Dong Hoi Airport Explained

Dong Hoi Airport
Nativename:Vietnamese: Sân bay Đồng Hới
Iata:VDH
Icao:VVDH
Pushpin Map:Vietnam
Pushpin Map Caption:Location of airport in Vietnam
Pushpin Label:VDH/VVDH
Pushpin Label Position:right
Type:Public
Owner-Oper:Airports Corporation of Vietnam
City-Served:Đồng Hới
Location:Đồng Hới
Elevation-F:59
Elevation-M:18
Coordinates:17.515°N 106.5906°W
Metric-Elev:y
Metric-Rwy:y
R1-Number:11/29
R1-Length-F:7,874
R1-Length-M:2,400
R1-Surface:Concrete
Stat-Year:2019
Stat1-Header:Aircraft movements
Stat1-Data:not available
Stat2-Header:Total passengers
Stat2-Data:539,908(N/A%)
Timezone:UTC+7[1]

Dong Hoi Airport is an airport located in Loc Ninh commune, 6km (04miles) north of Đồng Hới city, capital of Quảng Bình Province, in North Central Coast of Vietnam, about 500km (300miles) southeast of Hanoi by road. The facilities cover 173 ha, on a sandy area, by the coast of South China Sea. The runway approaches near the seashore and nearly parallel to the Highway 1. The airport, like all civil airports in Vietnam, is owned and operated by Airports Corporation of Vietnam.[2]

The airstrip was built unpaved by French colonists in the 1930s to serve the First Indochina War and was later upgraded by North Vietnam as an airbase for the Vietnam War. On 30 August 2004, the reconstruction of the airport began and was scheduled to be completed in 2006[3] but not until May 2008 was it inaugurated. On May 18, 2008, the airport was officially put into operation with the first commercial flight from Hanoi's Noi Bai International Airport.[4] [5]

As of March 2015, this is one of 4 commercial airports in North Central Coast, the others are Phu Bai International Airport in Huế, Vinh Airport in Nghệ An Province, and Tho Xuan Airport in Thanh Hóa Province.

The airport handled 500,000 passengers in 2017, to its full designed capacity.[6] The airport is estimated to handle 700,000 passengers in 2018.[7]

An expansion project is planned to start in the Q4 2018, with the extension of the runway to 3600 m (category runway 4E) along with one parallel taxiway, capable of serving large aircraft like Airbus A350, Boeing 787, with two separate international and domestic terminals, with a combined designed capacity of 10 million passengers per annum.

History

The site of the airport was formerly an unpaved airstrip built by the French colonists and used from 1930 to 1954 to launch air raids against Viet Minh forces in the Central of Vietnam and Laotian communist forces Pathet Lao in the Central and Southern Laos during the First Indochina War.

In Vietnam War, the government of the Democratic Republic of Vietnam consolidated the runway surface of the airfield. This airstrip was used by North Vietnam as a transit point for air transport of personnel or cargo to the battlefields in the South Vietnam, especially those along the Ho Chi Minh trail.

However, during Vietnam War, this airstrip was not the base for North Vietnamese air attack on the United States battleships on South China Sea in an air raid known as Battle of Đồng Hới. The North Vietnamese fighters took off from Khe Gát Airfield near Phong Nha-Kẻ Bàng National Park instead.[8]

This airstrip was the site Ho Chi Minh landed for his North Vietnamese southernmost visit ever to Quảng Bình during Vietnam War, he landed here at 8:30 am June 16, 1957 and took off back to Hanoi at 5 pm June 17, 1957.[9] It was also the site then North Vietnamese prime minister Pham Van Dong and Cuban president Fidel Castro landed for a visit to the then newly occupied zone by North Vietnam of Quảng Trị in 1972.[10] General Văn Tiến Dũng landed here before entering South Vietnam for direct command of communist forces in the last period of Vietnam War renowned as Ho Chi Minh Campaign in 1975.[11]

After the fall of Saigon, this airfield was controlled by the Vietnam People's Army but used it for military and flood rescue activities on an irregular basis, and the airfield was actually almost abandoned.

