Ealing Broadway station explained

Ealing Broadway
Symbol:crossrail
Symbol2:underground
Symbol3:rail
Locale:Ealing
Borough:London Borough of Ealing
Manager:Elizabeth line[1]
Owner:
Railcode:EAL
Platforms:9
Fare Zone:3
Original:Great Western Railway
Pregroup:Great Western Railway
Postgroup:Great Western Railway
Events1:Opened (GWR)
Events2:Opened (DR)
Events3:Start (CLR)
Events4:Start (TfL Rail)
Years1:6 April 1838
Years2:1 July 1879
Years3:3 August 1920
Years4:20 May 2018
Railexits0405: 6.307
Railexits0506: 5.997
Railexits0607: 3.480
Railexits0708: 3.697
Railexits0809: 3.227
Railexits0910: 3.221
Railexits1011: 4.651
Raillowint1011: 91,526
Railexits1112: 5.071
Raillowint1112: 81,146
Railexits1213: 5.334
Raillowint1213: 86,052
Railexits1314: 5.286
Raillowint1314: 91,438
Railexits1415: 5.818
Railint1415: 0.107
Railexits1516: 6.581
Raillowint1516: 47,051
Railexits1617: 6.373
Raillowint1617: 37,391
Railexits1718: 6.166
Raillowint1718: 9,962 -->
Railexits1819: 6.555
Raillowint1819: 14,436
Railexits1920: 6.910
Raillowint1920: 23,653
Railexits2021: 2.066
Raillowint2021: 7,409
Railexits2122: 4.769
Raillowint2122: 17,992
Railexits2223: 8.237
Raillowint2223: 74,728
Tubeexits06:14.94
Tubeexits07: 17.53
Tubeexits08: 17.86
Tubeexits09: 16.62 -->
Dft Category:C1
Coordinates:51.5147°N -0.3017°W

Ealing Broadway is a major single-level interchange station located in Ealing, in the London Borough of Ealing, West London for London Underground services and also Elizabeth line services on the National Rail Great Western Main Line.

On the Underground, it is one of three western termini of the District line, the next station being, and it is also one of two western termini of the Central line, the next station being . On the National Rail network, it is a through-station on the Great Western Main Line, 5chain56chain down the line from, between and .

The station is managed by the Elizabeth line and saw a major upgrade and expansion as part of the Crossrail project, with a rebuilt ticket hall and the provision of step-free access.[2]

History

The Great Western Railway (GWR) opened its pioneering broad gauge tracks through Ealing Broadway between and on 6 April 1838, although Ealing Broadway station did not open until 1 December of that year. As the only station in the area when it opened, it was initially named 'Ealing',[3] but was renamed Ealing Broadway in 1875.[4]

District Railway (DR, now the District Line) services commenced on 1 July 1879, when the DR opened a branch from on its line. The DR built its own three-platform station (including a siding) to the north of the GWR one. However, following the installation of a connection between the two railways to the east of the stations, DR trains also served the GWR station from 1 March 1883 to 30 September 1885, on a short-lived service running to station, which quickly became unprofitable.[5] [6] [7] [8] It was also intended to use the connection for a service to station (via), but this was never introduced.

Following electrification of the main District line route through to in 1903, the section to Ealing Broadway was electrified in 1905, and the first electric trains ran to Ealing Broadway on 1 July 1905. The original brick-built DR station was replaced with a stone-faced building in 1910.[9]

Prior to World War I, plans were made by the GWR to construct a new, mainly freight, line between Ealing and Shepherd's Bush, to connect west-to-south with the West London Railway. The Central London Railway (CLR, now the Central Line) would use the line by extending its tracks the short distance north from its terminus at Wood Lane (now closed), to meet the new GWR tracks. CLR services to two new platforms at Ealing Broadway, built between the GWR and DR stations, started on 3 August 1920, with, initially, just one intermediate stop at . The line also carried GWR steam freight trains until 1938, when the links at Ealing Broadway and west of were removed, and the line was fully transferred to London Underground.

Originally separate companies, by 1920 the DR and the CLR were both owned by the Underground Electric Railways Company of London (UERL). Despite this, the CLR services operated via the GWR station building, not the Underground one.

The GWR-built station was demolished in 1961[10] and replaced by a low concrete structure containing shops and a ticket hall, opened in 1965, with a high-rise office building above. The new station building serves all the lines, and the separate District Line station ticket hall was closed, although the building remains, and the original station facade is now the entrance for multiple shops.[11] [12]

On Platform 9 (District line) there are some roundels of a style dating from, three of which are replicas made in 1992.[13] [14]

In the mid 1990s, the Great Western Main Line through the station was electrified as part of the Heathrow Express project.[15]

In the early 1990s, the Crossrail project was proposed to serve Ealing Broadway.[16] After many years of planning, the project was approved in 2007. An interim TfL Rail service between suburban stations and London Paddington began in 2018,[17] transferring to the Elizabeth line on 24 May 2022.[18]

Accidents and incidents

Modern station

Layout

The combined station has nine platforms:

All platforms are accessed through a gateline of ticket barriers.

