Cuiabá Light Rail Explained

Cuiabá Light Rail
Native Name:VLT de Cuiabá
Imagesize2:250px
Locale:Cuiabá, Mato Grosso, Brazil
Transit Type:Light rail
Lines:0 (2 planned)
Stations:0 (33 planned)
Ridership:120,000 (projected)
System Length:0 (22km (14miles) planned)

Cuiabá Light Rail (Portuguese: VLT de Cuiabá) is an unfinished light rail in the Brazilian city of Cuiabá, Mato Grosso. Work on the line has been suspended since 2015 due to suspicion of bidder fraud.[1] As of 2021, there is no intention to finish the construction and the system is to be replaced by BRT.[2]

The light rail system was designed to connect Cuiabá ("Centro Político Administrativo") with Cuiabá International Airport in the city of Várzea Grande.[3]

The spanish manufacturer CAF delivered 40 tramway cars of the Urbos series with seven elements. They are 44 meters long.[4]

Planned system

Cuiabá's Light Rail was planned to be 22km (14miles) in length,[5] operating on two lines:

LineTerminiLength (km)StationsStatus
1Airport ↔ Centro Político Administrativo (CPA)1522Under construction
2Centro ↔ Coxipó7.211Under construction

Notes and References

  1. Web site: Justiça Federal prorroga suspensão de obra do VLT na Grande Cuiabá. Portal G1. 16 May 2016. 16 February 2016. pt.
  2. Web site: 2020-12-21. Mato Grosso descarta VLT e terá BRT com ônibus elétricos e articulados entre Cuiabá e Várzea Grande. live. 2021-04-29. Diário do Transporte. pt-BR. https://web.archive.org/web/20210429201410/https://diariodotransporte.com.br/2020/12/21/mato-grosso-descarta-vlt-e-tera-brt-com-onibus-eletricos-e-articulados-entre-cuiaba-e-varzea-grande/ . 2021-04-29 .
  3. News: VLT deveria ser entregue nesta 5ª em Cuiabá mas previsão é só dezembro . G1 (Rede Globo) . Portuguese . VLT should be delivered in Cuiabá this Thursday but is expected only in December. 13 March 2014 . 2014-11-22.
  4. Web site: Rio tramway expands and explores surplus Cuiabá LRVs . 2024-01-07.
  5. News: Governo garante ao TCE conclusão de trecho do VLT de Cuiabá até maio . G1 (Rede Globo) . Portuguese . Government guarantees the completion of Cuiabá VLT's ECA stretch by May . 25 February 2014 . 2014-11-22.