 1946, but just a year later it was re-named to Edmonton Transit System. The service was re-named to Edmonton Transit Service in 2016.
See main article: Edmonton Radial Railway. The Edmonton Radial Railway (ERR) began operations in 1908, both in the City of Edmonton and the neighbouring City of Strathcona, with four streetcars serving 21km (13miles) of track.[5] Over ten million riders used the system annually by 1912, and the city purchased 47 additional streetcars. The radial railway reached its peak in 1930, with six lines serving almost all parts of the city, and totaling 77km (48miles) of track.[6] The city purchased five modern streetcars in 1930, which featured innovations such as steel bodies and leather seats; these were the last streetcars that Edmonton purchased.[7] The city significantly neglected its streetcar system during the Great Depression, and it suffered from poor maintenance and outdated streetcars. In the late 1930s, Edmonton began to replace streetcar lines with electric trolleybus routes, supplemented by gas and diesel buses, instead of buying new streetcars and repairing or replacing the tracks and overhead lines that had deteriorated during the Depression.
The transition to buses was slowed significantly during the Second World War, and Edmonton had to build additional trackage for its streetcars to meet the spike in transit usage during the war. It was also forced to reintroduce conductors on busy routes, to help operators with selling tickets and issuing transfers; conductors were originally phased out in the 1930s, when streetcars were converted from double-ended to single-ended operations. The Edmonton Radial Railway was renamed to Edmonton Transportation Service in 1946, to signify the decline of Edmonton's streetcar network; it was renamed again just one year later, to Edmonton Transit System.
After some initial postwar hiccups, which necessitated even more streetcar tracks being built as late as in 1946 in order to avoid service gaps, the transition to trolleybuses picked up steam. By 1949, only two streetcar routes remained in service: The Blue Route, and the Blue & White Route, which totaled 27km (17miles) in length. In its final configuration, the service went between a turning loop at 109 Street and 84 Avenue, and another loop at 66 Street and 124 Avenue, via the High Level Bridge.[8]
On September 1, 1951, Edmonton streetcar No.1 – the first streetcar ordered by Edmonton – performed a ceremonial 'last run' across the High Level Bridge while carrying special dignitaries; over 1000 spectators lined its route.[9] Early the next morning, the dignitaries rode streetcar #52 back to the ETS Cromdale shop, which marked the final time that a streetcar was operated by ETS.
All of Edmonton's streetcars, except for #1, were stripped of their valuable materials like steel and electric wiring, and the bodies were sold for scrap. The Edmonton Radial Railway Society (ERRS) has recovered and restored three former Edmonton streetcars, and has another six awaiting restoration.[10] Aside from the three which it recovered and restored, it also operates Edmonton #1, which sat outside in a city yard for over ten years before being restored by volunteers – many of whom who later founded the ERRS.
See main article: Trolley buses in Edmonton.
Trolley bus service in Edmonton started on 24 September 1939, operating on route 5 from 101 Street/Jasper Avenue to 95 Street/111 Avenue. By the end of October of that year, service had started on another route running to 99 Street/Whyte Avenue via the Low Level Bridge. In Edmonton, trolley buses were often referred to simply as "trolleys".
The trolley bus system used a mixture of Ohio Brass and K&M Elastic (Swiss) suspension for holding up the overhead wires.
The 47 vehicles remaining in use in 2008 were from an order of 100 manufactured in 1981–82 by Brown Boveri & Company (BBC), using bodies and chassis supplied to BBC by GM.
On 18 June 2008, city council voted 7 to 6 in favour of phasing out the trolley system between 2009 and 2010.[11] However, city council decided in April 2009 that trolley bus service would be discontinued earlier than had been planned, in order to reduce the city's expected $35 million deficit that year.[12] The last day of regular service was 2 May 2009.[13]
In 2007, the city leased a low-floor model of trolley, for 11 months, from Coast Mountain Bus Company, Vancouver's bus operating company, for testing of possible benefits of low-floor trolleys over hybrid diesel buses. During its time in Edmonton the bus was numbered 6000, but was returned to its original #2242 when returned to Vancouver.[14]
ETS provides bus and light-rail transit services within the City of Edmonton limits, in addition to Spruce Grove and Beaumont. It also provides connections to Leduc Transit, St. Albert Transit (StAT), and Strathcona County Transit. ETS provides service to the Edmonton International Airport.
