Box Width: | 300px |
Inner West Light Rail | |
Status: | Fully operational |
Start: | Central Grand Concourse |
Stations: | 23 |
Routes: | L1 Dulwich Hill Line |
Ridership2: | 10.3 million (2017–18) |
Open: |
|
Owner: | Transport for NSW |
Operator: | Transdev Sydney |
Depot: | Pyrmont |
Stock: |
|
Tracklength: | 12.8km (08miles) |
Electrification: | from overhead catenary |
Map State: | collapsed |
The Inner West Light Rail is a 12.8km (08miles) light rail line in Sydney, New South Wales, Australia, running from Central railway station through the Inner West to Dulwich Hill and serving 23 stops. It was the original line of the Sydney light rail network. Services on the line are branded as the L1 Dulwich Hill Line since 2014.
Most of the Inner West Light Rail is built on the path of a former goods railway line. The first section of light rail opened in 1997, and the line was extended in 2000 and 2014 along the former goods corridor.
Operation and maintenance of the line is contracted to the ALTRAC Light Rail consortium by the New South Wales Government's transport authority, Transport for NSW. Services are operated by Transdev Sydney as a member of ALTRAC Light Rail.
Most of the alignment of the Dulwich Hill Line had its origins as the Rozelle–Darling Harbour Goods Line. From the time when the Sydney Railway Company was formed in 1848, it had been the intention of the company to build a freight terminal at Darling Harbour. To this end, a railway line was constructed between the Sydney railway station (the predecessor to Central railway station) and Darling Harbour, which opened on 26 September 1855.[1] This line was extended to Dulwich Hill via the John Street tunnel, the Glebe tunnel, and Lilyfield in 1922.[2] A short branch from Lilyfield to Rozelle served another freight terminal.
With widespread use as a freight line throughout the early 20th century, the use of containers and the decentralisation of freight terminals in Sydney to places such as Port Botany and Chullora, Darling Harbour traffic was reduced considerably. The port closed and the area was redeveloped in the 1980s.
Construction and conversion of the first section of line from Central station to Wentworth Park started on 25 January 1996 and took 16 months to complete.[3] [4] The 3.6km (02.2miles) line reused the former Darling Harbour goods railway line and the tram loop at Central station originally built for Sydney's former tram network, with a new section of track built along Hay Street to connect the two.
The original route opened for public operation with a limited 09:00 to 17:00 service on 11 August 1997 with three weeks of testing.[5] The official public opening was conducted by State Premier Bob Carr on 31 August 1997.[6]
Buoyed by the success of the original line, a 3.6km (02.2miles), four stop extension of the route opened on 13 August 2000.[5] [7] This saw the light rail reach Lilyfield, which was then the limit of the closed section of the goods line.
In 2009, goods traffic on the line between Rozelle and Dulwich Hill ceased and in February 2010, the Keneally Government announced a 5.6km (03.5miles) extension of the light rail from Lilyfield to Dulwich Hill.[8]
Work to upgrade the track and remove the overhead wiring began in August 2010.[9] The project received planning approval in February 2011.[10] The extension was originally scheduled to open in 2012, but in September 2011 the newly elected O'Farrell Government announced that it would not open until 2014, and that the cost had risen from $120 million to $176 million.
The Greenway walking and cycling path which was to run alongside much of the route was deferred. The new government blamed hasty planning by their predecessor for the delay and cost overruns, and the lack of an active transport masterplan for the deferral of the Greenway.[11]
The Greenway was revived in 2016 under the Baird Government with Federal funding support.[12] A Masterplan was developed and at the end of 2023 construction was continuing, with a major link under Parramatta Rd commencing. [13]
John Holland Group was announced as the successful tenderer for the infrastructure works on 31 May 2012, covering the design and construction of the nine stops, bridge works, signalling and power supply.[14] [15] The extension opened on 27 March 2014.[16]
The line was closed between Central and Convention in January 2017 to allow for construction work at the George and Hay Street intersection as part of the CBD and South East Light Rail project.[17] A further closure was required in January 2018 to install a junction between the two lines.[18] The connection is used by trams of the CBD and South East line to access the maintenance facility at Lilyfield.
