Echizen Railway Explained

Echizen Railway Co., Ltd.
Type:Public-private KK
Predecessor:Keifuku Electric Railroad
Location City:Fukui, Fukui Prefecture
Location Country:Japan
Area Served:Northern Fukui Prefecture
Key People:Tōru Minami, President
Industry:Rail transport
Owner:Sakai City (17.4%)
Katsuyama City (16.7%)
Fukui City (16.1%)
Eiheiji Town (12.6%)
Awara City (7.0%)
42 others (30.2%)
Num Employees:93

is a third-sector railway operating company located in Fukui, Fukui Prefecture, Japan. It owns and operates the Katsuyama Eiheiji Line between Fukui and Katsuyama and the Mikuni Awara Line between Fukui and Sakai.

History

In 1992, Keifuku Electric Railway, the predecessor of Echizen Railway, announced that it would end services between Higashi-Furuichi (now Eiheijiguchi) and Katsuyama stations on the Eiheiji Main Line (now the Katsuyama Eiheiji Line) as well as all service on the Eiheiji Line and replace them with buses. However, for several years this was fought by local municipalities; in 1997, the city of Fukui and other municipalities along the railway lines announced they would establish a committee to provide support to the company to continue operating the lines.

However, two accidents in a six-month span on the Eiheiji Main Line (one on December 17, 2000, between and Higashi-Furuichi stations and another on June 24, 2001, between and stations) forced the company to halt all services. The resulting effect on revenue led to the company's decision to withdraw from the railway business, and in October 2001 it officially notified the Ministry of Land, Infrastructure and Transport.

As the Eiheiji Main Line and Mikuni Awara Line were considered to be a crucial means of transport, Fukui Prefecture decided to set up a third-sector company to continue operating railway services and established Echizen Railway in 2002. On February 1, 2003, Keifuku formally transferred all tracks and equipment to Echizen Railway, and the Echizen Main Line was renamed the Katsuyama Eiheiji Line. However, the Eiheiji Line was permanently abolished (as revenue was forecast to fall below the amount needed to break even) and bus service was run in its place.

Partial service on both lines resumed on July 19, 2003, with full service resuming on the Katsuyama Eiheiji Line on August 10 and on the Mikuni Awara Line on October 19. Official service In order to gather information on passenger demographics, all ticket machines were abolished and ticket sales were handled by station employees.[1]

Through service with Fukui Railway

On May 27, 2010, Fukui Prefecture announced plans for through services between Fukui Railway and Echizen Railway.[2] Under the plan, beginning in 2013 the Fukui Railway's Fukubu Line would connect to the Echizen Railway at Tawaramachi Station, and as many as two trains per hour in each direction would run through to Nittazuka Station. The next stage would involve extending Fukui Railway service to Nishi-Nagata Station and running Echizen Railway trains onto the Fukubu Line. As a part of this plan, five stations would be renovated.

Rolling stock

, the railway operates the following fleet of rolling stock.[3]

EMUs

Electric locomotives

Former rolling stock

Notes and References

  1. Shimada, Ikumi. 『ローカル線ガールズ』 ("Local Line Girls"), Media Factory: 2008.
  2. http://www.yomiuri.co.jp/national/news/20100529-OYT1T00579.htm 福井鉄道・えちぜん鉄道、相互乗り入れへ
  3. Book: ja: 私鉄車両編成表 2014 . Private Railway Rolling Stock Formations - 2014 . Kotsu Shimbunsha . 24 July 2014 . Japan . Japanese . 112. 978-4-330-48414-3.
  4. ja:えちぜん鉄道7000形. Echizen Railway 7000 series. . 53. 625. 58–59. Koyusha Co., Ltd.. Japan . Japanese. May 2013.