ETS uses the timed-transfer system, where suburban feeder routes run to a transit centre, and passengers can then transfer to a base route/LRT to the city centre or the university. Some feeder routes provide direct express service to and from the city centre.
See main article: Edmonton LRT.
ETS operates a 37.4 km light rail system composed of 29 stations in three lines.[15] The Capital Line runs roughly north–south, between Clareview station in northeast Edmonton and the Century Park station on the south side, with a mix of tunnels and at-grade track. Six stations are underground, while the remaining nine are at-grade with surface road crossings. The Metro Line shares track with the Capital Line in some sections, and services the central and north-central area of the city.[16] The Valley Line, which opened on November 4, 2023, runs from Mill Woods in the southeast to 102 Street and 102 Avenue in the downtown core.[17] the Metro Line is being extended to the community of Blatchford, while the Valley Line is being extended west to the community of Lewis Farms.
ETS operates three different models of light rail vehicles (LRV): The Siemens–Duewag U-2, which started service when the original line opened in 1978; the Siemens SD-160, which began operation in 2008;[18] [19] and the Bombardier/Alstom Flexity Freedom, which is exclusively used on the Valley Line.[20]
See main article: List of Edmonton Transit Service bus routes. A redesigned bus network that affected almost every Edmonton Transit bus route began on April 25, 2021. This redesigned bus network was originally scheduled to be implemented on August 30, 2020, but was postponed until April 25, 2021, as a result of the COVID-19 pandemic, to save approximately $3.7 million and defer tax increases for residents.[21] [22]
The City of Edmonton began completely redesigning its bus route network in 2017, with the aim of making it run more efficiently. Two rounds of public consultations were held at various locations around the city, and online surveys collected feedback from riders. The public engagements identified that transit riders would rather have to walk further to get to higher frequency routes, opposed to more routes operating less frequently. The city released a final draft of the new bus system in 2018, which cut back on routes with low ridership, and increased frequency in high traffic areas. After the redesign, all routes were renumbered to make the system easier to navigate. New signage and materials was created to assist in wayfinding. No change to fares has been announced, but the Manager of ETS has stated that ETS could switch to a distance-based system, where fees are based on how far a rider travels.[23]
A digital pdf of the day service route map is available on the City of Edmonton's website (Jan 2024), while a Google My Maps is available here (Apr 28, 2024).
Night service began on 6 September 2015, on routes 1, 4, 8, 9, and 512.[24] Upon launch of the 2021 Bus network redesign, Owl routes are as follows: 2, 4, 8, 9, and 511. These buses operate on 30-minute headways until approximately 3:30 or 4am. Morning service then resumes around 5am. 2-OWL acts as a late night replacement for northern sections of the Capital Line (operating after the LRT shuts down for the night) from Clareview to Downtown. 9-OWL acts as a late night replacement for southern sections of the Capital Line. Route 511 replaced 510X in September 2022, and acts as a late night replacement of the Valley Line.
A digital pdf of the late night owl service's route map is available on the City of Edmonton's website (Jan 2024).
Transit centres in Edmonton serve as hubs which allow people to transfer bus routes or onto the LRT system. These hubs typically have a heated shelter, and have multiple bus bays to accommodate many buses at a time.
(* Transit centre at LRT station)
(† As of April 25, 2021, does not have Transit Centre status)
ETS operates an entire fleet of accessible low floor buses,[25] which have been progressively introduced into the system since 1993. These include the 859 40feet New Flyer D40LF/D40LFR/XD40/XHE40, 33 60feet New Flyer D60LFR/XD60 articulated models, 60 40-foot Proterra ZX5 models, and 49 Grande West Vicinity B30A models.
