Severe Tropical Cyclone Lua affected a sparsely populated region of Western Australia during mid-March 2012. Originating in a broad low pressure area that formed northwest of Australia by 8 March, the storm was plagued by inhibiting wind shear for the duration of its formative stages. However, it gradually organised, and received the name Lua on 13 March. The cyclone meandered for the first several days of its existence, caught between weak and competing steering currents. After the cyclone drifted northwestward, a building ridge of high pressure to the north drove Lua southeastward toward the Pilbara region. Ultimately intensifying into an upper-end Category 3 severe tropical cyclone with maximum sustained 10-minute winds of 155km/h, Lua made landfall near the remote community of Pardoo, about 150km (90miles) east of Port Hedland. It steadily weakened as it progressed south over interior Western Australia, diminishing below tropical cyclone status on 18 March.

The threat of the impending cyclone halted local industries such as oil production and iron ore mining and exporting. The Port of Port Hedland, a highly important iron ore shipping terminal, was forced to close for about 52 hours, contributing to inflated iron ore prices and delayed shipments. Multiple companies suspended work at oil fields and mines throughout the region, cutting national oil production by 25% and iron ore exports by 4.7% versus the previous month. Overall, Lua is attributed to $217 million (2012 AUD; $230 million 2012 USD) in lost revenue. Lua produced strong winds and widespread rainfall on land, but damage was limited by the lack of population in the storm's path. The Pardoo Roadhouse bore the brunt of the storm, and damage was reported at several other cattle stations and homesteads; at these sites, the storm damaged the exteriors of various structures and brought down swaths of trees. Central Western Australia endured several days of record-breaking rainfall and cool weather. The Government of Western Australia provided disaster relief funds to the hardest-hit areas, and Lua was later retired from the list of tropical cyclone names.

Meteorological history

Cyclone Lua originated in a broad area of disturbed weather that was spawned by a deep trough of low pressure and enhanced by a Madden–Julian oscillation pulse.[1] The precursor to Lua was first identified through satellite imagery by 8 March 2012, while situated about 1100km (700miles) to the north-northwest of Learmonth. Analysis of the disturbance revealed a diffuse low-level centre of circulation loosely bounded by sporadic, but multiplying, convection.[2] On 9 March, the Bureau of Meteorology's (BoM) Tropical Cyclone Warning Center (TCWC) in Perth recognised the developing system and remarked on the potential for tropical cyclone formation over the following several days.[3] The low pressure area meandered for several days, making some progress toward the east, and gradually consolidated.[4]

By 12 March, the system had developed persistent deep convection over the eastern half of its core and organised banding features elsewhere. Moderate vertical wind shear initially hampered intensification,[5] though the BoM designated the system Tropical Low 16U; at the time, it was centred roughly 230km (140miles) northwest of Karratha, Western Australia.[6] At 2300 UTC on 12 March, the Joint Typhoon Warning Center (JTWC) issued a Tropical Cyclone Formation Alert.[7] With increasingly favourable environmental conditions—including warm ocean waters and dwindling wind shear—the low organised significantly between 12 and 13 March, and at 0600 UTC on the 13th, TCWC Perth upgraded the low to Tropical Cyclone Lua.[8] Simultaneously, the JTWC issued its first tropical cyclone warning on 17S.[9] Contrary to real-time operations, the official BoM "best track" database does not list the storm as having attained Category 1 tropical cyclone intensity until 0000 UTC on 14 March.[4]

At the time of its designation, Lua was nearly stationary in terms of forward movement, caught in the equilibrium between a blocking ridge to the southwest and increasing monsoonal winds from the northwest.[8] The ridge began to drive Lua north-northwestward at up to 20km/h,[10] before the storm resumed its slow pace on 14 March.[11] The storm remained relatively disorganised, its strengthening limited by moderate wind shear and dry air entering its centre. Consequently, a large void of thunderstorm activity created a "horseshoe pattern".[12] Nonetheless, Lua proved resilient, and good outflow helped compensate for the adverse shear.[13] The southwesterly steering currents weakened, causing the storm to begin its anticipated curve toward the east and east-southeast.[14] According to the JTWC, the storm completed a small loop as a result of competing steering factors. At the same time, the upper levels of the atmosphere became far more conducive to the cyclone's intensification, and the storm's banding pattern tightened.[15] With a building ridge to its north, Lua accelerated east-southeastward on 15 March,[16] and with wind shear oscillating but generally decreasing, the storm became a Category 3 severe tropical cyclone at 1800 UTC.[4]