Crossrail upgrades

As part of the Crossrail project, the station has been upgraded and expanded to meet increased passenger numbers, improve the interchange between various rail and local bus services and provide step free access.

Initially, only minor station improvements were planned as part of the Crossrail project, such as platform lengthening.[24] However, after local and regional campaigning,[25] the station will be upgraded and step free access provided.[26] After further criticism by local people of poor design,[27] the station entrance was redesigned with a large glass frontage and a long curved canopy to the street.[28]

Designed by Bennetts Associates,[29] the station upgrade has involved demolishing the old cramped ticket hall and staircases, replacing them with:

After several periods of delay,[31] construction on the upgrade began in 2018 by Network Rail. On 27 May 2021, the majority of the new station facilities, including the station building and ticket office, were completed and opened to the public.[32]

Proposed developments

In the early 2010s, the West London Business group backed a Surbiton-to-Brent Cross light metro tube line, called the West London Orbital underground railway, based on Copenhagen Metro technology, which would include a station underground at Ealing Broadway.[33] [34] The London Borough of Ealing does not support the proposal, saying "no consensus to progress this project [due] to extremely high costs".[35]

In 2008, the London Group of the Campaign for Better Transport published a plan[36] for an off-road orbital North and West London Light railway (NWLLR), sharing the Dudding Hill Line freight corridor, and using the middle two of the six track beds at North Acton. In April 2009 Ealing Council voted to call on Transport for London to look into the proposal.[37]

The station would have been served by the West London Tram, however this proposal was cancelled in 2007 as it was opposed by the councils of all three London Boroughs that would have been served by the line.[38]

Services

Ealing Broadway is served by a mixture of National Rail and London Underground services. National Rail services are operated by the Elizabeth line and London Underground services are provided by the District and Central lines.

Services at the station are as follows.

Elizabeth line

As of the May 2023 timetable, the typical Monday to Friday off-peak service is:[39]

Elizabeth line services are operated using EMUs.

London Underground

The typical off-peak service in trains per hour is:[40] [41]

The Central line also operates a night service on Friday and Saturday nights as part of the Night Tube. The station is served by a train every 20 minutes to Hainault and from Loughton.

Connections

The station is served by several London Buses routes day and night.[42]

