IND Eighth Avenue Line explained

IND Eighth Avenue Line
Type:Rapid transit
System:New York City Subway
Start:207th Street
End:South of High Street
Stations:31
Daily Ridership:523,267
Open:1932–1933
Owner:City of New York
Operator:New York City Transit Authority
Character:Underground
Linelength:[1]
Tracks:2–4
Electrification:600V DC third rail
Map State:collapsed

The IND Eighth Avenue Line is a rapid transit line in New York City, United States, and is part of the B Division of the New York City Subway. Opened in 1932, it was the first line of the Independent Subway System (IND); as such, New Yorkers originally applied the Eighth Avenue Subway name to the entire IND system.[2] [3] [4]

The line runs from 207th Street in Inwood south to an interlocking south of High Street in Brooklyn Heights, including large sections under St. Nicholas Avenue, Central Park West, and Eighth Avenue. The entire length is underground, though the 207th Street Yard, which branches off near the north end, is on the surface. Flying junctions are provided with the IND Concourse Line, IND Sixth Avenue Line, and IND Queens Boulevard Line.

Most of the line has four tracks, with one local and one express track in each direction, except for the extreme north and south ends, where only the two express tracks continue. Internally, the line is chained as Line "A", with tracks A1, A3, A4, and A2 from west to east,[5] running from approximately 800 at the south end[6] to 1540 at the north end (measured in hectofeet).

The whole line is served at all times by the A train, which runs express except during late nights. The C provides local service south of 168th Street while the A runs express. In addition, the B provides weekday local service and the D full-time express service between the Concourse Line (145th Street) and Sixth Avenue Line (59th Street–Columbus Circle) junctions, and the E runs local from the Queens Boulevard Line junction at 50th Street south to World Trade Center. The A, C, and E are colored on signs because they run via Eighth Avenue through Midtown Manhattan, while the B and D are since they use the Sixth Avenue Line through Midtown Manhattan.[7]

Extent and service

The following services use part or all of the Eighth Avenue Line. The trunk line's bullets are colored :

 Time periodSection of line
rush hours, middays,
and evenings
weekendslate nights
align=center colspan=2expresslocalentire line
localno servicesouth of 168 St
localbetween 50 St and WTC
localalign=center colspan=2no servicebetween 145 St and 59 St
align=center colspan=3expressbetween 145 St and 59 St

The Eighth Avenue Line begins as a two-track subway under Broadway at 207th Street in Inwood. A flying junction just to the south brings two tracks from the 207th Street Yard between the main tracks, merging after Dyckman Street. The subway leaves Broadway to pass under Fort Tryon Park to the north end of Fort Washington Avenue, which it follows to roughly 175th Street before turning southeast under private property.

The small 174th Street Yard lies under Broadway, with two tracks exiting to the south under that roadway. When the George Washington Bridge was designed in the 1920s, provisions were made for a lower deck that would carry these two tracks north from the yard and across the bridge, as well as two commuter rail tracks.[8] [9] However, when the lower level was added in 1962, it instead carried a roadway.

The two main tracks from Fort Washington Avenue enter Broadway near 172nd Street, curving and running underneath a public school (PS173M) at 174th Street, and other private property, and the yard tracks in a double-decker tunnel. A few blocks later, the lower tracks separate to straddle the yard tracks at 168th Street. The local/express split begins here, with the local tracks coming from the yard and the express tracks coming from Inwood. Contrary to standard practice, the two local tracks are in the center and the two express tracks are on the outside. Except during late nights, the local service (C) ends at 168th Street, reversing direction on the yard tracks; the A runs to 207th Street at all times, express except during late nights. South of 168th Street, the express (outer) tracks lower below the local tracks, forming another double-decker tunnel, this time under St. Nicholas Avenue.

North of 145th Street, the lower (express) tracks rise into the center, and the three-track IND Concourse Line enters St. Nicholas Avenue below the four-track Eighth Avenue Line. 145th Street is a two-level transfer station, with two island platforms on each level. To the south, the Concourse Line tracks rise and merge with the Eighth Avenue Line, carrying the B onto the local tracks and the D onto the express tracks. The resulting four-track line continues south under St. Nicholas Avenue and Eighth Avenue (Frederick Douglass Boulevard), which becomes Central Park West at 110th Street.

