Daxing line explained
|
Other Name: | M4 South (planned name) Line 4 South |
Type: | Rapid transit |
System: | Beijing Subway |
Status: | Operational |
Locale: | Fengtai and Daxing districts Beijing |
Stations: | 11 |
Daily Ridership: | 310,000 (2014 Avg. Daxing Line only)[1] 376,000 (2014 Peak Daxing Line only)[2] |
Operator: | Beijing MTR Corporation Limited |
Character: | Underground and elevated |
Depot: | Nanzhaolu |
Stock: | 6-car Type B (SFM05) |
Linelength: | 21.76km (13.52miles)[3] |
Speed: | 100km/h (maximum service speed) |
Map State: | collapsed |
The Daxing Line of the Beijing Subway is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Gongyixiqiao, on the 4th Ring Road in Fengtai District, to Tian'gongyuan, beyond the 6th Ring Road in Daxing District. The Daxing Line is about 21.76km (13.52miles) in length with 18km (11miles) underground.[4] [5] Daxing line contains 12 stations and is about 21.76km (13.52miles). Initially, the Daxing line was planned to have 4 ground stations. However, due to lack of space, only Xihongmen was built above the surface.[6] Full-scale construction began in 2007 and the line was opened on 30 December 2010, 14:00 local time.[7] Daxing line's color is
teal, the same as Line 4.
Route and service
Though the Daxing Line is classified as a distinct line,[8] the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers. With the opening of the Daxing Line on 30 December 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:
- A full-route service that covers the entire Line 4 and Daxing Lines. This train service runs from Anheqiao North, the northern terminus of Line 4, to Tian'gongyuan, the southern terminus of the Daxing Line.
- A partial-route service that covers the entire Line 4 route plus one stop on the Daxing Line. This service runs from Anheqiao North to Xin'gong, the northernmost stop on the Daxing Line. Travelers wishing to proceed further south on the Daxing Line would have to switch to a south-bound full-route train.
Service routes
- — (through service via Line 4)
- — (through service via Line 4)
- Rush hour (7:00-8:00): — (through service via Line 4)[9]
Stations
History
- 1 June 2008: Construction began on Daxing Line. Completion set for the end of 2011.[10]
- 16 November 2008: Completion date moved up to 28 December 2010.[11]
- 20 April 2010: Completion date moved again to 28 October 2010.[7]
- 30 December 2010: Daxing Line opened.
Segment | Commencement | Length | Station(s) | Name |
---|
Gongyi Xiqiao — Tiangongyuan | 30 December 2010 | 21.762NaN2 | 11 | (initial phase) |
Anheqiaobei — Gongyi Xiqiao | 28 September 2009 | see Line 4 | (through services) | |
Notes
a. Line 4 ridership included.
b. See Web site: zh-hans . http://www.mtr.bj.cn/news/detail314.htm . zh:北京京港地铁有限公司 . . 2010-12-29 . 2011-01-05 . dead . https://web.archive.org/web/20110101112938/http://www.mtr.bj.cn/news/detail314.htm . 2011-01-01 . & Web site: Beijing MTR Corporation Limited . Mtr.bj.cn . 2010-09-27 . 2011-01-05 . dead . https://web.archive.org/web/20111009021952/http://www.mtr.bj.cn/en/news/detail41.htm . 2011-10-09 . (English)
References
- News: http://www.bjjtw.gov.cn/gzdt/dtxx/201209/t20120917_65370.htm . zh:我市轨道交通网络化运营效果凸显. 2012-09-17. 2013-09-15. Beijing Municipal Transportation Committee (Chinese: 北京市交通委员会) . dead. https://web.archive.org/web/20140903122947/http://www.bjjtw.gov.cn/gzdt/dtxx/201209/t20120917_65370.htm. 2014-09-03.
- Web site: http://bjrb.bjd.com.cn/html/2013-07/14/content_89669.htm . zh:地铁日客流突破1100万人次 . Liu Mian (Chinese: 刘冕) . 2013-07-15 . dead . https://web.archive.org/web/20130718222918/http://bjrb.bjd.com.cn/html/2013-07/14/content_89669.htm . 2013-07-18 .
- Web site: 组图:北京地铁大兴线轨道洞体全线贯通. 2010-01-07.
- Web site: zh-hans . http://www.bjdx.gov.cn/jrdx/dxxw/dxxx/2007n/105338.htm . zh:地铁大兴线01号标段(义和庄站)开工建设 . Daxing News . 21 December 2007 . 5 July 2008 . 16 March 2012 . https://web.archive.org/web/20120316143729/http://www.bjdx.gov.cn/jrdx/dxxw/dxxx/2007n/105338.htm . dead .
- Web site: zh-hans . http://paper.people.com.cn/jhsb/html/2009-10/08/content_356505.htm . zh:地铁大兴线各站年底全封顶 . . 8 October 2009 . 20 October 2009 . https://web.archive.org/web/20110721181827/http://paper.people.com.cn/jhsb/html/2009-10/08/content_356505.htm . 21 July 2011 . dead .
- Web site: zh-hans . http://www.chinanews.com.cn/cj/xfsh/news/2008/05-15/1251281.shtml . zh:北京地铁大兴线6月1日开工 计划2011年底通车 . . 15 May 2008.
- (Chinese) http://whatson.echinacities.com/Beijing/In-Pulse-Info/12033 20 Apr. 2010
- Web site: zh-hans . http://news.china.com.cn/local/2010-05/23/content_20097302.htm . zh:北京地铁4号线今年年底将与大兴线贯通运营 . news.china.com.cn . 23 May 2010 . 4 July 2010 . 9 October 2010 . https://web.archive.org/web/20101009003356/http://news.china.com.cn/local/2010-05/23/content_20097302.htm . dead .
- Web site: 明天起,地铁大兴线工作日早高峰最小行车间隔将缩至2分钟. 2021-05-07.
- Web site: zh-hans . http://www.bj.xinhuanet.com/bjpd_sdzx/2008-06/01/content_13422509.htm . https://web.archive.org/web/20080604042213/http://www.bj.xinhuanet.com/bjpd_sdzx/2008-06/01/content_13422509.htm . dead . 4 June 2008 . zh:北京地铁大兴线将开工 将建6个公交枢纽 . Beijing Morning News . 1 June 2008.
- Web site: zh-hans . http://www.gov.cn/jrzg/2008-11/16/content_1150696.htm . zh:北京地铁大兴线义和庄车站开始盾构施工 . . 16 November 2008.