Blue Line (Ahmedabad Metro) Explained

Blue Line
Type:Rapid Transit
System:Ahmedabad Metro
Status:Operational
Locale:Ahmedabad
Start:Thaltej Gam
End:Vastral Gam
Stations:18
16 (operational)
Open:4 March 2019
Operator:Gujarat Metro Rail Corporation Limited
Character:Elevated and underground
Stock:Hyundai Rotem
Linelength:21.23km (13.19miles)[1]
Gauge: (Standard gauge)
Electrification:750V DC Third Rail
Map State:collapsed

The Blue Line of the Ahmedabad Metro is the first metro line of the Ahmedabad city's mass rapid transit rail. It consists of 18 metro stations (including two under construction), starting from Vastral Gam and ending at Thaltej Gam, with a total distance of 21.23km (13.19miles), with most of the it being elevated.

History

The ground breaking ceremony was held on 14 March 2015 for the construction of long Vastral – Apparel Park stretch of Blue Line of the Phase-1 in presence of then Gujarat Chief Minister, Anandiben Patel. The work started in March 2016.[2] [3] [4] [5] The trial runs were carried out on the section in February 2019.[6] [7] The section was inaugurated on 4 March 2019 by Indian Prime Minister Narendra Modi along with Chief Minister of Gujarat Vijay Rupani and Deputy Chief Minister Nitinbhai Patel.[8] [9] It opened to the public on 6 March 2019.[10] The -long Thaltej-Thaltej Gam section and two metro stations, Thaltej Gam and Kankaria East, will be completed by December 2023.[11] [12] [13] The rest of the Phase-1 was inaugurated on 30 September 2022 by Prime Minister Modi.[14] The Blue Line was opened to public on 2 October 2022.[15] On opening day, total 41,700 tickets were sold, generating revenue of, and total 72 trips were made.[16] On next day, 17,000 people travelled on 44 trips.[17]

Features

While connecting Vastral Gam to Thaltej Gam, this line will be passing through Nirant Cross Road, Vastral, Rabari Colony, Amraiwadi, Apparel Park, Kankaria East, Kalupur Railway Station, Ghee Kanta, Shahpur, Old High Court, Stadium, Commerce Six Road, Gujarat University, Gurukul Road, Doordarshan Kendra and Thaltej stations.

The total distance of the corridor is 21.23km (13.19miles) with most of the it being elevated. The underground section is approximately in length with 4 underground stations, while the elevated section has 14 elevated stations. Old High Court station serves as an interchange station for the Blue Line and Red Line.

The underground section is constructed about 22 metre deep at the lowest level near Gheekanta station. The other three underground stations are about 12-14 metres deep.[18]

List of stations

Following is a list of stations on this route:[19]

Blue Line
Station NameOpeningConnectionsLayout
EnglishGujarati
1થલતેજ ગામDecember 2023[20] NoneElevated
2થલતેજ30 September 2022NoneElevated
3દૂરદર્શન કેન્દ્ર30 September 2022NoneElevated
4ગુરુકુલ રોડ30 September 2022Ahmedabad BRTS[21] at Helmet Cross RoadsElevated
5ગુજરાત યુનિવર્સિટી30 September 2022NoneElevated
6કોમર્સ છ રસ્તા30 September 2022NoneElevated
7એસ પી સ્ટેડિયમ30 September 2022NoneElevated
8જૂની હાઇ કોર્ટ30 September 2022Elevated
9શાહપુર30 September 2022NoneUnderground
10ઘીકાંટા30 September 2022NoneUnderground
11કાલુપુર રેલ્વે સ્ટેશન30 September 2022Ahmedabad Junction railway station and Mumbai–Ahmedabad high-speed rail corridor[22] Underground
12કાંકરિયા પૂર્વDecember 2023NoneUnderground
13એપેરલ પાર્ક4 March 2019NoneElevated
14અમરાઈવાડી18 May 2019NoneElevated
15રબારી કોલોની4 March 2019Ahmedabad BRTS[23] Elevated
16વસ્ત્રાલ4 March 2019NoneElevated
17નિરાંત ક્રોસ રોડ4 March 2019NoneElevated
18વસ્ત્રાલ ગામ4 March 2019NoneElevated

Construction

The Gujarat Metro Rail Corporation (GMRC) Limited has divided the construction work of the 20.73 km long Blue Line of Ahmedabad Metro into multiple construction packages.

