East 149th Street station explained

East 149 Street
Address:East 149th Street & Southern Boulevard
Bronx, NY
Borough:The Bronx
Locale:Woodstock
Coordinates:40.8121°N -73.9042°W
Division:IRT
Line:IRT Pelham Line
Service:Pelham local
Connection: NYCT Bus:
Platforms:2 side platforms
Tracks:3
Structure:Underground
Accessible:yes

The East 149th Street station is a local station on the IRT Pelham Line of the New York City Subway. It is served by the 6 train at all times and is located at the intersection of East 149th Street, Prospect Avenue, and Southern Boulevard in the Woodstock neighborhood of the Bronx. The station opened in 1919 as part of an extension of the Pelham Line of the Interborough Rapid Transit Company and had its platforms extended in the 1960s. The station became fully compliant with the Americans with Disabilities Act of 1990 in 2023.

History

This station opened on January 7, 1919, as part of an extension of the Pelham Line from Third Avenue–138th Street to Hunts Point Avenue by the Interborough Rapid Transit Company. The station was built as part of the Dual Contracts.[1]

Both platforms were extended at the west (railroad south) end in the 1960s to accommodate the current standard length of an IRT train (514feet). The extensions are noticeable as they are narrower than the rest of the platforms and the trim line is maroon with "E 149TH ST" in white sans serif font. The extensions result in the platforms being slightly offset.

In 2019, the Metropolitan Transportation Authority announced that this station would become ADA-accessible as part of the agency's 2020–2024 Capital Program.[2] A contract for two elevators at the station was awarded in December 2020.[3] The elevators opened for use on September 15, 2023.[4] [5]

Station layout

GroundStreet levelEntrances/exits
Elevators at:
  • Northwest corner of East 149th Street and Southern Boulevard for southbound trains.
  • Southeast corner of East 149th Street and Southern Boulevard for northbound trains.
Platform levelSide platform
Southbound local← toward
Peak-direction express← does not stop here →
Northbound local toward Pelham Bay Park (Parkchester weekdays)
Side platform

This underground station has three tracks and two side platforms. The center express track is used by the weekday peak direction <6> service. The 6 local train serves the station at all times. The next stop to the south is East 143rd Street–St. Mary's Street, while the next stop to the north is Longwood Avenue.

Both platforms have their original Dual Contracts mosaic trim line and name tablets. "149" tablets for "East 149th Street" run along the trim line at regular intervals and the name tablets have "E. 149TH STREET" in all-caps, serif lettering. Yellow i-beam columns run along the platforms at either ends at regular intervals with every other one having the standard black name plate with white lettering.

There are no crossovers or crossunders to allow free transfers between directions. Closed newsstands on the platforms have been tiled over.

Exits

Both platforms have one same-level fare control area at the center. Each one has a turnstile bank, token booth, and two street stairs. The ones on the Pelham Bay Park-bound platform go up to either eastern corner of Southern Boulevard and East 149th Street while the ones on the Manhattan-bound platform go up to the northwest corner.[6]

Elevators lead up from the southbound and northbound platforms to the northwestern and southeastern corners of Southern Boulevard and East 149th Street, respectively.

External links

Notes and References

  1. Web site: New Lines In Bronx Coming This Year: Rays of Rapid Transit to be Let Into Dark Sections in the West and North. The New York Times. 25 January 2016. January 7, 1919.
  2. Web site: Press Release - MTA Headquarters - MTA Announces 20 Additional Subway Stations to Receive Accessibility Improvements Under Proposed 2020-2024 Capital Plan . MTA . December 19, 2019 . December 25, 2019 . April 21, 2020 . https://web.archive.org/web/20200421204344/http://www.mta.info/press-release/mta-headquarters/mta-announces-20-additional-subway-stations-receive-accessibility . dead .
  3. MTA Announces Accessibility Projects at Eight Stations Throughout the Five Boroughs . Metropolitan Transportation Authority . 2020-12-16 . 2021-05-26 . 2021-05-26 . https://web.archive.org/web/20210526185744/https://www.mta.info/press-release/nyc-transit/mta-announces-accessibility-projects-eight-stations-throughout-five . dead .
  4. Web site: Going up! Today, we unveiled two brand new elevators at E 149 St on the 6 line, making the station fully accessible. This marks the completion of our 5th accessible station project in 2023 so far, with 7 more stations expected to be finished by the end of the year.. twitter.com. September 15, 2023. September 15, 2023.
  5. Web site: September 15, 2023 . MTA Opens New Elevators Making Another Bronx Subway Station Fully Accessible . September 15, 2023 . mta.info . Metropolitan Transportation Authority.
  6. Web site: East 149th Street Neighborhood Map. April 2018. new.mta.info. Metropolitan Transportation Authority. February 28, 2019.