Continuing to intensify, Lua began to exhibit an ill-defined eye on visible satellite imagery on 16 March. The storm was expansive, producing storm-force winds in a circular area 850km (530miles) across.[17] Still, the deepest convection and most favourable outflow was focused away from the eastern semicircle due to persistent light easterly wind shear.[18] The storm's structure improved throughout the day and into the night,[19] and at 1800 UTC on 16 March, the storm attained its peak 10-minute maximum sustained winds of 155km/h, classifying it as an upper-end Category 3 severe tropical cyclone.[20] Early on 17 March, the storm turned due south toward the Pilbara coast, and the JTWC reported that Lua's peak strength was marked by 1-minute sustained winds of 175km/h, at 0600 UTC.[21] At its deepest, the storm possessed a central barometric pressure of 935hPa. Lua made landfall near Pardoo, about 150km (90miles) east-northeast of Port Hedland, at 0700 UTC while still at peak intensity.[1] The cyclone steadily weakened as it progressed southward,[22] tracking directly over the Yarrie mine before passing about halfway between Newman and Jigalong.[1] With little extant convection and a shallow, exposed centre, Lua deteriorated below tropical cyclone status early on 18 March near Wiluna. The cyclone's remnants later entered the Goldfields-Esperance region.[11]

Preparations and economic impact

The BoM hoisted its first Cyclone Watch on 14 March for coastal areas between Mardie Station and Cape Leveque.[23] A Cyclone Warning was posted the next day for a smaller stretch of coastline within that range.[24] As Lua approached the coastline, the Cyclone Warning was in place from Cape Leveque to Dampier. Communities between Bidyadanga and Port Hedland were under a Red Alert, the highest level of caution issued by the Fire and Emergency Services Authority of Western Australia (FESA). The alert advised included residents to "go to shelter immediately". Localities elsewhere between Broome and Whim Creek were on Yellow Alert, while a Blue Alert was issued between Whim Creek and Dampier, to the west of the Yellow Alert area.[25] Work at multiple oil fields and mining sites was suspended or slowed, with non-essential staff being removed at the sites remaining in operation. It was estimated that national oil production was reduced by about 25% during the storm's approach.[26]

Officials of the Port of Port Hedland, an important iron ore exporting terminal, closed and evacuated the port by the morning of 16 March, operating under standard emergency preparedness procedure.[27] Overall, nearly 40 ships in the port were relocated from the port out of the path of the storm. The Port of Dampier was also closed. The Port of Port Hedland reopened to shipping on 18 March, about 52 hours after its closure, with little or no damage reported,[28] though the downtime drove iron ore prices up for a time, and reduced exports of the raw material by 4.7% compared to the previous month. In total, Lua cost natural resources companies over $217 million (2012 AUD; $230 million 2012 USD) in stunted industry, accounting for nearly all of the monetary losses resulting from the storm.[29] [30]

With the destruction wrought by Cyclone Laurence in 2009 still fresh in their minds, residents, business owners, and farmers worked hurriedly to prepare their properties and livestock for Lua's onslaught.[31] Horizon Power temporarily redirected power supply in the towns of Marble Bar and Nullagine from solar power stations to diesel generator stations.[32] Evacuation shelters were opened to refugees of the storm with no safe living arrangements starting 16 March.[33] About 110 individuals sought shelter at one such location in Nullagine.[34] As the storm moved inland, flood warnings were posted throughout the Kimberley and the Pilbara,[31] where officials closed public access to Karijini National Park.[33] The impending cyclone forced the closure of the Great Northern and North West Coast highways,[35] while flights to and from several airports were cancelled.[36]

