Cyclone Christine Explained

Severe Tropical Cyclone Christine
Formed:25 December 2013
Dissipated:1 January 2014
Winds:90
Pressure:948
Winds:100
Pressure:948
Year:2014
Fatalities:None
Damage:Minimal
Areas:Western Australia, South Australia, Victoria
Season:2013–14 Australian region cyclone season

Severe Tropical Cyclone Christine was the third tropical cyclone and the second severe tropical cyclone of the 2013–14 Australian region cyclone season. It made landfall on Western Australia's Pilbara coast nearly halfway between the major towns of Karratha and Port Hedland as a category 4 cyclone on midnight of 31 December 2013.

Meteorological history

On 25 December the Australian Bureau of Meteorology reported that a broad monsoonal circulation that they had been monitoring to the northwest of Western Australia had developed a discrete centre of circulation.[1] Over the next few days the system slowly developed further as it moved towards the south-southwest, before during 28 December the BoM reported that the system had developed into a category 1 tropical cyclone on the Australian tropical cyclone intensity scale and named it Christine.[1] [2]

It intensified into a Category 2 storm on 29 December, Category 3 on 30 December, and then a marginal Category 4 on the same day. Watches and warnings were issued for areas between Derby and Exmouth, extending inland beyond the Pilbara to the Mid West and Goldfields-Esperance region around Wiluna and Leinster.

Christine made landfall between Roebourne and Whim Creek while strengthening around midnight on 31 December, with the eye passing through Roebourne itself, with Wickham skirting the edge of the eye. The storm began to turn to the southeast and began to weaken slowly.

Impact

Western Australia

Upon making landfall, Christine produced heavy rainfall across a large section of the West Australian Pilbara. In Roebourne, a total of 134.2mm was recorded by a rain gauge before the instrument failed, while the maximum daily precipitation total of 168mm was observed in Abydos North. Additionally, Port Hedland recorded 123.2mm, Karratha 112.8mm, while thunderstorms along Christine's outer bands produced three-day totals of 181.8mm in Broome and 137.2mm in Lagrange Bay. All mining and shipping operations were cancelled in Port Hedland, however no actual damage to mining infrastructure was reported.[3] Roebourne and Wickham bore the brunt of Christine's winds, with a maximum confirmed gust of 172km/h recorded at Roebourne.[4] Both towns received significant damage and according to many local residents of Wickham, Christine was the worst cyclone in recent memory; several roofs were significantly damaged and many of the towns trees were uprooted and destroyed.[5] In Roebourne, roofs of many houses collapsed under the weight of water or were ripped off by wind gusts, while the whole town lost electricity for a short period.[5] Karratha and Port Hedland were spared any major damage, apart from minor flooding and wind-related damage. As Christine moved inland, flooding closed the Great Northern Highway north of Newman, however the town itself received 70km/h wind gusts and only 25mm of rain.

An estimated 3–4.5 tonnes of iron ore was lost in exports across the Pilbara region due to Christine. Mining operations and shipments were suspended for three days, though most of the facilities sustained only minor damage if any.[6] Despite the storm, Port Hedland reported a record monthly export of 29.9 million tonnes in December 2013, with 28.5 million tonnes being iron ore. This surpassed the previous record set in September 2013 by roughly 300,000 tonnes.[7]

Elsewhere

As the remnant low of Christine moved south-eastwards and into South Australia, it combined with a thermal low whipping up gusty winds and causing extreme heat across central Australia. Moomba recorded a maximum of on the 2 of January, almost beating its former record high set the year before.[8] 70km/h winds combined with the heat caused catastrophic fire dangers across the southern inland and a complete fire ban was issued for South Australia.[8] As the extreme heat moved east, temperatures of [9] were recorded in Birdsville, Queensland and in Walgett, New South Wales.[10] Further south however, Christine's remnants caused light showers and a cooler change in the Adelaide area, while isolated thunderstorms caused 42.8mm of rain to fall in Eucla, more than triple the areas monthly average.[11] Victoria and southern New South Wales also recorded light rain and a cooler change from Christine's remnants, with Melbourne reporting 4.8mm and maximum temperatures in the low 20 °C's during the New Years period.[12]

The name Christine was replaced with Catherine in 2014, but the name has not been confirmed as retired.

See also

References

Notes and References

  1. January 2014 . Western Australian Regional Office . https://web.archive.org/web/20150923194036/http://www.bom.gov.au/announcements/sevwx/wa/watc20131228.shtml . Australian Bureau of Meteorology . Severe Tropical Cyclone Christine . 26 October 2014 . 23 September 2015 . dead . dmy .
  2. Web site: Tropical Cyclone Advice Number 15 . Bureau of Meteorology . 28 December 2013 . unfit . https://web.archive.org/web/20150923220235/http://www.bom.gov.au/cgi-bin/wrap_fwo.pl?IDW24100.txt . 23 September 2015 .
  3. News: Cyclone Christine: Port Hedland miners count the cost . 3 January 2014 . 1 January 2013 . Sydney Morning Herald .
  4. Web site: Daily Summaries. Australian Bureau of Meteorology. 3 January 2014. 3 January 2014. Roebourne, Western Australia January 2014 Daily Weather Observations. https://web.archive.org/web/20140103175332/http://www.bom.gov.au/climate/dwo/201312/html/IDCJDW6117.201312.shtml. 3 January 2014. dead.
  5. News: Cyclone Christine tears through Western Australia's Pilbara, lifting roofs and felling trees . 3 January 2014 . 31 December 2013 . ABC News .
  6. News: Keith Tan. Platts SBB Steel Markets Daily. Cyclone Christine dents W. Australia ore exports. 1. 8. 2 January 2014.
  7. News: Paul Garvey. The Australian. 9 January 2014. Cyclone defied as port hits record high for ore exports. 14.
  8. News: Gusty change brings relief to SA's north after temperatures peaked at 49.3C . 3 January 2014 . 3 January 2013 . ABC News .
  9. Web site: Daily Summaries. Australian Bureau of Meteorology. 3 January 2014. 3 January 2014. Birdsville, Queensland January 2014 Daily Weather Observations.
  10. Web site: Daily Summaries. Australian Bureau of Meteorology. 3 January 2014. 3 January 2014. Walgett, New South Wales January 2014 Daily Weather Observations.
  11. Web site: Daily Summaries. Australian Bureau of Meteorology. 3 January 2014. 3 January 2014. Eucla, Western Australia January 2014 Daily Weather Observations.
  12. Web site: Daily Summaries. Australian Bureau of Meteorology. 6 January 2014. 6 January 2014. Melbourne, Victoria January 2014 Daily Weather Observations.