In 2003, Phong Nha-Kẻ Bàng National Park was listed in UNESCO's World Heritage Sites list.[12] The park contains systems of grottoes and caves, of which Vietnamese and British scientists have so far surveyed 20 with a total length of 70 km. Besides caves and grottoes, Phong Nha has the longest underground rivers, the largest caverns and passageways, the widest and prettiest sand banks, and the most astonishing rock formations in the world.[13] Moreover, Phong Nha-Kẻ Bàng is rich in biodiversity. At the final conference of the National Council for Cultural Heritage held in Vietnam in 2007, scientists attending the meeting highly praised the scientific documentation of Phong Nha-Ke Bang park. Accordingly, the park is second to no other national parks listed in UNESCO's world heritage sites as far as biodiversity is concerned.[14] Since Phong Nha-Kẻ Bàng National Park was listed in UNESCO's World Heritage Sites, the number of tourists to this park increased significantly,[15] which required air links between this province with other major cities of Vietnam, namely Hanoi and Ho Chi Minh City.

The construction of Dong Hoi Airport was started on August 30, 2004 and was scheduled to be completed by the last quarter of 2007.[3] The estimated cost to build the airport is $15 million, which was invested by the Northern Aviation Authority of Vietnam, an entity under the Civil Aviation Administration of Vietnam.[16] [17] The construction schedule of the airport was behind the schedule due to lack of capital from the government. It was scheduled to be completed in February 2008, but there were some pending items (10% of the total work), the deadline was extended.[18] According to the next revised schedule, this airport would be completed and opened in 3rd quarter of 2008.[19] Construction of the facilities achieved completion in May 2008. The Prime Minister of Vietnam signed a decision dated May 15, 2008 to put this airport into operation on May 18, 2008. The first commercial flight originated from Hanoi's Noi Bai International Airport landed at this airport on May 18, 2008, the official inaugural date of the airport.[20] In April 2018, a Vietnamese private conglomerate, FLC Group (the owner of the Bamboo Airways) submitted to the Vietnamese authorities its proposal to expand this airport. The Ministry of Transport of Vietnam has approved this proposal to expand this airport in Q4 of 2018 and to launch more international flight routes.[21] [22] The expansion is scheduled to start in Q4/2018 with the expansion of the runway to 3600 m, construction of a new terminal with designed capacity of 10 million passengers per annum and other auxiliary facilities.

After the completion of the expansion project in 2020, this airport will have one 4E category runway (3600 m x 45 m) along with one parallel taxiway, capable of serving large aircraft like A350, B787, with two separate international and domestic terminals, designed capacity of 10 million passengers per annum.[23]

Facilities

Dong Hoi Airport covers 173 ha, has one concrete paved runway (2,400 m x 45 m), ranked 4D according to ICAO, a two-story 4282-square-meter terminal, 15,000-square-meter apron for 2 Airbus A320 and Airbus A321s or equivalent, an air traffic control tower and six check-in counters and security equipment. The airport is capable of handling medium range aircraft like Airbus A320, A321 or equivalent. Expansion plan has been approved by the government of Vietnam to make this airport capable to serve jumbo jets like Boeing 767.

This airport has a designed capability of 300 passengers/peak hour or 500,000 passengers per annum.[20] [24] [25] An instrument landing system was equipped in 2013. The apron was scheduled to be expanded in 2014 to add 2 more parking spaces for medium range aircraft.[26] The installation of runway lighting was completed on October 16, 2014, allowing the operation 24/24.

