Danzishi station explained

Danzishi
Native Name:弹子石
Native Name Lang:zh-Hans
Style:CRT
Address:Chongqing
Country:China
Operator:Chongqing Rail Transit Corp., Ltd
Structure:Ground level & Below ground
Platforms:2 (2 side platforms)
Accessible:3 accessible elevators (1 under construction)
Code:0/18
Opened:1 July 2019

Danzishi is a metro station on the Loop Line of Chongqing Rail Transit in Nan'an District of Chongqing Municipality, China.[1] [2]

It serves the area surrounding the Danzishi CBD, including nearby office buildings and residential blocks.

The station opened on July 1, 2019.

Station structure

Floors

1FAbove groundEntrance/Exits, Accessible elavator
Entrance/Exit passagewaysExit 2
Exit 3
B1 Line Station ConcourseExit 4, Ticket machines, Ticket gates, Customer service center, Accessible elevators
B2 Line PlatformsTrains
Interchange ChannelUnderpass interchange between platforms

Loop Line Platform

Platform Layout2 side platforms are in use for Loop Line trains travelling in both directions.
Side PlatformDoors open on the right
ToChongqing Library0/18Anti-Clockwise Loop
Clockwise Loop0/18To Haixialu
Side PlatformDoors open on the right

Exits

There are a total of 4 entrances/exits for the station, with Exit 1 currently under construction.

Exit 2 opened with a makeshift passageway due to construction setbacks on the actual exit.

ExitTo
2Tenglong Avenue, Chaotianmen Bridge
3Qunhui Road, Weiguo South Road
4Tenglong Avenue, Qunhui Road, Chongqing No.11 Middle School

Surroundings

Nearby places

Nearby stations

See also

Notes and References

  1. Web site: Chongqing Rail Transit network map . 2019-07-02 . 2019-05-11 . https://web.archive.org/web/20190511152053/https://www.cqmetro.cn/search-way.html . dead .
  2. http://www.chongqingtrip.org/transportation.htm Transportation in Chongqing