Crookwell Wind Farm Explained

Crookwell Wind Farm
Coordinates:-34.5165°N 149.5425°W
Country:Australia
Location:Crookwell, New South Wales
Status:O
Commissioned:1998
Owner:Tilt Renewables
Ps Units Operational:8 × 600 kW
Ps Units Manu Model:Vestas V44-600kW
Wind Hub Height:45m (148feet)
Wind Rotor Diameter:44m (144feet)
Wind Farm Type:Onshore
Ps Electrical Capacity:4.8 MW
Ps Annual Generation:8 GWh
Website:https://www.tiltrenewables.com/assets-and-projects/Crookwell-Wind-Farm/

Crookwell Wind Farm, located at Crookwell west of Goulburn, New South Wales, consists of eight 600 kW wind turbines giving a total capacity of 4.8 MW. It was the first grid-connected wind farm in Australia when built by Pacific Power in 1998. It is now owned by Tilt Renewables.

The farm was the largest wind farm in Australia when built, with the energy produced bought and on-sold to customers by then energy retailer Great Southern Energy.

Crookwell 2

Phase two of the Crookwell Wind Farm, planned to have an installed capacity of 92 MW, is under construction since 2009.[1] [2] it was officially opened in November 2018.[3] [4] In 2017, a modification to the wind farm development was approved, allowing an increase in the hub height from 80m to 95m, blade size from 47 to 64m, rotor diameter from 96 to 130m and blade tip height from 128 to 160m.[5] It is expected to generate 300 GWh of energy per year, at a corresponding capacity factor of 36%.

Crookwell 2 Wind Farm
Coordinates:-34.5165°N 149.5425°W
Country:Australia
Location:Crookwell, New South Wales
Status:O
Commissioned:2018
Cost:A$200m
Wind Farm Type:Onshore
Wind Hub Height:95m (312feet)
Wind Rotor Diameter:130m (430feet)
Ps Units Operational:28 × 3.4 MW
Ps Units Manu Model:General Electric 3.4-130
Ps Electrical Capacity:95.2
Ps Electrical Cap Fac:35% (average 2019-2020)
Ps Annual Generation:291.1 GWh (average 2019-2020)

Operations

First generation started in August 2018, and reached full production in December 2018. The generation table uses eljmkt nemlog to obtain generation values for each month.

Crookwell 2 Wind Farm Generation (MWh)!Year!Total!Jan!Feb!Mar!Apr!May!Jun!Jul!Aug!Sep!Oct!Nov!Dec
201857,913N/AN/AN/AN/AN/AN/AN/A803*5,025*11,012*22,491*18,582
2019294,31821,45318,68122,15816,01623,79917,48831,28131,63828,28822,96033,66026,896
2020287,94022,29921,34819,84728,34623,42319,73119,79733,93130,16624,05120,22324,778
202124,39617,17727,57116,53221,36625,95533,42933,39031,876
Note: Asterisk indicates power output was limited during the month.

See also

External links

Notes and References

  1. Alan Copeland. Electricity Generation Major Development Projects -- October 2009 Listing , ABARE, November 2009, p. 9.
  2. http://www.crookwellgazette.com.au/story/178436/union-fenosa-wind-australia-announces-continuing-works-at-crookwell-2-wind-farm/ "Union Fenosa Wind Australia announces continuing works at Crookwell 2 wind farm"
  3. News: Crookwell 2 wind farm opens, in win for local farmers and ACT power prices . Sophie . Vorrath . 5 November 2018 . 5 June 2019.
  4. Web site: Wind farms in New South Wales: a page of Wind in the Bush. 2021-04-12. ramblingsdc.net.
  5. Web site: Crookwell2WindFarmModification‐2ApplicationDateLodged:26thAugust2016. live. https://web.archive.org/web/20210413003024/https://majorprojects.planningportal.nsw.gov.au/prweb/PRRestService/mp/01/getContent?AttachRef=DA176-9-2004-MOD-2!20191216T015839.291%20GMT . 13 April 2021 .