See main article: Metro Transport Sydney. The line was owned by the Sydney Light Rail Company (SLRC) when it opened in 1997. The company was formed in March 1994 was awarded a 30-year concession to operate the light rail system until February 2028 when ownership would pass to the New South Wales Government.[19] [20] The service was initially operated by TNT Transit Systems.[21]
In August 1998, SLRC formed a joint venture with CGEA Transport named CGEA Transport Sydney to purchase TNT Transit Systems, who also owned the Sydney Monorail. This resulted in CGEA Transport taking charge of light rail operations. SLRC later combined with CGEA Transport Sydney to become Metro Transport Sydney in 2001, after Connex (renamed from CGEA Transport) sold its share in CGEA Transport Sydney.[22] Connex continued to operate the light rail network. Connex eventually came to be known as Veolia Transport globally in 2005, then became part of Veolia Transdev in 2011.[23]
Metro Transport Sydney was purchased by the Government of New South Wales in March 2012.[24] [25] Veolia Transdev (later just Transdev) remained the operator, operating as Transdev Sydney.
In February 2014, three consortia were short listed to build and operate the CBD and South East Light Rail. The contract also included the right to the operate the Dulwich Hill Line. The three short listed operators were Keolis (iLinQ consortium), Serco (SydneyConnect consortium) and Transdev (Connecting Sydney consortium).[26] [27] In December 2014, the Connecting Sydney consortium (which was renamed ALTRAC Light Rail) was awarded the contract, meaning Transdev retains the right to operate the Dulwich Hill Line. The new contract began in July 2015 and runs until 2034.[28] [29] [30]
When it first opened, the line used its own paper-based ticketing system that was separate from the semi-integrated ticketing systems used by the government owned operators. The light rail operated on a proof-of-payment system, with ticket vending machines provided at all stops. By the time the Lilyfield extension opened, the machines had been switched off and replaced with onboard conductors. Paper tickets were available in single or return with fares based on two zones. Other products available included flat fare day and weekly tickets, some of which also included travel on the monorail prior to that system's closure.
Several tickets were recognised on the light rail but were not sold on board. A "TramLink" ticket which allowed travel on Greater Sydney train services and the light rail was available from railway stations.[31] From 27 June 2011, all MyMultis, the Pensioner Excursion Ticket and Family Funday Sunday were also recognised.[32] This improved integration with the broader Sydney ticketing system led to a 30% to 40% increase in patronage on the line in the first months after introduction.[33] In 2012–13 these products comprised just over half of all tickets used on light rail services.
The smartcard-based Opal ticketing system was introduced to the line on 1 December 2014. Patronage increased in the months following the introduction of Opal.[34] Most paper tickets sold or recognised on light rail services were discontinued on 1 January 2016. The only tickets still available were single and return tickets.[35] These last remaining tickets were replaced by Opal-based single trip tickets on 1 August of that year.[36]
As the original line of Sydney's light rail network, the Dulwich Hill Line lacked special branding and was simply known as the Sydney Light Rail – and later Metro Light Rail after the system was re-branded. Following the purchase of Metro Transport Sydney by the New South Wales Government and the announcement of the CBD and South East Light Rail, the line was named Inner West Light Rail. Since the opening of the 2014 extension to Dulwich Hill, passenger-facing branding of the line has referred to it as the Dulwich Hill Line. The line was given the number L1 as part of a broader program to also number all Sydney Trains and Sydney Ferries routes.