The City of Edmonton embarked on an eight-month evaluation of 13 clean-diesel and hybrid buses (and a new trolley bus) in 2008. Edmonton Transit's first two diesel electric hybrid buses went into service in December 2006.[26] The unique design and colour scheme of the two Orion low floor buses have been chosen to enable them to 'stand out' from the rest of the ETS fleet. The buses were part of an extensive test of hybrid technology that Edmonton Transit and the University of Alberta conducted over a year. Bus reliability, performance, maintenance costs, fuel efficiency, noise generation and environmental impact were monitored and evaluated in all weather and road conditions. As well, customers were surveyed about their travel experience. Ultimately, the Hybrid buses only recorded fuel savings of 10-20% (in contrast to the 35% touted in the internal ads). In addition, the ISE-New Flyer hybrids (6003 and 6004) were out of service so much that they could not be included in the evaluation.
As of fall 2009, only the two Orion hybrids were in service. New Flyer/ISE hybrids 6003 and 6004 have since been converted to diesel buses as of 2011. New Flyer/Allison 6002 was revamped with new features and technology to become the ETS Platinum Bus, also referred to as the "Painted Lady".[27]
In spring 2014, ETS unveiled a full electric bus for a four-month pilot program through October 2014. The buses were referred to as "ETS Stealth Buses" and were on lease from Build Your Dreams (BYD) Co. Ltd. The buses did not have a fare box, but instead were accepting customer surveys about electric buses as fare.[28] Even without fare capacity the buses were placed on several different routes around the city to give Edmontonians the ability to experience the new exhaust-less bus. These test buses were not winterized.
In 2019, Edmonton received funding to purchase 50 Proterra ZX5 40' E2 MAX electric buses, but this has since been reduced to 40 electric buses – one of the largest purchases of electric buses in Canadian history.[29] [30] The first 21 buses started service in August 2020, with the second batch of 19 buses being scheduled to arrive in the fall of 2020. The buses are charged from overhead charging units to save floor space in the bus garages, and it is the first transit service in North America to use such infrastructure for its buses.[31] [32] ETS conducted winter-testing of this bus model in 2015, and found that these buses could handle most of their routes. The buses are housed at the Centennial Garage and the Kathleen Andrews transit garage; the latter being the main hub for Edmonton's electric buses.[33]
In 2021, Edmonton reached an agreement with the Canada Infrastructure Bank (CIB) which called for CIB to invest C$14.4 million (US$11.89 million) to purchase 20 additional electric buses under the ZEB (Zero Emission Bus) Federal Program.[34]
In 2022, Edmonton Transit and Strathcona Transit obtained one hydrogen-electric hybrid bus for each of the two transit systems as part of a pilot project, unveiling the new buses during the Electric and Hydrogen Vehicle Expo in Edmonton, Saturday, Sept. 24, 2022.[35] [36] The pilot project is part of the Alberta Zero Emission Hydrogen Transit (AZEHT) project of Emissions Reduction Alberta.[37]
A new feature on ETS, Smart buses have since July 2013, seen operating on several routes, the trial routes were 111 which went from West Edmonton Mall to Downtown and 128 which went from Castle Downs to University, This system respectively used 45 buses. As of November 2014, there were 22 routes equipped.[38] [39] [40] [41] [42] Real time bus arrival information on personal computers and mobile data is branded together as ETS LIVE and a mobile app, ETS Live to Go, has been released. The buses equipped possess automatic audio visual stop announcers of the next bus stop described by its nearest intersection, a computer aided dispatch which informs the control centre where a bus is, as well as monitor incidents. Mobile data terminals inform the drivers as to if they are late or not. The buses equipped have internal covert cameras to monitor safety.[43] [44] City council has approved funding for Smartbus deployment on all bus routes as of 2019 and 2020.[45] All buses in the ETS fleet were fully equipped with Smart bus technology by September 4, 2016; earlier than initially planned.[46]
The table below lists fares as of 1 February 2020.[47] [48], ETS accepts only cash for fare payments made on buses and at LRT stations. Edmonton has recently adopted a NFC enabled card for payment on ETS Busses and LRT Stations, similar to the Compass card used on the Vancouver SkyTrain operated by TransLink.
