The Dabar Bridge is located between the Šibenik and Vrpolje interchanges of the A1 motorway in the Dalmatia region of Croatia. It is a long concrete girder bridge spanning the Dabar flash flood gully at a height of .
The bridge is long overall, executed across 7 spans (40m (130feet) + 5 x 50m (160feet) + 40m (130feet)). Axis of the bridge is in a horizontal circular curve in diameter. The cross section of the bridge comprises two dilated structures, each carrying one motorway carriageway consisting of two wide traffic lanes and one wide emergency lane. The bridge is wide overall.
The deck structure consists of longitudinal girders, cross-girders, and the deck. The abutments and the outermost piers support the structure through bearings while the remaining four piers are fixed to the deck structure. The longitudinal girders are executed as prefabricated, pretensioned girders and there are 10 longitudinal girders comprising the cross-section of the bridge, i.e. five of them, with axes set apart, supporting each of the carriageways. Length of the prefabricated girders ranges from 38.6m (126.6feet) to 39m (128feet) in the peripheral spans and between 48.24m (158.27feet) and 48.66m (159.65feet) in the remaining spans. The girders are high I-sections with wide upper flange. The bottom flange of the longitudinal girders is wide. The longitudinal girders were manufactured in a special plant next to the bridge construction site and placed in the bridge structure using incremental launching.
Bridge piers comprise a box cross-section measuring 5m (16feet) by 3.2m (10.5feet) with a constant wall thickness of . The top of each of the piers is closed by an Omnia slab 15cm (06inches) deep. Each motorway carriageway is supported by a separate set of piers. The abutments, on the other hand, are designed to support both of the carriageways. The cross-girders are placed at the abutments and the piers.[1] [2]
The Dabar Bridge was designed by Jure Radnić and constructed by Hidroelektra niskogradnja, Zagreb.[3]
Traffic is regularly counted and reported by Hrvatske autoceste, operator of the bridge and the A1 motorway where the bridge is located, and published by Hrvatske ceste.[4] Substantial variations between annual (AADT) and summer (ASDT) traffic volumes are attributed to the fact that the bridge carries substantial tourist traffic to the Dalmatian Adriatic resorts. The traffic count is performed using analysis of motorway toll ticket sales.
Dabar Bridge traffic volume | |||||||||
align=center style="background:#f2f2f2;" | Road | align=center style="background:#f2f2f2;" | Counting site | align=center style="background:#f2f2f2;" | AADT | align=center style="background:#f2f2f2;" | ASDT | align=center style="background:#f2f2f2;" | Notes |
A1 | 5316 Šibenik south | align=center | 7,923 | align=center | 17,450 | Between Šibenik and Vrpolje interchanges. |