A transport plan released by the New South Wales Government in 1998 reported that the line carried an average of 5,000 passengers on weekdays.[37] 2.8 million journeys were made in 2009–10, increasing to 4.2 million in 2012–13. The partial integration of the line into the broader Sydney ticketing system was a major driver of the increase.[38] [39] In the 12 months to June 2015, the line carried 6.1 million passengers, compared to 3.9 million passengers in the prior year. The increase in the 2014–15 figure was influenced by the opening of the extension to Dulwich Hill in March 2014, while the 2013–14 figure was affected by the suspension of services for much of October 2013 and closures for maintenance works.[40] [41] In the period from 2015 to 2016, 9.7 million journeys were made,[42] followed by 9.1 million in 2016–2017.[43] The 2016–2017 statistic was affected by a partial closure of the line in December 2016/January 2017 for construction works on the CBD and South East Light Rail.
The line operated without serious incident until 7 October 2013, when two trams derailed within the space of 20 minutes. Sections of track were replaced in September and it is thought the new track damaged the wheels of the vehicles.[44] [45] All services were suspended and replaced by buses. Services resumed between The Star and Lilyfield on 18 October, and along the full length of the line on 30 October.[46] [47] These incidents occurred in close proximity to Glebe, and 2106 was the only tram to be reported. The front car of it had come off the tracks, and its bogie was destroyed. After loading it onto a pony truck, it was driven under its own power to the depot. It would later be deemed damaged beyond repair and scrapped.
Following the incident temporary speed restrictions of 25kph were imposed at all crossovers (that allow vehicles to change between the two tracks) along the line. In July 2020, in response to a question about improving capacity on the line, the New South Wales Minister for Transport and Roads said the removal of eighteen crossings would "permit the removal of temporary speed restrictions associated with these crossings and improve journey time performance." The government was also investigating the purchase of four new vehicles to permit service at six minute frequencies, increasing capacity by 1,000 passengers per hour.[48]
In August 2017, a government report, obtained by the media under freedom of information provisions, revealed patronage was "exceeding all expectations" of transport planners. However it was impossible to introduce more peak hour services, which run every eight minutes. This is because of constraints associated with the single track near Dulwich Hill, stabling capacity, power, signalling, maintenance facilities and fleet size. The power supply limits frequency to six minutes, while the single track terminus at Dulwich Hill and fleet size limit frequency to eight minutes. The report suggested it would be possible to have more services per hour if shuttle services were to run between Central and Lilyfield. Patronage is expected to rise further with 4,700 new dwellings either recently completed or under construction along the line.[49] A few stops with difficult access (such as Leichhardt North, Taverners Hill, Dulwich Hill) have longer platforms, indicating that some allowance was made for operating longer vehicles in the future.
On 28 October 2021, service was suspended after cracking in welds was discovered in some of the Urbos 3 vehicles during routine inspections.[50] On 2 November, it was revealed that cracks had been found in the entire Urbos 3 fleet of 12 vehicles. On 5 November, it was announced the line would be closed for up to 18 months to allow the fleet to be withdrawn for repairs. These cracks were discovered to be "more significant than first thought". The government announced that there was a "design flaw" in the vehicles and they would be consulting other operators. A replacement bus service was put into operation to run the entire length of the line.[51]
To allow the line to reopen sooner, trams were borrowed from the CBD and South East Light Rail and tested on the Inner West Light Rail from December 2021.[52] L1 services resumed with the borrowed trams on 12 February 2022, but continued to be supplemented by buses between Central & the Star and ferries between Blackwattle Bay and Barangaroo.[53] Customers on the light rail and replacement bus services received a 30 percent fare discount while the Urbos 3 vehicles were repaired.[54]
The line is currently operated by CAF Urbos 3 & Urbos 100, and Alstom Citadis 305 vehicles. The first Urbos 3s entered service in July 2014, with the final vehicle delivered by the end of June 2015.
When the line first opened, a fleet of seven German-designed Variotrams were built in Dandenong by Adtranz to operate the services. The last Variotram was withdrawn in May 2015, with all put up for sale by tender.[55] Between the opening of the Dulwich Hill extension in March 2014 and the introduction of the first Urbos 3s, the Variotrams were supplemented by four leased Urbos 2 vehicles.