Airlines and destinations

Current destinations

The airport serves Dong Hoi city. It will serve mainly tourists to beaches in Dong Hoi city and World Natural Heritage of Phong Nha-Kẻ Bàng National Park, the starting point of The Middle World Heritage Road. As of July 2020, Vietnam Airlines, VietJet Air, Pacific Airlines are providing non-stop flights linking this airport with Noi Bai International Airport (Hanoi) and Tan Son Nhat International Airport (Ho Chi Minh City),[16] [27]

The first international flight from this airport to Chiang Mai was launched by Jetstar Pacific (now Pacific Airlines) on August 11, 2017, with two flights per week[28]

Former routes

Future destinations

Depending the actual demands, Vietnam Airlines will open flights linking this airport with Lien Khuong Airport (Da Lat), Cam Ranh Airport (Nha Trang).[16]

Statistics

Statistics in 2009-2011[26]

See also

References

  1. https://www.worldtimeserver.com/current_time_in_VN.aspx?city=Dong_Hoi
  2. http://www.caa.gov.vn/eDefault.aspx?tabid=8&catid=506&articleid=8569 Establishment of a new Airports Corporation in Vietnam
  3. Web site: Khởi công xây dựng sân bay Đồng Hới . https://web.archive.org/web/20170104164409/http://web.thanhnien.com.vn/Kinhte/2005/4/4/71585.tno . dead . 2017-01-04 . Thanh Nien . 2004-08-30 .
  4. Web site: Gov't to expand Dong Hoi airport . https://web.archive.org/web/20120213165146/http://www.vietnamnews.com.vn/showarticle.php?num=04ECO170508 . dead . 2012-02-13 . 2008-05-07 . Vietnam News .
  5. Web site: Khai trương cảng hàng không Đồng Hới. https://archive.today/20120629211817/http://www.tuoitre.com.vn/Tianyon/Index.aspx?ArticleID=258276&ChannelID=11. dead. 2012-06-29. 2008-05-19. 2008-05-19. Tuoi Tre.
  6. Web site: Chưa xây thêm nhà ga mới sân bay Đồng Hới (No new terminal at Dong Hoi Airport will be built in the near future. 2017-11-22. Cafef. vi. 2017-12-11.
  7. Web site: Sân bay Đồng Hới sẽ đón khoảng 700.000 lượt hành khách trong năm 2018 (Dong Hoi Airport will serve 700,000 passengers in 2018). 2018-08-26. 2018-08-27. Vietnambiz. vi.
  8. http://www.navweaps.com/index_tech/tech-025.htm Analysis of the Battle of Dong Hoi
  9. Web site: CÁC ĐIỂM DI TÍCH BÁC HỒ VỀ THĂM QUẢNG BÌNH. Quảng Bình Province Government.
  10. Web site: Reflections by the Commander in Chief - THE REPUBLICAN CANDIDATE . Ministerio de Relaciones Exterires de la República de Cuba . dead . https://web.archive.org/web/20080914051307/http://www.cubaminrex.cu/FidelAbsueltoHistoria/Articulos/Reflexiones/Comandante/2008/2008-02-14_IN.html . 2008-09-14 .
  11. Web site: Điện cho cảng Hàng không Đồng Hới . 2008-05-19 . dead . https://web.archive.org/web/20080701155423/http://www.crpc.vn/tintuc/detail.aspx?sj=SK&mt=673 . 2008-07-01 .
  12. Web site: Phong Nha National Park. UNESCO.
  13. Web site: Phong Nha-Ke Bang national park, world heritage . Vietnamtourism . dead . https://web.archive.org/web/20080516062955/http://www.vietnamtourism.com/e_pages/heritage/phongnha.asp . 2008-05-16 .
  14. http://english.vietnamnet.vn/tech/2007/11/754641/ Phong Nha-Ke Bang again proposed for world natural heritage recognition
  15. Web site: Tourists flock to Phong Nha-Ke Bang bringing alternative to illegal loggers . Vietnam News . 2004-09-16 . 2008-02-24 . https://web.archive.org/web/20080102064931/http://www.vnn.vn/kinhte/2004/03/54521/ . 2008-01-02 . dead .