Most of the line under Central Park West is built on two levels with both local tracks to the west and only local stations. The two northbound tracks are above the two southbound tracks. Approaching 59th Street–Columbus Circle, where Central Park West becomes Eighth Avenue, the subway again spreads out into a single four-track level.

A flying junction south of 59th Street takes B and D trains east under 53rd Street, merging with two tracks from 57th Street to become the four-track IND Sixth Avenue Line. The two-track IND Queens Boulevard Line, also in 53rd Street, curves south into a lower level of the 50th Street station, and merges to the south, taking E trains onto the local tracks. An unused southbound-only lower level at 42nd Street–Port Authority Bus Terminal was formerly accessed only from the southbound track from the Queens Boulevard Line. Plans for the 7 Subway Extension required partially demolishing the lower level to make room for the new IRT Flushing Line tracks.

The four-track line continues south under Eighth Avenue to 14th Street, where it turns southeast under Greenwich Avenue and south under Sixth Avenue, above the four-track IND Sixth Avenue Line. The two-level West Fourth Street–Washington Square station allows easy transfers between the two lines. Just to the south are track connections between the local tracks of each line, not used by current normal service patterns. The Sixth Avenue Line turns east into Houston Street after passing the connections.

Canal Street, under Sixth Avenue, is the last normal four-track station on the line. Crossovers in each direction, beyond the station, take C and late night A trains between the local tracks to the north and the express tracks to the south. As the subway turns from Sixth Avenue into Church Street, the southbound local track passes under the express tracks, bringing E trains to the east. At this point, a bellmouth originally intended for the never-built IND Worth Street Line is present on the east side of the tunnel.[10] [11] It has been proposed to use this to bring Long Island Rail Road Atlantic Branch trains to Lower Manhattan as part of the Lower Manhattan-Jamaica/JFK Transportation Project.[12]

The four tracks continue south under Church Street, with two separate but connected stations at World Trade Center at the end of the local tracks and Chambers Street on the express tracks. The two express tracks turn east under Fulton Street, crossing the East River through the Cranberry Street Tunnel into Cranberry Street in Brooklyn. Cranberry Street leads to High Street, from which the line turns south into Jay Street, straddled by the two-track IND Sixth Avenue Line from the Rutgers Street Tunnel. The Eighth and Sixth Avenue Lines end, becoming the IND Fulton Street Line and IND Culver Line, at crossovers (currently unused) allowing trains to switch between the two, located between High Street and Jay Street–MetroTech. Both the A and C trains continue along the Fulton Street Line.

History

Planning and construction

As early as March 1918, soon after the BMT Broadway Line opened to Times Square–42nd Street, plans were being considered for an extension of that line beyond the stubs at 57th Street–Seventh Avenue to the Upper West Side and Washington Heights via Central Park West (Eighth Avenue).[13] On August 3, 1923, the New York City Board of Estimate approved the Washington Heights Line, an extension of the Broadway Line to Washington Heights. The line was to have four tracks from Central Park West at 64th Street under Central Park West, Eighth Avenue, Saint Nicholas Avenue, and private property to 173rd Street, and two tracks under Fort Washington Avenue to 193rd Street. South of 64th Street, one two-track line would connect to the Broadway Line stubs at 57th Street, and another would continue under Eighth Avenue to 30th Street at Penn Station, with provisions to continue downtown.[14] [15]

Mayor John Hylan instead wanted to build an independent subway system, operated by the city. The New York City Board of Transportation (NYCBOT) gave preliminary approval to several lines in Manhattan, including one on Eighth Avenue, on December 9, 1924. The main portion of the already-approved Washington Heights Line—the mostly-four track line north of 64th Street—was included, but was to continue north from 193rd Street to 207th Street. South of 64th Street, the plan called for four tracks in Eighth Avenue, Greenwich Avenue, the planned extension of Sixth Avenue, and Church Street. Two tracks would turn east under Fulton Street or Wall Street and under the East River to Downtown Brooklyn.[16]

A groundbreaking ceremony was held at St. Nicholas Avenue and 123rd Street on March 14, 1925.[17] Most of the Eighth Avenue Line was dug using a cheap cut-and-cover method, where the street above was excavated. Still, the construction of the line was difficult, as it had to go under or over several subway lines. At 59th Street–Columbus Circle, workers had to be careful to not disrupt the existing IRT Broadway–Seventh Avenue Line overhead. 42nd Street, the longest station along the line at 1115feet, was expected to be a major express station with large platforms, so the platforms were staggered away from each other in order to avoid going under property lines. Additionally, several workers died in cave-ins during construction.[18]

