Downtown Berkeley station explained

Downtown Berkeley
Style:BART
Address:2160 Shattuck Avenue
Borough:Berkeley, California
Coordinates:37.8698°N -122.2682°W
Line:BART R-Line
Structure:Underground
Platform:1 island platform
Tracks:2
Connections: AC Transit: 6, 7, 18, 51B, 52, 65, 67, 79, 88, 800, 851, F, FS
Bear Transit: C, H, P, R, RFS
Bicycle:Station
Accessible:Yes
Architect:Maher & Martens
Opened:January 29, 1973
Rebuilt:2016–2018
Former:Berkeley (1973–1995)
Mapframe:yes
Mapframe-Zoom:14

Downtown Berkeley station is an underground Bay Area Rapid Transit (BART) station in the Downtown Berkeley section of Berkeley, California. It is served by the Orange and Red lines.

History

Southern Pacific

The Central Pacific Railroad opened its Berkeley Branch Railroad to the intersection of Shattuck and University Avenues on August 16, 1876.[1] Early civic leader Francis K. Shattuck donated land for the railroad and its depot, and subsidized the initial construction. Berkeley was the terminus of the line until 1878, when it was extended northwest along Shattuck. The Central Pacific was leased by the Southern Pacific Railroad (SP) in 1885, then transferred to its Northern Railway subsidiary in 1888. The first Berkeley station was a small wooden building at the northwest corner of Center Street and Shattuck; it was replaced in the 1890s by a slightly larger by still modest station.[2]

On October 26, 1903, the Key System began electric commuter rail operation from Berkeley to the San Francisco ferries – a direct threat to the SP's steam-hauled trains – on a line that paralleled the SP tracks on Shattuck.[3] Around that time, Cal president Benjamin Ide Wheeler and other prominent Berkeley academics lobbied SP president E. H. Harriman for an improved train station to complement John Galen Howard's emerging architectural style for the nearby University of California, Berkeley. Finally, the devastating 1906 earthquake and subsequent rebuilding "served as a powerful incentive to expedite the project".

Surveying work began in June 1906; that September, SP management announced their intentions to convert their suburban lines to a frequent electric service to compete with the Key System. The new station, an elegant red brick structure with buff terracotta trim, red tile roof, and a colonnade, opened on April 9, 1908. It was officially designed by SP architect Daniel J. Patterson in a similar style to Émile Bénard's original plans for the university, though the high quality of its design and circumstantial evidence led some historians to believe it was actually designed by Howard.[4] The SP lines were fully electrified in 1911.

BART

The BART Board approved the name "Berkeley" in December 1965.[5] The station opened on January 29, 1973, as part of the extension from to . The station was designed by Maher & Martens of San Francisco in collaboration with Parsons Brinckerhoff, Tudor Construction, and Bechtel.[6]

In 1995, BART changed the name of the station from "Berkeley" to "Downtown Berkeley" in an effort to minimize confusion between this station and North Berkeley.

Removal of rotunda

A station and plaza renovation project began construction on August 29, 2016[7] and opened to the public on October 19, 2018.[8] The new plaza includes new lighting, landscaping, drainage, paving, and bus shelters in the overground plaza of the station. The old main rotunda entrance has been removed and was replaced by a glass entrance structure similar to those in Downtown Oakland.[9] The $11.2 million project is funded primarily by BART, with additional funding from the City of Berkeley, Metropolitan Transportation Commission, and Alameda County. A further project to renovate the underground station interior is in the planning stages.[10]

The entrances on the southern end of the station were closed from April 13, 2020, to June 12, 2021, due to low ridership during the COVID-19 pandemic.[11] Bathrooms at underground BART stations were closed after the September 11 attacks due to security concerns. The bathroom at Downtown Berkeley station reopened on June 30, 2023, after a renovation, with an attendant on duty during all operating hours.[12]

Station layout

Like most underground BART stations, Downtown Berkeley has two levels: a mezzanine containing the faregates and an island platform with two tracks. Access to the station is provided by five street-level entrances on Shattuck Avenue, with two at Addison Street and Allston Way each and one at the southwest corner of Shattuck Avenue and Center Street.[13] The escalators at the latter were topped by an 24-sided rotunda featuring artwork of the UC Botanical Garden.

External links

Notes and References

  1. Book: Robertson, Donald B. . Encyclopedia of Western Railroad History: California . 77 . 1986 . Caxton Press . 978-0-87004-385-7 . Google Books.
  2. Web site: Berkeley, Alameda Co., Cal . Charles A. Bailey . 1890 . Online Archive of California.
  3. A pictorial history of public transportation in the East Bay, commemorating the achievements of the last century – from the beginning of the first train and ferry service in 1863 to the vast transportation network of today operated by the Alameda-Contra Costa Transit District . Transit Times . 17, 26 . 6 . 5 . September 1963 . Alameda-Contra Costa Transit District.
  4. Web site: Berkeley Square: from transport hub to urban core . Berkeley Architectural History Association . Daniella . Thompson . August 18, 2008.
  5. News: Names Approved for 38 Rapid Transit Stations Around Bay . Oakland Tribune . December 10, 1965 . 10 . Newspapers.com.
  6. Book: Cerny . Susan . An Architectural Guidebook to San Francisco and the Bay Area . 2007 . Gibbs Smith . 978-1-58685-432-4 . 502.
  7. News: Construction begins on Downtown Berkeley BART station plaza. Pao. Roann. 30 August 2016. The Daily Californian. 8 February 2017.
  8. Web site: New Downtown Berkeley BART Plaza opens to fanfare. Dinkelspiel. Frances. Frances Dinkelspiel . October 19, 2018 . Berkeleyside. October 23, 2018.
  9. Web site: Downtown Berkeley BART Plaza and Transit Area Improvement Project. Bay Area Rapid Transit District. 8 February 2017.
  10. Web site: Downtown Berkeley Station Modernization. Bay Area Rapid Transit District. 8 February 2017.
  11. BART opens all entrances/exits that were previously closed due to pandemic . June 12, 2021 . San Francisco Bay Area Rapid Transit District.
  12. BART reopens restrooms at Embarcadero and Downtown Berkeley stations . June 30, 2023 . San Francisco Bay Area Rapid Transit District.
  13. Web site: Downtown Berkeley Station map . San Francisco Bay Area Rapid Transit District . https://web.archive.org/web/20141008004027/http://www.bart.gov/stations/dbrk/map . October 8, 2014 . July 29, 2019 . live .