  16. Feasibility Study Report approved by the Minister of Transport of Vietnam in 2004
  17. http://www.quangbinh.gov.vn/ Quảng Bình province website
  18. News: T . T . Sân bay Đồng Hới sẽ được đưa vào khai thác trong dịp Tết Nguyên đán 2008 . . 2007-10-21 . 2008-02-27 . https://web.archive.org/web/20080223061424/http://www.giaothongvantai.com.vn/Desktop.aspx/News/tin-tuc-su-kien/San_bay_Dong_Hoi_se_duoc_dua_vao_khai_thac_trong_dip_Tet_Nguyen_dan_2008/ . 2008-02-23 . dead .
  19. News: Thanh . Chau . Cần đẩy nhanh tiến độ xây dựng sân bay Ðồng Hới . . January 16, 2008 . 2008-02-27 . dead . https://web.archive.org/web/20110829003201/http://www.baoxaydung.com.vn/Main.aspx?MNU=1115&Style=1&ChiTiet=4646 . 2011-08-29 .
  20. Web site: Quảng Bình: Mở cảng hàng không Đồng Hới (Quảng Bình: Opening of Dong Hoi Airport) . 16 May 2008 . Lao Động (issue no. 109) . 2008-05-16 . https://web.archive.org/web/20080520005416/http://www.laodong.com.vn/Home/kinhte/2008/5/88754.laodong . 2008-05-20 . dead .
  21. Web site: Quảng Bình đề xuất mở đường bay quốc tế đến Đồng Hới (Quang Binh proposes to launch new international flights to Dong Hoi Airport). Báo giao thông. 2018-05-02. vi.
  22. Web site: FLC to upgrade Dong Hoi Airport. BizHub.vn. 2018-04-18. 2018-04-04.
  23. Web site: FLC muốn nâng công suất sân bay Đồng Hới lên 20 lần (FLC proposes to expand the capacity of the Dong Hoi Airport 20 times bigger) . TheLeader. 2019-05-03.
  24. Web site: Dong Hoi airport put into use . https://web.archive.org/web/20170810212208/http://www.mdulich.com/p/dong-hoi-airport-put-into-use.html . dead . 2017-08-10 . CPV . 2008-05-19 .
  25. Web site: Dong Hoi airport put into use. Vietnam News. 2008-05-19.
  26. http://vietnamairport.vn/page/130/cang-hang-khong-san-bay/cang-hang-khong-dong-hoi Airports Corporation of Vietnam Official Website
  27. http://vietnamairlines.com.vn/tabid/129/CatID/2/ContentID/124/Default.aspx Official website of Vietnam Airlines
  28. Web site: Quảng Bình: Sắp đưa vào khai thác đường bay quốc tế đầu tiên. 24 July 2017. 20 July 2017. 11 August 2017. https://web.archive.org/web/20170811143358/http://quangbinh.tintuc.vn/du-lich/quang-binh-sap-dua-vao-khai-thac-duong-bay-quoc-te-dau-tien.html. dead.
  29. Web site: Cảng hàng không Đồng Hới: Năm 2011 ước đạt 70.000 lượt khách (Dong Hoi Airport will handle estimated more than 70,000 passengers). quangbinhonline. 2011-10-12.
  30. Web site: Dong Hoi Airport ensures the operation in all weather conditions from October 2014 after the lighting system has been installed . Airports Corporation of Vietnam . 2015-02-11 . vi . dead . https://web.archive.org/web/20150211120948/http://vietnamairport.vn/page/1138/tin-tuc-va-su-kien/cang-hang-khong-dong-hoi-dam-bao-khai-thac-hieu-qua-he-thong-ha-canh-bang-thiet-bi-ils-va-he-thong-den-hieu-hang-khong . 2015-02-11 .
  31. Web site: Tổng công ty Cảng hàng không Việt Nam: Hội nghị tổng kết công tác năm 2015 và triển khai kế hoạch năm 2016 . 2016-01-19 . ACV . vi . dead . https://web.archive.org/web/20160128005124/http://vietnamairport.vn/page/2039/tin-tuc-va-su-kien/tong-cong-ty-cang-hang-khong-viet-nam-hoi-nghi-tong-ket-cong-tac-nam-2015-va-trien-khai-ke-hoach-nam-2016 . 2016-01-28 .
  32. Web site: Cảng hàng không Đồng Hới: Bảo đảm an toàn cho hơn 2.650 chuyến bay đi và đến. 2016-12-14. 2016-12-14. Báo Quảng Bình.

External links