Meteorological effects and aftermath

On coming ashore, Cyclona Lua produced strong winds, gusting to 150km/h at Port Hedland,[37] and appreciable rainfall, peaking at 88.6mm at Bidyadanga.[1] The precipitation was widespread, affecting a large area of interior Western Australia. The overcast weather led to abnormally cool temperatures, which broke monthly records in portions of the central and eastern Pilbara. For instance, the Port Hedland Airport recorded a maximum temperature of 24.1 °C on 17 March, the coldest March day in the station's history; the previous record of 25.8 °C was set 64 years prior. As the remnants of Lua continued poleward, they continued to drop heavy rainfall, including a daily total (19 March) of 75mm at Edjudina, setting the record for the wettest March day there.[11] A barometer reading of 939hPa at Rowley Shoals represented the lowest observed pressure associated with the storm.[1]

Striking a relatively isolated area, the cyclone's effects were limited, and no fatalities or injuries were reported. Indeed, a FESA official noted that initial reports of damage were "scant".[38] Preliminary assessments suggested that Pardoo Roadhouse and the small surrounding community bore the brunt of the storm, as most towns and farms in the region escaped relatively unscathed.[39] The manager of the roadhouse relayed that the height of the storm was "absolutely horrific", downing numerous trees and causing some structural damage.[37] Some destruction was also observed at the Yarrie Homestead,[1] where return to normalcy was expected to take as long as 12 months.[37] Numerous buildings on the Warrawagine Homestead sustained damage such as compromised roofs and doors, which amounted to an estimated $70,000 (2012 AUD; 74,000 2012 USD[40]). Several head of cattle were killed by the storm.[41] Moderate to major flooding took place in several areas, especially along the De Grey River drainage basin,[42] though the rainfall proved beneficial in much of the climatologically dry area.[41] The above-normal precipitation allowed farmers to get a head-start on planting winter crops.[43]

In the aftermath of the storm, the Western Australia state government allocated relief funds to offset the cost of recovery and clean-up in several of the affected towns. Individuals and families became eligible to apply for personal grants and small business owners would be considered for special interest rates on new loans.[44] Local government entities listed under the proclamation were the shires of Ashburton, Broome, East Pilbara, Meekatharra, and the Town of Port Hedland. Disaster assistance money in these jurisdictions would be used to restore public assets and infrastructure impaired by the storm.[45] The name Lua was later retired from the cyclical list of tropical cyclone names due to the system's adverse effects on land and was replaced by the name Luana.[46]

