Stadium Name: | Daybreak Field at America First Square |
Location: | South Jordan, Utah United States |
Coordinates: | 40.5497°N -112.0225°W |
Broke Ground: | October 19, 2023[1] |
Opened: | 2025 (planned)[2] |
Owner: | Miller Sports + Entertainment[3] |
Construction Cost: | $140 million ($ in dollars) |
Tenants: | Salt Lake Bees (PCL) 2025-future |
Seating Capacity: | 6,500 (fixed seating) 8,500 (plus berm seating) |
Dimensions: | Left field: Center field: Right field: [4] |
Daybreak Field at America First Square is a baseball park under construction in South Jordan, Utah, United States, which is scheduled to open in spring 2025.[3] It will be the home of the Triple-A Salt Lake Bees of the Pacific Coast League.[2] The ballpark will replace the Bees' former home, Smith's Ballpark, where the team has played since its founding in 1994.[5]
In May 2023, Miller Sports + Entertainment (MSE) released renderings of Daybreak Field at America First Square. The stadium was designed by HOK and it is being built by Okland Construction.[6]
Daybreak Field is designed to meet the requirements of Major League Baseball teams. Its design includes a 12,000-sq.-ft. clubhouse, training and player development areas, and multiple batting cages.
The stadium is a privately-funded venture by Miller Sports + Entertainment, owners of the Bees.[3] It is part of a larger mixed-use entertainment district within the master-planned Daybreak Community, which is expected to take more than 15 years to complete.[7]
By October 17, 2024, the playing grass was fully installed.[8] The right and left field walls are feet away from the home plate as measured along the foul line. The distance from home plate to the center field wall is feet.[4]
The field is oriented east to provide a view of the Wasatch Mountains.