In November 2020, it was announced that four new vehicles would be purchased for delivery within two years.[56] In June 2021, a contract with CAF for four Urbos 100 (the variant on the existing Urbos 3) five-module unit was reported.[57] The new vehicles delivered to the fleet in August 2023, testing commenced from late August until it became fully operational on 7 December 2023.
The 23-stop route extends for 12.8km (08miles),[58] [59] including of on-street operation. Apart from Central, Capitol Square and Paddy's Markets, all stops are located on the route of the former railway line (although buildings have been constructed above and around the line in places).
Since, services on the L1 Dulwich Hill Line run from 05:00 until 01:00 the following day; approximate weekday frequencies are every 6 minutes during peak hours, every 10 minutes between the peaks and shouldering the peak period, and every 15 minutes at other times. Weekend and public holiday frequencies are every 10 minutes most of the day, reducing to every 15 minutes in mornings (before 09:00) and evenings.[60]
Prior to April 2024, light rail operated between Central and Dulwich Hill from 06:00 to 23:00, extending to 00:00 on Friday;[61] the current operating hours aligned inner west services with the L2 Randwick and L3 Kingsford lines of the CBD and South East Light Rail. Additional services between Central Grand Concourse and The Star, servicing the casino every 30 minutes after the end of full-line service, were suspended in 2020 due to the COVID-19 pandemic and have not since resumed.
Opened | |
---|---|
1997 | |
Transfer | |
Central railway station, Railway Square, Eddy Avenue & Elizabeth Street bus routes and L2 Randwick & L3 Kingsford lines at Central Chalmers Street light rail stop | |
Location | |
-33.8822°N 151.2064°W |
The stop is located at the midpoint of a single track unidirectional turning loop around Belmore Park. The stop consists of two platforms. Trams stop at the first platform to allow passengers to alight, then pull up to the second platform to allow boarding. The use of the loop avoids having to terminate the vehicles and the removes the need for the driver to change ends. This loop was not new; it had been used until 1957 as a route on the former Sydney tramway system, but in the opposite direction. The covered area in which the light rail stop is located was previously used as a staff car-park and bus interchange.
Passengers can change at Central for Sydney Trains and NSW TrainLink services. Also, the L2 and L3 lines can be accessed at the nearby Central Chalmers Street light rail stop. Sydney Metro trains will also serve Central from August 2024.
Opened | |
---|---|
1997 | |
Transfer | |
L2 Randwick & L3 Kingsford lines at Chinatown light rail stop | |
Location | |
-33.8798°N 151.2056°W |
Opened | |
---|---|
1997 | |
Transfer | |
None | |
Location | |
-33.8793°N 151.2028°W |
The area to the north of the light rail stop forms part of a major redevelopment of the Darling Harbour precinct. Prior to redevelopment, a public square existed between the stop and the Sydney Entertainment Centre – a former multi-purpose events venue. The redevelopment plans included the demolition of the Entertainment Centre, car park and monorail stop, and the creation of a 'creative quarter' named Darling Square featuring retail outlets, offices and apartments.[66] The public square adjacent to the light rail stop will be replaced with a new square further to the north. A pedestrian boulevard was constructed through the site of the Entertainment Centre, providing improved access from the stop to Darling Harbour. To prepare for the redevelopment, the monorail closed in June 2013 and demolition of the site commenced in December 2014.[67] The Entertainment Centre was replaced by the ICC Sydney Theatre, located near the Exhibition Centre stop.
To the west of the stop, the light rail crosses Darling Drive and joins the former freight railway corridor. The section of the corridor not being used by the light rail has been converted to a pedestrian pathway, dubbed The Goods Line.[68] [69]
Opened | |
---|---|
1997 | |
Transfer | |
None | |
Location | |
-33.8772°N 151.1996°W |
While the monorail ran until June 2013, there was a monorail stop that served the Sydney Exhibition Centre in the 1990s and early 2000s right next to and in parallel with the light rail stop. It closed some time in the mid-2000s. The purpose of this monorail stop was taken over by the Convention monorail/light rail stop, which required day-to-day interchanging between modes to get to this stop.