See also

External links

Notes and References

  1. Web site: Severe Tropical Cyclone Lua. Bureau of Meteorology. 22 November 2013.
  2. Web site: Significant Tropical Weather Advisory for the Indian Ocean, 8 March 2012 1951z . 8 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032039/https://www.webcitation.org/665qxYGRk?url=http://gwydir.demon.co.uk/advisories/ABIO10-PGTW_201203090000.htm . 22 May 2024 .
  3. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone three-day outlook for the Western Region, 12:47 pm WST on Friday the 9th of March 2012 . 9 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032118/https://www.webcitation.org/665rDvD7L?url=http://gwydir.demon.co.uk/advisories/IDW10800_201203090447.htm . 22 May 2024 .
  4. Web site: International Best Track Archive for Climate Stewardship. 2012 LUA (2012069S14111). University of North Carolina, Asheville. 22 November 2013. https://web.archive.org/web/20160305083130/http://atms.unca.edu/ibtracs/ibtracs_current/browse-ibtracs/index.php?name=v03r05-2012069S14111. 5 March 2016. dead.
  5. Web site: Significant Tropical Weather Advisory for the Indian Ocean, 12 March 2012 0752z . 12 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032200/https://www.webcitation.org/667Vui514?url=http://gwydir.demon.co.uk/advisories/ABIO10-PGTW_201203121000.htm . 22 May 2024 .
  6. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone three-day outlook for the Western Region, 12:27 pm WST on Friday the 12th of March 2012 . 12 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032241/https://www.webcitation.org/6682hy48x?url=http://gwydir.demon.co.uk/advisories/IDW10800_201203120427.htm . 22 May 2024 .
  7. Web site: Tropical Cyclone Formation Alert, 12 March 2012 2300z . 12 March 2012 . Joint Typhoon Warning Center . 22 November 2012 . dead . https://web.archive.org/web/20111021130546/http://weather.noaa.gov/pub/data/raw/wt/wtxs22.pgtw..txt . 21 October 2011 .
  8. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 0704z 13/03/2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032319/https://www.webcitation.org/6682mm149?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203130705.htm . 22 May 2024 .
  9. Web site: Tropical Cyclone 17S (Lua) Warning Number 1 . 13 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032440/https://www.webcitation.org/669cxfLo5?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203130900.htm . 22 May 2024 .
  10. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 0145z 14/03/2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032357/https://www.webcitation.org/669c8xqzl?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203140145.htm . 22 May 2024 .
  11. Web site: Western Australia Climate Services Centre. March 2012 Western Australia Monthly Weather Review. 24 May 2012. Bureau of Meteorology. 22 November 2013.
  12. Web site: Tropical Cyclone 17S (Lua) Warning Number 5 . 14 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032722/https://www.webcitation.org/66CqRfQPQ?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203141500.htm . 22 May 2024 .
  13. Web site: Tropical Cyclone 17S (Lua) Warning Number 6 . 14 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032840/https://www.webcitation.org/66CqRZ9jB?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203142100.htm . 22 May 2024 .
  14. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 0104z 15/03/2012 . 15 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032518/https://www.webcitation.org/66B7ql7lT?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203150104.htm . 22 May 2024 .
  15. Web site: Tropical Cyclone 17S (Lua) Warning Number 7 . 14 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032759/https://www.webcitation.org/66CqRSeUS?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203150900.htm . 22 May 2024 .
  16. Web site: Tropical Cyclone 17S (Lua) Warning Number 8 . 15 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032600/https://www.webcitation.org/66CqPfils?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203152100.htm . 22 May 2024 .
  17. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 0701z 16/03/2012 . 16 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522033003/https://www.webcitation.org/66E9jUvHD?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203160701.htm . 22 May 2024 .
  18. Web site: Tropical Cyclone 17S (Lua) Warning Number 9 . 16 March 2012 . Joint Typhoon Warning Center . 22 November 2013 . dead . https://archive.today/20240522032641/https://www.webcitation.org/66CqPZaQa?url=http://gwydir.demon.co.uk/advisories/WTXS32-PGTW_201203160900.htm . 22 May 2024 .