In the summer of 1926 the BOT held a public hearing and agreed upon the details of the construction of the subway line under Church Street. As part of the construction of the line, Church Street was widened from being 40feet wide to being 90feet wide to accommodate the subway underneath and was connected with a southern diagonal extension of Sixth Avenue, which was 100feet. Had the street not been widened the construction would have cost an additional $7 million for the construction of a two-level subway structure. In January 1929, the city paid money awarded to adjacent property owners for property taken and awarded contracts for 15feet-wide sidewalks and a 60feet-wide roadway. The sidewalks had been 10feet wide and the roadway had been 20feet wide. New buildings were built on the west sides of Church Street. The east side of the street was not affected by the construction. $9,631,760 was awarded to 161 property owners whose property had been taken.[19] 168,888 square feet of land had to be acquired to widen Church Street between Park Place and Canal Street.[20]

In 1926 construction began on the extension of Sixth Avenue south from Carmine Street to Canal Street, to allow for the construction of the Eighth Avenue Line (which runs under the street south of Eighth Street), and to provide access to the Holland Tunnel.[21] [22] The construction of the extension was completed in 1930.[23] The city condemned entire lots, displacing 10,000 people,[24] to build the extension and used leftover land for parks.

The stations on the line were built with 600feet long platforms, but they had provisions to lengthen them to 660feet to accommodate eleven-car trains.[25] Four of the express stations (at Fulton, 14th, 42nd, and 59th Streets) were built with long mezzanines so that passengers could walk the entire length of the mezzanines without having to pay a fare. It was proposed to develop the mezzanines of these four stations with shops, so that they would become retail corridors, similar to the underground mall of the under-construction Rockefeller Center. The new subway required 800 cars and 1,500 staff. In June 1932, The New York Times reported that seven-car express trains would run between 168th and Chambers Streets, while five-car local trains would run between 207th and Chambers Streets. Both express and local trains would run at intervals of four to twelve minutes depending on the time of day.[26] The new IND subway line also used a five-color pattern of tiles to facilitate navigation for travelers going away from Manhattan; the colors of the tiles changed at each express station.[27]

Early operation

The majority of the Eighth Avenue Line, from Chambers Street north to 207th Street, was opened to the public just after midnight on September 10, 1932, after three days of operation on a normal schedule but without passengers.[28] The Cranberry Street Tunnel, extending the express tracks east under Fulton Street to Jay Street–Borough Hall in Brooklyn, was opened for the morning rush hour on February 1, 1933,[29] with the exception of the station at High Street, which opened on June 24, 1933. Initially, only the Fulton Street entrance was open; the Adams Street entrance would open later once its escalators were completed. The Jay–Smith–Ninth Street Line opened on March 20, 1933, extending the line beyond Jay Street–Borough Hall.[30]

When the subway opened in 1932, express (A) and local (AA) trains served the line; expresses did not run during late nights or Sundays. Expresses and late night/Sunday locals were sent south into Brooklyn on February 1, 1933, and, when the IND Concourse Line opened on July 1, 1933,[31] the C was added to the express service, while all locals became CC trains to the Concourse Line, forcing A trains to run local north of 145th Street.[32] The E was added to the local tracks south of 50th Street on August 19, 1933, when the IND Queens Boulevard Line opened.[33]

The final major change came on December 15, 1940, when the IND Sixth Avenue Line opened. The AA was brought back as a non-rush hour local service, becoming the BB and switching to the Sixth Avenue Line at 59th Street–Columbus Circle during rush hours. The CC was kept only during rush hours to provide local service south past 59th Street. Additionally the C became a rush hour-only service, replaced by a full-time D over the express tracks between the Concourse and Sixth Avenue Lines.[34] This created the pattern that has remained to this day, with five services during normal hours: the A express, B part-time local via Sixth Avenue (then BB), C local (then AA and CC), D express via Sixth Avenue, and E local from Queens.