Opened | |
---|---|
1997 | |
Transfer | |
None | |
Location | |
-33.8728°N 151.1981°W |
A Sydney Monorail stop with the same name was located a few metres down Darling Drive towards Central. The monorail closed in June 2013.
Opened | |
---|---|
1997 | |
Transfer | |
Pyrmont Bay ferry wharf 389 bus route | |
Location | |
-33.8694°N 151.1975°W |
Opened | |
---|---|
1997 | |
Transfer | |
389 bus route | |
Location | |
-33.8681°N 151.1953°W |
The Star stop (formerly Star City) is the primary means of public transport serving The Star casino and entertainment complex, in Pyrmont.[73] The stop is located underneath the casino alongside a bus and coach stop. It also services commercial offices located in the area. Between 00:00 and 06:00, services from Central terminate at The Star. During the COVID-19 pandemic, these overnight services have been suspended since 21 March 2020 until further notice.
Opened | |
---|---|
1997 | |
Transfer | |
389 bus route | |
Location | |
-33.8672°N 151.1919°W |
Opened | |
---|---|
1997 | |
Transfer | |
501 bus route | |
Location | |
-33.8709°N 151.1924°W |
Opened | |
---|---|
1997 | |
Transfer | |
None | |
Location | |
-33.8744°N 151.194°W |
The stop opened with a single platform in 1997 when it was the original terminus of the line. When the light rail was extended to Lilyfield in August 2000, a new platform for Lilyfield bound services was opened. A crossover remains just past the city end of the stop. To the west of the stop, a heritage-listed viaduct carries the light rail over Wentworth Park.
Opened | |
---|---|
2000 | |
Transfer | |
None | |
Location | |
-33.8772°N 151.1874°W |
Opened | |
---|---|
2000 | |
Transfer | |
None | |
Location | |
-33.8754°N 151.1788°W |
Opened | |
---|---|
2000 | |
Transfer | |
433 bus route | |
Location | |
-33.8719°N 151.1728°W |
The Rozelle Bay stop serves a residential area in the north of Annandale.[83] It is on the edge of an embankment adjacent to its namesake bay. Access is by a shared walking and cycling path on a ramp from The Crescent below, by level access from Bayview Crescent or by the Green Bridge across the City West Link from the Rozelle Parklands (opened December 2023 on the former site of the Rozelle Railyards).
Opened | |
---|---|
2000 | |
Transfer | |
437 & 470 bus routes | |
Location | |
-33.8742°N 151.165°W |
During the corridor's time as a freight railway line, a junction between the Darling Harbour and Rozelle branches of the line was located to the west of the stop, with the stop located on what was the Darling Harbour branch. The junction also marked the western edge of Rozelle railway yard, which accounts for the width of the cutting.
Originally, only the stop's citybound platform was used. A set of points was located past the city end of the stop, allowing the outbound track to merge with the citybound track. There was no track adjacent to the outbound platform and the platform face was fenced off.
As part of the extension to Dulwich Hill, a stabling facility for four trams was built in the cutting, to the west of the stop.[85] The track configuration through the stop was also redesigned. In November 2013, the outbound platform was brought into use and the points at the city end were removed. A new crossover past the outbound end of the stop was installed to enable terminating trams to switch tracks and to provide access to the stabling facility.
Opened | |
---|---|
2014 | |
Transfer | |
440 & 445 bus routes | |
Location | |
-33.875°N 151.1541°W |
Opened | |
---|---|
2014 | |
Transfer | |
None | |
Location | |
-33.8787°N 151.1475°W |
The platforms are not located opposite one another, but are staggered, with the track crossing located between the platforms. The stop is located in a residential area, but adjacent to parkland on both the Leichhardt and Haberfield sides. Pathways were built between the closest streets – Hawthorne Parade in Haberfield and Darley Road in Leichhardt – including a bridge over the canal. This improved pedestrian access between the two suburbs which had been limited by the railway.
