Dhaka Mass Transit Company Limited Explained

Dhaka Mass Transit Company Limited (DMTCL)
Type:Government-owned company
Industry:Rapid transit
Hq Location:Probashi Kallyan Bhaban (Level-14), 71, 72, Old Elephant Road, Eskaton Garden, Ramna
Location City:Dhaka
Location Country:Bangladesh
Area Served:Dhaka metropolis and adjoining areas
Key People:M. A. N. Siddique
Owner:Government of Bangladesh
Parent:Dhaka Transport Coordination Authority
Divisions:Road Transport and Highways Division

Dhaka Mass Transit Company Limited, commonly known as DMTCL, is a government-owned company responsible for operating Dhaka Metro Rail, a mass rapid transit system in Dhaka and adjoining areas. The company was established on 3 June 2013 under the Companies Act 1994, a law that governs companies in Bangladesh.[1] Out of 5 metro lines planned by the DMTCL, the MRT Line-6 was inaugurated on 28 December 2022 by the Prime Minister Sheikh Hasina.[2]

Vision

Moving People, Saving Time and Environment [3]

Mission

To reduce the traffic congestion by providing a fast, safe, reliable, air-conditioned, time-saving, electricity-driven, environment-friendly and remote-controlled public transport system for Dhaka and its adjoining areas.

Time-bound Action Plan 2030

Bangladesh Government has undertaken the following Time-bound Action Plan 2030 to establish a state-of-the-art robust Mass Rapid Transit (MRT) Network consisting of 6 (Six) Metro Rail routes which will have 104 stations along the total length of 128.741 kilometers line under Dhaka Mass Transit Company Limited (DMTCL).

SL
Name of MRT RoutePhaseProjected year of completionType
1MRT Line-6 *First2025Elevated
2MRT Line-1Second2026Elevated

and

Underground

3MRT Line-5: Northern Route2028
4MRT Line-5: Southern RouteThird2030
5MRT Line-2
6MRT Line-4
* In compliance with the Honorable Prime Minister's directives works for the extension of MRT Line-6 from Motijheel to Kamlapur is ongoing.

Route length and stations

The total length of Mass Rapid Transit or Metro Rail Network that is being implemented adhering the Time-bound Action Plan 2030 under Dhaka Mass Transit Company Limited (DMTCL) is 140.701 Kilometers. There will be 67 stations. The Route-based details are as follows: [4]

Name of MRT LineLength in Kilometer Number of Station
TotalElevatedUndergroundTotal #ElevatedUnderground
MRT Line-621.2621.26-|17|17|-|-|MRT Line-1|31.241|11.369|19.872|21|07|14|-|MRT Line-5:

Northern Route|20.00|06.50|13.50|14|05|09|-|MRT Line-5:

Southern Route|17.20|04.10|13.10|15|04|11|-|MRT Line-2*|35.00| colspan="5" rowspan="2" |To be finalized after Feasibility Study|-|MRT Line-4 *|16.00|-|Grand Total|140.701||||||}* Approximate Length

Station Names and Route alignment of Metro Rail Lines under Mass Rapid Transit (MRT) Network of Dhaka

MRT Line-6 [5]

Uttara North – Uttara Center – Uttara South – Pallabi – Mirpur 11- Mirpur 10- Kazipara – Shewrapara – Agargaon – Bijoy Sarani – Farmgate – Karwan Bazar – Shahbagh – Bangladesh Secretariat – Motijheel – Kamlapur

MRT Line-1 [6]

  • Airport Route: Airport - Airport Terminal 3 – Khilkhet – Nadda – Natun Bazar -  North Badda – Badda – Aftab Nagar – Rampura – Malibag – Rajarbag – Kamlapur
  • Purbachal Route: Joar Sahara – Boalia – Mostul – Sheikh Hasina Cricket Stadium – Purbachal Center -  Purbachal East – Purbachal Terminal

MRT Line-5: Northern Route [7]

Hemayetpur – Baliarpur – Bilamalia – Amin Bazar – Gabtoli – Dar-us-Salam – Mirpur 1 – Mirpur 10 – Kochukhet – Banani – Gulshan 2 – Natun Bazar - Vatara

Line-5: Southern Route [8]

Gabtoli – Technical – Kallyanpur – Shyamoli – College Gate – Asad Gate – Russel Square – Karwan Bazar – Hatirjheel – Tejgaon – Aftab Nagar – Aftab Nagar Center – Aftab Nagar East – Nasirabad – Dasherkandi

MRT Line-2 (Proposed Route) [9]

  • Main Line

Gabtoli – Dhaka Udyan – Mohammadpur Bus Stand – Jhigatola – Science Laboratory – New Market – Azimpur – Palashi – Dhaka Medical College – Gulistan – Motijheel – Kamlapur – Manda – Dakhshingaon – Damripara – Signboard – Bhuighor – Jalkuri – Narayangonj Zilla Sadar

  • Branch Line

Gulistan – Naya Bazar – Sadarghat

MRT Line-4 (Proposed Route) [10]

Kamlapur – Sayedabad – Jatrabari – Shonir Akhra – Signboard – Chattogram Road – Kanchpur – Madanpur

References

}

Notes and References

  1. News: Express . The Financial . Metro rail company functioning without paid-up capital . 28 December 2022 . The Financial Express . en.
  2. News: Tribune . Dhaka . PM Hasina will be first passenger of metro rail on Dec 28 . 28 December 2022 . www.dhakatribune.com . 21 December 2022 . en.
  3. Web site: 2024-06-04 . At a Glance-Dhaka Mass Transit Company Limited . 2024-06-04 . DMTCL Website.
  4. Web site: 2024-06-09 . At a Glance-Dhaka Mass Transit Company Limited . 2024-06-09 . DMTCL Website.
  5. Web site: 2023-10-04 . MRT Line-6 or First Elevated Metro Rail of Bangladesh . 2024-06-04 . DMTCL Website.
  6. Web site: 2023-10-04 . Route Alignment of MRT Line-1 . 2023-10-04 . DMTCL Website.
  7. Web site: 2023-10-04 . Route Alignment of MRT Line-5: Northern Route . 2024-06-04 . DMTCL Website.
  8. Web site: 2023-11-29 . Route Alignment of MRT Line-5: Southern Route . 2024-06-04 . DMTCL Website.
  9. Web site: 2023-10-04 . Route Alignment of MRT Line-2 . 2024-06-04 . DMTCL Website.
  10. Web site: 2023-10-04 . Route Alignment of MRT Line-4 . 2024-06-04 . DMTCL Website.