Youth (24 and Under) | Adult (25-64) | Senior (65+) | ||
---|---|---|---|---|
Cash | $3.50 (Exact Change Required on ETS Buses) | |||
10 Ticket Pack | $19.75 | $27.75 | $19.75 | |
Monthly Pass | $73 | $100 | $35 | |
FAMILY Day Pass | $10.25 | |||
Annual Pass | N/A | N/A | Regular: $374 |
ETS provides several discounts for students and the disadvantaged:
Edmonton first approved funding for a SmartFare program in 2015.[58] Fort Saskatchewan, St. Albert, and Strathcona County are among the other communities which are also participating in this system.[59] Smart fare was set to launch in early 2021, but its rollout was delayed by the closure of the Canada–United States border during the COVID-19 pandemic.[60]
On 8 June 2021, it was announced that the SmartFare payment system would be branded as Arc.[61] Post secondary students became the first riders to use Arc when their institutions began issuing cards in fall 2021.[62] A pilot test including 500 adult fare-paying users began on 1 January 2022, and the results were reviewed in March 2022, but access to Arc was not expanded at that time. Arc was rolled out to adult fare-paying riders on November 21, 2022.[63] Subsidized fare groups, including seniors, youth, junior high and senior high students, customers who purchase low-income passes, DATS riders, and users of regional paratransit services, will receive access to Arc in 2023.
Fare vending machines which sell Arc cards and Arc tickets, and allow users to load money to their accounts, are at various major locations in the region, including all Edmonton LRT stations, some transit centres, and the Edmonton International Airport. The machines accept cash, debit, and credit cards. Riders can also purchase Arc cards and add money to their account balances online. Each rider's balance is stored on their account, rather than on the Arc cards or Arc tickets themselves, meaning that if an Arc card is lost or stolen, its balance can be transferred to a new card if the owner had registered their account.[64] Arc cards include daily and monthly fare-capping; frequent riders who reach a fare threshold will ride for the remainder of that period for free of charge. Arc tickets work similarly to Arc cards, but are one-time use only, and are sold in 90-minute and 24-hour increments. Riders can still pay their fare with cash, paper passes and tickets, but paper tickets and passes will eventually be phased out; cash will always be a payment option.
Some routes have different fare structures due to the distance they cover or because they enter different municipalities outside of Edmonton.
Fares effective 1 January 2022 for commuter routes 560 and 565 to Spruce Grove, Acheson, and:[65]
Routes 560, 561, and 565 Local within Spruce Grove | Routes 560 and 561 To/From Edmonton | Routes 560 and 561 + ETS Transferability | |
---|---|---|---|
Ages 5 and Under (with a paid passenger) | Free | ||
Cash Fare (Ages 6+) | $3 | $6.25 | N/A |
10 Ticket Pack | N/A | $56 | N/A |
Monthly Pass (Ages 18+) | N/A | $135 | $197 |
Monthly Pass (Ages 6–17 or Student) | N/A | $100 | N/A |
No additional fare for U-Pass holders.
Fares effective 1 October 2017 for route 540 to Beaumont:[66]
Student | Adult (13-64) | Senior (65+) | |
---|---|---|---|
Cash | $5 | ||
10 Ticket Pack | $45 | ||
Monthly Pass | $78 | $85 | $78 |
Children under 12 ride free (with an accompanying fare-paying passenger). Beaumont tickets, passes and transfers cannot be used on regular ETS services. The U-Pass is not accepted on route 540, however the option is being considered for the future.