The list of contractors is as follows:

Sr. NoPackage No. of StationsContractor
1.Vastral GamApparel ParkViaduct onlyJ. Kumar Infraprojects
2.Vastral GamApparel Park6DRA Infracon-CICO JV
3.Apparel Park DepotDepot onlyURC Construction
4.Kalupur – West Ramp2Larsen and Toubro
5.ThaltejThaltej Gam2DRA Infracon
6.East Ramp – Kalupur2Afcons Infrastructure

Notes and References

  1. Web site: PM Modi inaugurates Ahmedabad Metro first phase, takes a ride. Economic Times. 4 March 2019.
  2. Web site: India . 5 February 2015 . Mumbai-based firm wins bid for Ahmedabad metro construction . 2015-02-25 . The Indian Express.
  3. Web site: DeshGujarat . 14 March 2015 . First 6 km works of Ahmedabad Metro to complete by September 2016:CM . 2015-04-12 . DeshGujarat.
  4. Web site: 15 December 2015 . IL&FS; Engineering Services Bags Rs. 374.64 Cr Metro Rail Contract in Gujarat . 16 December 2015 . The Hans India.
  5. Web site: DeshGujarat . 22 October 2014 . MEGA invites tender for Vastral-Apparel Park stretch of Ahmedabad METRO Rail project . 2015-02-25 . DeshGujarat.
  6. News: Rs 3,116 cr spent on Ahmedabad Metro so far - Times of India . The Times of India . 2018-10-21.
  7. Web site: Now, Metro trial run will be held by February 18 - Times of India . 2019-01-20 . The Times of India.
  8. Web site: 2019-03-04 . PM Narendra Modi inaugurates Ahmedabad Metro first phase, takes a ride . 2019-03-08 . Mint . en.
  9. Web site: 2019-02-21 . Ahmedabad Metro Phase 2 gets Modi Cabinet clearance ahead of Phase 1 inauguration on 4 March . 2019-03-04 . The Financial Express.
  10. Web site: Ahmedabad Metro to open for public on Wednesday - Times of India . 10 March 2019 . The Times of India.
  11. Web site: 2022-05-15 . Ten firms bid for last section of Phase-2 of Ahmedabad Metro . 2022-06-11 . The Indian Express . en.
  12. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  13. Web site: 2022-09-17 . Ahmedabad Metro receives CMRS clearance . 2022-09-30 . The Indian Express . en.
  14. Web site: 28 September 2022 . PM Modi to launch Ahmedabad Metro Phase 1, flag off Vande Bharat Express during two-day Gujarat visit .
  15. Web site: 2022-09-30 . મેટ્રો ટ્રેનની સવારી: અમદાવાદમાં થલતેજ-વસ્ત્રાલ મેટ્રો ગાંધી જયંતીથી, એપીએમસી-મોટેરા 6 ઓક્ટોબરથી શરૂ થશે . 2022-09-30 . Divya Bhaskar . gu.
  16. Web site: 2022-10-02 . Huge demand on Day 1 of Ahmedabad Metro . 2022-10-03 . The Indian Express . en.
  17. Web site: 2022-10-03 . Ahmedabad: Metro service on North-South corridor to begin on October 6 . 2022-10-04 . The Indian Express . en.
  18. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  19. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  20. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  21. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  22. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.
  23. Web site: 2022-07-11 . Chugging in, clearing hurdles: Prime Minister to inaugurate Phase I of Ahmedabad Metro in August this year . 2022-07-13 . The Indian Express . en.