External links

Notes and References

  1. Web site: Ealing Broadway (EAL). National Rail Enquiries.
  2. Web site: Ealing Broadway station. https://web.archive.org/web/20150912100744/http://www.crossrail.co.uk/route/western-section/ealing-broadway-station. dead. 12 September 2015. 2020-06-30. Crossrail. en.
  3. Book: MacDermot, E.T.. History of the Great Western Railway . 1. 1. 1833–1863. Great Western Railway. 1927. London.
  4. Book: Borley, H.V.. Chronology of London Railways. 54.
  5. Book: Connor, Piers . Going Green: The Story of the District Line . 1993 . Capital Transport . Harrow Weald . 1-85414-157-0 . 14, 16 . The District Looks West.
  6. Book: Day, John R. . The Story of London's Underground . 1st . 1963 . . Westminster . 24–25 . The Metropolitan District and the Inner Circle.
  7. Book: Demuth, Tim . The Spread of London's Underground . 2nd . 2004 . Capital Transport . Harrow . 1-85414-277-1 . 8–9 . 1881-1890.
  8. Book: Rose, Douglas . The London Underground: A Diagrammatic History . 8th . December 2007 . 1980 . Capital Transport . Harrow Weald . 978-1-85414-315-0.
  9. Web site: Ealing Broadway District Line Station in 1903. Flickr. January 1903. 28 June 2017.
  10. Railway Magazine. January 1961. 62.
  11. Web site: Stop 3: Ealing Broadway station. londonpostcodewalks.wordpress.com. 31 January 2014. 28 June 2017.
  12. Web site: 2010-02-15. Ealing Broadway. 2020-06-30. Mayor's Question Time. en.
  13. Book: Clarke, Hedley . Underground Bullseyes 1972-2000 . 2007 . Connor & Butler . Colchester . 978-0-947699-40-6 . 6, 7, 50.
  14. Book: Leboff, David . London Underground Stations . 1994 . . Shepperton . 0-7110-2226-7 . 42.
  15. Web site: Heathrow Express. 2020-06-30. Railway Technology. en-GB.
  16. Web site: Crossrail – from its early beginnings. dead. https://web.archive.org/web/20200704064244/http://www.crossrail.co.uk/route/crossrail-from-its-early-beginnings. 4 July 2020. 2020-06-30. Crossrail. en.
  17. Web site: 18 May 2018 . TfL to operate Heathrow Connect services ahead of Elizabeth line opening . 2023-01-22 . Transport for London . en-GB.
  18. Web site: 24 May 2022 . All aboard the transformational Elizabeth line . https://web.archive.org/web/20220524080627/https://www.crossrail.co.uk/news/articles/all-aboard-the-transformational-elizabeth-line . dead . 24 May 2022 . 2023-01-22 . Crossrail . en.
  19. Book: Trevena, Arthur . Trains in Trouble . 1 . Atlantic Books . Redruth . 1980 . 41 . 0-906899-01-X.
  20. "7 Die in 60 mph Rail Crash", The Daily Telegraph (London), December 20, 1973, p. 1 ("At least seven people died and more than 50 were injured last night...")
  21. Book: Vaughan, Adrian . Obstruction Danger . 1989 . Patrick Stephens Limited . Wellingborough . 1-85260-055-1 . 235–38 .
  22. Web site: 19 July 2000. Bomb scares hit capital. live. https://web.archive.org/web/20190827081000/http://news.bbc.co.uk/2/hi/uk_news/840694.stm. 27 August 2019. 8 March 2021. BBC News.
  23. Web site: Report 24/2016: Derailment at Ealing Broadway. 2016-12-05. 2020-08-17. GOV.UK. Rail Accident Investigation Branch. en.
  24. Web site: 2010-03-08. The Future of Ealing Public Transport (1). 2020-06-30. Mayor's Question Time. en.
  25. Web site: Russell. Michael. 2009-10-07. Boris faces calls to improve Ealing Station. 2020-06-30. getwestlondon.
  26. Web site: Mann. Nick. 26 November 2013. Crossrail submits plans for major improvements to Ealing Broadway station. https://web.archive.org/web/20131128171726/http://www.crossrail.co.uk/news/articles/crossrail-submits-plans-for-major-improvements-to-ealing-broadway-station. dead. 28 November 2013. 2020-06-30. Crossrail. en.
  27. Web site: Friends of Haven Green. Ealing Broadway Station. 2020-06-30. en.
  28. Web site: Mann. Nick. 2 June 2014. Improved Ealing Broadway station designs revealed. https://web.archive.org/web/20140604114331/http://www.crossrail.co.uk/news/articles/improved-ealing-broadway-station-designs-revealed. dead. 4 June 2014. 2020-06-30. Crossrail. en.
  29. Web site: Crossrail Surface Stations. Bennetts Associates. 2020-06-30. 3 July 2020. https://web.archive.org/web/20200703095420/https://www.bennettsassociates.com/projects/crossrail-surface-stations/. dead.
  30. Web site: Ealing Council. Ealing Broadway station public realm improvements consultation. 2020-06-30. en.
  31. Web site: Ealing Broadway Station canopy delayed. Ealing Civic Society. 2020-06-30. 21 December 2018.
  32. Web site: Longhorn. Danny. 27 May 2021. Step-free access at Ealing Broadway station as new enlarged ticket hall opens to customers. RailBusinessDaily. Business Daily Group. 27 May 2021.
  33. Web site: West London Orbital. https://web.archive.org/web/20110718032029/http://www.westlondon.com/uploads/WLOSummary.pdf. 18 July 2011.
  34. Web site: February 2008. West London Orbital 2008 Update. dead. https://web.archive.org/web/20141111115304/http://www.capitasymonds.co.uk/pdf/WLO_Full_Document.pdf. 11 November 2014. 13 May 2012.
  35. Web site: 7 June 2011. LIP Public Consultation Meetings. dead. https://web.archive.org/web/20141014225105/http://www2.ealing.gov.uk/ealing3/export/sites/ealingweb/services/council/committees/agendas_minutes_reports/cabinet/24may2011-15may2012/_7_june_11/Item_16_-_Appendix_C.doc. 14 October 2014. 13 May 2012. London Borough of Ealing.
  36. Web site: London Campaign for Better Transport. dead. https://web.archive.org/web/20081012104134/http://www.bettertransport.org.uk/london_local_group. 12 October 2008. North and West London light railway (NWLLR) / Brent Cross Railway (BCR) plan
  37. Web site: Notes Of Council Meeting - 21st April 2009. dead. https://web.archive.org/web/20141220233512/http://www2.ealing.gov.uk/ealing3/export/sites/ealingweb/services/council/committees/agendas_minutes_reports/council/20may2008-15may2009/_21_april_2009/notes_of_council_meeting.doc. 20 December 2014. 24 November 2013. Ealing Council.
  38. News: Controversial tram plan derailed. BBC News. 3 August 2007.
  39. Web site: Elizabeth line timetable: 21 May to 9 December 2023 . Transport for London . 23 May 2023 . 21 May 2023.
  40. Web site: Central Line Timetable. Transport for London. 8 November 2022.
  41. Web site: District Line Timetable. Transport for London. 8 November 2022.
  42. Web site: Buses from Ealing Broadway. 15 July 2023. TfL. 14 July 2023.