Dona Francisca Hydroelectric Plant Explained

Dona Francisca Hydroelectric Plant
Name Official:Usina Hidrelétrica Dona Francisca
Location Map:Brazil
Location Map Caption:Location in Brazil
Coordinates:-29.4479°N -53.2847°W
Country:Brazil
Location:Agudo and Nova Palma, Rio Grande do Sul
Purpose:Hydroelectricity
Status:Operational
Opening:2001
Plant Turbines:2 Francis
Plant Capacity:125 MW (80 MW guaranteed)
Plant Annual Gen:679 GWh

The Dona Francisca Hydroelectric Plant (Portuguese: Usina Hidrelétrica Dona Francisca) is a hydroelectric plant on the Jacuí River in the state of Rio Grande do Sul, Brazil, completed in 2001. It delivers 80 MW guaranteed power.

History

The Dona Francisca Dam impounds the upper Jacuí River, and is divided between the municipalities of Agudo and Nova Palma, Rio Grande do Sul.The environmental study was undertaken by Engevix.The installation license was granted by FEPAM/RS on 1 July 1998.The initial concession of 35 years was granted on 28 August 1998.Construction began in August 1998.The operational license was granted on 30 November 2000.

The plant entered operation in 2001.The second generation unit came into operation on 12 April 2001.The plant was officially inaugurated on 21 May 2001 in a ceremony attended by Vice President Marco Maciel and governor of Rio Grande do Sul, Olívio Dutra.The State Electric Power Company (CEEE) and Dona Francisca Energética SA (Dfesa) received a 35-year concession to exploit the plant's power potential.

Technical

The reservoir has an area of .The dam is a high rolled compacted concrete structure.The powerhouse contains two Francis turbines.Water is delivered to the turbines from two penstocks, each long and in diameter.The total head is about .Installed capacity is 125 MW, with 80 MW guaranteed.Annual production is 679 GWh.

Financial

As of May 2001 investment was R$205 million.The total cost was US$130 million.The responsible companies were Gerdau (48%), Celesc (Santa Catarina Electric Power Plants: 20%), CEEE (10%) and Desenvix (2%).From 23 August 2010 the concession was divided between CEEE (10%) and Dona Francisca Energética (90%).Dona Francisca Energética is owned by Statkraft (2.12%), Copel (23.03%), Celesc (23.03%) and Gerdau (51.82%).

Impact

The reservoir floods parts of the municipalities of Agudo, Ibarama, Arroio do Tigre, Pinhal Grande, Nova Palma and Estrela Velha, all in Rio Grande do Sul.It affected 518 rural properties, and 540 families with a total of 2,709 people were required to move.The Quarta Colônia State Park is on the left bank of the reservoir of the Dona Francisca dam, with an area of .The park was created in 2005 as environmental compensation for the hydroelectric plant.