  19. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 1853z 16/03/2012 . 16 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522032920/https://www.webcitation.org/66E9jIUw2?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203161853.htm . 22 May 2024 .
  20. Web site: Tropical Cyclones. Meteorology. corporateName=Bureau of. bom.gov.au. 9 August 2017.
  21. Web site: 17S.Lua Best Track. txt. Joint Typhoon Warning Center. 22 November 2013.
  22. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Technical Bulletin, 2109z 17/03/2012 . 17 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://archive.today/20240522033041/https://www.webcitation.org/66FhX06Ji?url=http://gwydir.demon.co.uk/advisories/AXAU01-APRF_201203172109.htm . 22 May 2024 .
  23. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Advice Number 1 . 14 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://web.archive.org/web/20090726132921/http://dynasmon.fortunecity.com/Perth.html . 26 July 2009 .
  24. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Advice Number 6 . 15 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://web.archive.org/web/20090726132921/http://dynasmon.fortunecity.com/Perth.html . 26 July 2009 .
  25. Web site: Tropical Cyclone Warning Center Perth . Tropical Cyclone Advice Number 26 . 17 March 2012 . Bureau of Meteorology . 22 November 2013 . dead . https://web.archive.org/web/20090726132921/http://dynasmon.fortunecity.com/Perth.html . 26 July 2009 .
  26. News: Reuters. Northwest Australia takes measures to face cyclone. 18 March 2012. The Taipei Times. 23 November 2013.
  27. News: Rania Spooner. 16 March 2012. Pilbara miners brace for Cyclone Lua. WA News. 22 November 2013.
  28. News: Daisy Tseng. Iron ore shipping resumes as Port Hedland avoids big hit from cyclone. 18 March 2012. Metal Bulletin.
  29. News: Rania Spooner and Peter Ker. Mining recovers after cyclone hit. 20 March 2012. The Melbourne Age.
  30. News: Ginger Ding. Iron ore from Port Hedland to China drops in March. 9 April 2012. Metal Bulletin.
  31. News: Pilbara residents brace for cyclone Lua. 16 March 2012. NewsComAu. 22 November 2013. 17 March 2012. https://web.archive.org/web/20120317090934/http://www.news.com.au/breaking-news/pilbara-residents-brace-for-cyclone-lua/story-e6frfku0-1226301760118. dead.
  32. Web site: Jennifer Fry. Tropical Cyclone Lua passes Marble Bar and Nullagine and continues towards the Mid-West. 18 March 2012. Horizon Power. 22 November 2013. https://web.archive.org/web/20140213084543/http://horizonpower.com.au/news_tropical_cyclone_lua.html. 13 February 2014. dead.
  33. News: Rania Spooner. 16 March 2012. Cyclone Lua gains strength as it nears WA coast. WA News. 22 November 2013.
  34. News: Australian Associated Press. Pilbara on alert for Cyclone Lua. 18 March 2012. Sunshine Coast Sunday.
  35. News: Joe Schneider. Cyclone Lua Batters Western Australian Mining Region. 17 March 2012. Bloomberg Businessweek. 22 November 2013. https://web.archive.org/web/20120317094706/http://www.businessweek.com/news/2012-03-16/cyclone-lua-strengthens-heads-toward-australian-coast. dead. 17 March 2012.
  36. News: The Pilbara braces as Cyclone Lua approaches. 16 March 2012. Australian Broadcasting Corporation. 22 November 2013.
  37. News: Cortlan Bennett. WA:Little damage from scary Cyclone Lua. 18 March 2012. Australian Associated Press.
  38. News: Cyclone hammers small WA community. 18 March 2012. Australian Broadcasting Corporation.
  39. News: Clean up begins after cyclone Lua hits. 19 March 2012. Australian Broadcasting Corporation.
  40. Web site: USD (US Dollars) to AUD (Australian Dollars) exchange rate for March 17, 2012. Exchange-rates.org. 24 November 2013.
  41. News: Cyclone Lua's fury also brings welcome rains. 22 March 2012. The Western Australia Countryman.
  42. News: Yasmine Phillips. Lua Lashes Coast. 18 March 2012. The Sunday Times.
  43. News: Seeding begins in WA. 3 April 2012. Australian Broadcasting Corporation.
  44. News: Attorney-General for Australia, Nicola Roxon. Tropical Cyclone Lua- Affected Western Australia Communities To Receive Disaster Assistance Under Natural Disaster Relief and Recovery Arrangements. 24 March 2012. Australian Government News.
  45. Web site: Department of Fire and Emergency Services. 2011/12 Wandrra Eligible Disaster Proclamation Notification: Tropical Cyclone Lua and Associated Flooding (17 March 2012). Government of Western Australia. 24 November 2013. https://web.archive.org/web/20130424124552/http://www.dfes.wa.gov.au/stateemergencymanagement/grantsandrecovery/wandrra/ActivatedEvents/WANDRRA%20_Web_%20Notification%20for%20TC%20Lua%20%20Assoc%20Flooding%20_17%20March%202012.pdf. 24 April 2013. dead.
  46. Web site: World Meteorological Organization. 2012. 24 November 2013. Tropical Cyclone Operation Plan for the South Pacific and South-East Indian Ocean. PDF.