Dunhua–Baihe high-speed railway explained

Dunhua–Baihe high-speed railway
Status:Operational
Stations:4
Open:24 December 2021[1]
Linelength:1130NaN0
Electrification:50 Hz 25,000 V
Speed:2500NaN0

The Dunhua–Baihe high-speed railway, or Changbaishan–Dunhua section of Shenyang–Jiamusi high-speed railway, is a high-speed railway line in China. It is 113km (70miles) long and has a design speed of 250km/h.[2]

History

Construction on the line began in August 2017.[3] Trial operation began on 29 October 2021.[4] It opened on 24 December 2021.

Route

The line runs from north to south, starting at the existing Dunhua railway station. It has two intermediate stations, Dunhua South and Yongqing. The southern terminus is Changbaishan.

Notes and References

  1. Web site: 沈佳高铁长白山至敦化段将于12月24日开通运营. Changbaishan–Dunhua section of Shenyang–Jiamusi high-speed railway opening on December 24..
  2. Web site: 新建敦化至白河高铁全线铺轨贯通 . 高铁网 . 9 April 2021 . 9 April 2021. zh. The new Dunhua to Baihe high-speed railway line is paved.
  3. Web site: 发挥交通引领先行作用 加快东部绿色转型发展 敦白客专铺轨启动仪式举行 . jl.gov.cn . 9 April 2021 . zh . 20 August 2020.
  4. Web site: 2021-11-01. 白敦铁路试运行. live. 2021-11-01. 人民网. https://web.archive.org/web/20211101174429/http://jl.people.com.cn/n2/2021/1101/c349771-34984094.html . 1 November 2021 .