Fares for route 747 to the Edmonton International Airport, effective 14 May 2018:[67]
No additional fare for holders of a UPass, Leduc Commuter-Plus pass, or Leduc route 10 to route 747 transfer
One way fare reduced back to $5 on 1 May 2018 (after it rose to $10 on 1 February 2018), when an increase in joint funding from the City of Leduc, Leduc County, and the Edmonton International Airport was agreed upon.[68]
Some Strathcona County Transit tickets/passes/transfers are valid on ETS and vice versa. These are the details effective 1 February 2018:[69]
Some ETS tickets/passes/transfers are valid on StAT and vice versa:[70]
In May 2007, Edmonton Transit Security were appointed peace officers under the Alberta Peace Officer Act. Transit peace officers can issue tickets for provincial statutes and Edmonton bylaws on ETS property. Transit peace officers actively promote order maintenance, disorder prevention and voluntary compliance with social norms surrounding acceptable transit use.[72] Transit peace officers use Ford Taurus police interceptors and Dodge Charger interceptors as their primary transportation, but are also seen riding the LRT enforcing bylaws. They patrol in uniform on ETS vehicles and property, which include buses, LRT and transit stations, 24 hours/day, 7 days/week.[73] The Transit Peace Officer Bike Patrol is also active during suitable weather conditions from spring until fall. The Bike Patrol can access certain areas better than a vehicle, such as bike paths along LRT tracks or areas congested by traffic or special events. Transit peace officers are authorized to enforce municipal bylaws and have powers and authority under several provincial acts.
In November 2018 Edmonton Transit added 24/7, onsite contract security guards to augment and assist the peace officers and Edmonton police. The main focus of the contract security guards are to focus on high-visibility patrols and observing and reporting security issues for the transit peace officers or Edmonton police to attend. The contract security guards interact with the public and work closely with transit peace officers and Edmonton police.[74]
In September 2021 the transit peace officer group initiated a two-year pilot program called the Community Outreach Transit Team (COTT). It is a partnership between the City of Edmonton and the Bent Arrow Traditional Healing Society with the intention to aid those in need of social, medical, or financial assistance.[75]
The city of Edmonton began exploring the development of a regional transit services commission in 2017.[79] In February 2020, Edmonton city council voted to join twelve other municipalities to investigate the potential for a regional transit services commission (RTSC). Edmonton and eight other regional municipalities, including Fort Saskatchewan, Leduc, Spruce Grove, and St. Albert, formally submitted an application to the provincial government to establish the Edmonton Metropolitan Transit Services Commission in June 2020.[80] Their proposal had to be altered after four municipalities, including Leduc County and Strathcona County, withdrew from the project.
The formation of the EMTSC was approved by the Alberta government on 28 January 2021.[81] A board of elected representatives from each member community is conducting the initial setup of the commission, and working with the commission's inaugural CEO to develop its operational and planning capabilities. The EMTSC will begin service in early 2023.[82] Edmonton's local transit services and LRT network will not be transferred to the commission at first, due to their size and operational costs.[83] The commission's board will re-consider the inclusion of Edmonton's LRT network five years after the commission is formally stood up.
Construction on phase one of the Metro Line extension, which includes a permanent NAIT station and station for the Blatchford community on the old City Centre Airport property, started in mid-2020.[84] The temporary NAIT station is north of Princess Elizabeth Avenue, on the south side of the institute's swimming pool and hockey arena (S) wing.
See main article: Valley Line (Edmonton). The Valley Line will run for 27km (17miles) from Mill Woods through downtown Edmonton to Lewis Farms, with 25 stops. Unlike the existing LRT, the Valley Line will run primarily at grade in the centre median of city streets, connecting to the Capital and Metro lines at Churchill station.[85] The 11-station segment from Mill Woods to 102 Street in downtown, known as "Valley Line Southeast", was constructed first, beginning in 2016 and finishing in 2023. The southeast section cost $1.8 billion, with $800 million coming from the City of Edmonton, $600 million from Alberta, and $400 million from the federal government. A public–private partnership was established between the City of Edmonton and a private contracted group named "TransEd Partners" to build and operate the southeast portion of the line.[86]
Construction for phase two of the project, dubbed "Valley Line West", was started in 2022.[87] In 2020, the City of Edmonton selected a P3 named "Marigold Infrastructure Partners" to build the western section of the Valley Line,[88] and preparation work, such as the relocation of underground utilities and clearing of land along the route, began. Construction of the line formally commenced on May 27, 2022, and it is expected to be completed in 2028.[89]