In the 2014 extension's design phase, the location of the stop was moved 80m (260feet) south and the bridge was moved 160m (530feet) south to avoid an off-leash dog area in Hawthorne Canal Reserve.[88]
Opened | |
---|---|
2014 | |
Transfer | |
437 & 438X/438N bus routes | |
Location | |
-33.884°N 151.1451°W |
Opened | |
---|---|
2014 | |
Transfer | |
461X/461N, 480 & 483 bus routes | |
Location | |
-33.8887°N 151.1453°W |
Opened | |
---|---|
2014 | |
Transfer | |
Lewisham railway station & 413 bus route | |
Location | |
-33.8934°N 151.1436°W |
The stop sits in a medium density residential area which was subject to urban renewal soon after the stop opened. The area on the Lewisham side of the stop featured various light industrial buildings. The Summer Hill side of the stop is dominated by the former flour mill complex, which underwent redevelopment. The mill provided the final traffic for the freight railway line, and the cessation of traffic after the mill's closure provided the catalyst for conversion of the line to light rail. The stop is located adjacent to the flour mill, within walking distance of Lewisham railway station on the Inner West & Leppington Line. The 2014 extension's Product Definition Report describes the positioning of the stop:
The site provides the most practical balance between meeting the interchange opportunity with Lewisham Station and the opportunities of the catchment and its two known developments.Access to the city is quickest via the heavy rail line, but the light rail provides north–south transport, in contrast to the heavy rail's east–west route.Patronage at this location is currently predicted to come approximately equally from walk-up catchment and from interchange. Future redevelopment will see this balance tip significantly in favour of catchment with the stop potentially becoming a focus of the local area.[94]
Opened | |
---|---|
2014 | |
Transfer | |
None | |
Location | |
-33.8989°N 151.14°W |
Opened | |
---|---|
2014 | |
Transfer | |
None | |
Location | |
-33.9017°N 151.138°W |
Opened | |
---|---|
2014 | |
Transfer | |
418, 428/428X & 445 bus routes | |
Location | |
-33.9052°N 151.139°W |
The original design provided access to the stop from both Hercules Street and New Canterbury Road. The access from Hercules Street was subsequently removed from the design with a pathway provided to New Canterbury Road in its place.[98]
Opened | |
---|---|
2014 | |
Transfer | |
Dulwich Hill railway station & 412 bus route | |
Location | |
-33.9105°N 151.1402°W |
In the 2014 extension's Environmental Assessment the stop was proposed to be located parallel to the railway station with direct access from Wardell Road. This was to have been achieved by widening the cutting used by the railway lines and removing angle parking on Bedford Crescent. It was proposed to construct an island platform with two tracks.
The design was altered after a review favoured moving the stop to the end of Bedford Crescent.[100] [101] This final design includes a single side platform and is further away from the railway station than the original proposal, but includes a connection to Jack Shanahan Park on the western side of the light rail alignment, which improved access to the park from the east and access to the stop from the west. Other improvements cited were reduced construction cost and environmental impact due to the elimination of the extensive work required to widen the cutting under the original proposal, and the reduced need to interface with RailCorp assets.[102]
In light of increasing patronage on the line, the single track terminus at Dulwich Hill now limits the number of services on the line, with frequency unable to be less than every eight minutes. In 2017, Transport NSW promised to consider upgrading the line to allow more services, including looking at the Dulwich Hill terminus, or alternatives such as running shuttle services to Lilyfield.[103]
The quickest access to the city is via the heavy rail line. The light rail runs to the north, in contrast to the heavy rail's east–west route. In October 2023, a new western concourse opened, providing lift access and transfer to the railway station.