Dubai Canal Explained

Dubai Canal
Canal Length:3.2km (02miles)
Begin Coord:25.2033°N 55.3271°W
End Coord:25.1963°N 55.2332°W
Date Began:2013
Date Completed:2016
Max Boat Length:32m (105feet)

Dubai Canal is an artificial water canal unveiled on 2 October 2013 and inaugurated on 9 November 2016. The canal side-walk comprises one shopping centre, four hotels, 450 restaurants, luxury housing, walkways and cycle paths. It is a 3.2km (02miles) long project starting from Business Bay into the Persian Gulf through Safa Park and Jumeirah. The width ranges from 80m (260feet) to 120m (390feet). It is 6m (20feet) feet deep and be crossed by 8m (26feet) high bridges. It creates new public places and facilities with a total area of 80000sqm with private marinas for boats and a trade centre at the entrance of the canal.[1] The development was designed by AE7 Architects and Planners.

Built by BESIX Group subsidiary Six Construct,[2] the canal is crossed by 3 pedestrian/bicycle bridges, including the Dubai Water Canal Bridge, better known as the Twisted Bridge and now renamed Bridge of Tolerance, so named by His Highness Shaikh Mohammad Bin Rashid Al Maktoum, Vice-President and Prime Minister of the UAE and Ruler of Dubai on November 15, 2017.[3]

Infrastructure

Roads and Transport Authority (RTA) built bridges over the canal for Sheikh Zayed Road, Al Wasl Road and Jumeirah Road. The Sheikh Zayed road bridge has eight lanes in each direction and three lanes in each direction on Al Wasl Road and Jumeirah Road. The crossings are 8.5 meters above the water to allow boats to pass underneath.[4]

The project also includes three pedestrian crossings in addition to footpaths on all three new bridges and four marina stations for public transport.

As of July 2014, the earthworks for the project near Sheikh Zayed Road had commenced.[5]

It was unveiled on 2 October 2013 and inaugurated on 9 November 2016. The canal and its bridges were built between 2014 and 2016 by BESIX subsidiary Six Construct.[6]

One of the first projects launched on Dubai Water Canal is Marasi Business Bay, which broke ground in June 2017.[7]

Notes and References

  1. News: Churchill . Neil . Dubai Unveils Dhs2bn Canal Project For Business Bay . 16 February 2014 . Gulf Business . 3 October 2013 . dead . https://web.archive.org/web/20140219164114/http://gulfbusiness.com/2013/10/dubai-unveils-dhs2bn-canal-project-for-business-bay/#.UwCuxGKSzSk . 19 February 2014 .
  2. Web site: November 13, 2016 . Besix completes Dubai Water Canal work . Trade Arabia.
  3. News: Dubai Mohammad Bin Rashid: Tolerance is synonymous with UAE . 15 November 2015. .
  4. Web site: Davids. Gavin. RTA to divide $544.5mn Dubai Canal project into three contracts . Big Project . 3 March 2014. dead. https://web.archive.org/web/20140308124653/http://www.bigprojectme.com/news/rta-to-divide-544-5mn-dubai-canal-project-into-three-contracts/. 8 March 2014.
  5. News: Work begins on Sheikh Zayed Road diversion as part of Dubai Canal project. . UAE . 21 July 2014 . 2 May 2021 .
  6. News: Six Construct completes Dubai Water Canal works . Construction Week .
  7. News: 'Floating homes' to be built in phase one of Marasi Business Bay in Dubai . . UAE . Michael . Fahy . 25 January 2017 . 2 May 2021 .