Later years

In 1953, the platforms were lengthened at Spring Street and Canal Street to 660feet to allow E trains to run eleven-car trains. The E began running eleven-car trains during rush hours on September 8, 1953. The extra train car increased the total carrying capacity by 4,000 passengers. The lengthening project cost $400,000.[35]

Southbound E trains began stopping at the lower level of the 42nd Street station during rush hours on March 23, 1970, to reduce delays by relieving congestion on the station's platforms.[36] [37]

On August 28, 1977, late night AA service was eliminated. The A began making local stops in Manhattan during late nights, when the AA was not running.[38] On May 6, 1985, the IND practice of using double letters to indicate local service was discontinued. The AA was renamed the K and rush hour CC service was renamed C.[39] [40] This change was not officially reflected in schedules until May 24, 1987.[41]

On December 10, 1988, the K designation was discontinued and merged into the C, which now ran at all times except late nights.[42] The C ran from Bedford Park Boulevard to Rockaway Park during rush hours, 145th Street to Euclid Avenue during middays, and from 145th Street to World Trade Center during evenings and weekends. The A now ran express in Brooklyn during middays, and the B was extended to 168th Street during middays and early evenings.[43]

On May 29, 1994, weekend C service between 7 a.m. and 11 p.m. was extended to 168th Street to allow A trains to run express.[44] Beginning April 30, 1995, C service was extended to 168th Street during middays as construction on the Manhattan Bridge cut B service from Manhattan. On November 11, 1995, midday service was cut back to 145th Street after B service to 168th Street was restored.[45] The change was made to reduce crowding on the C and to reduce passenger confusion about the C's route.[46]

The B and the C, which both ran local along Central Park West, switched northern terminals on March 1, 1998, ending the connection between the C and the Bronx. Instead of alternating between three different terminals depending on the time of day, all C service now terminated at 168th Street.[47] [48]

A report for the Lower Manhattan Development Corporation looking at the Lower Manhattan Rail Link, an idea to connect Lower Manhattan with the Long Island Rail Road and JFK International Airport, presented several alternatives that would utilize the Cranberry Street Tunnel instead of building a new East River Tunnel. These alternatives would have required that C trains be rerouted through the Rutgers Street Tunnel.[49]

In the wake of the September 11, 2001 attacks, World Trade Center station was temporarily unusable as a terminal for the E. C service was suspended until September 24, 2001. Local service along Central Park West was replaced by the A and D, and the E was extended from Canal Street to Euclid Avenue replacing C service in Brooklyn.[50] [51]

On January 23, 2005, a fire at the Chambers Street signal room crippled A and C service. C service was suspended until February 2 and was replaced by the A, B, D, E, and V trains along different parts of its route. Initial assessments suggested that it would take several years to restore normal service, but the damaged equipment was replaced with available spare parts, and normal service resumed on April 21.[52]

The 2015–2019 Metropolitan Transportation Authority Capital Plan called for five of the Eighth Avenue Line's stations, along with 28 others, to undergo a complete overhaul as part of the Enhanced Station Initiative. The stations receiving renovations are 34th Street–Penn Station, 72nd Street, 86th Street, Cathedral Parkway–110th Street, and 163rd Street–Amsterdam Avenue. Updates included cellular service, Wi-Fi, USB charging stations, interactive service advisories and maps, improved signage, and improved station lighting.[53] [54] [55] As part of the renovations, 72nd Street was closed from May 7, 2018 to October 4, 2018,[56] and 86th Street was closed from June 4, 2018 to October 26, 2018.[57] In addition, the Cathedral Parkway–110th Street station was closed from April 9, 2018 to the week of September 2–4, 2018,[58] and 163rd Street was closed from March 12, 2018 to September 27, 2018.[59]

IND Worth Street Line

The IND Worth Street Line was a proposed major expansion of the IND Eighth Avenue Line. The line would have branched off of the line's local tracks at the intersection of Church Street and Franklin Street to the south of the Canal Street station and would have turned southeast into Worth Street. This route would have traveled in a two-track tunnel. It would have probably stopped at Foley Square (Lafayette and Centre Streets, on the north side of Federal Plaza), Chatham Square (with a possible connection to the Second Avenue Subway), Rutgers Street–East Broadway (with a connection to the IND Rutgers Street Line), and a station in the Lower East Side (possibly Pitt Street and Grand Street). This portion would have been about 1.95miles long and would have cost about $13 million. Crossing to Williamsburg, the line was to have stops at Havemeyer Street and Union Avenue, the latter of which would have had connections to the IND Crosstown Line and a major junction to the IND Houston Street Line, the IND Utica Avenue Line, and a connection to the Rockaways.[60]

In March 1930, public hearings were held by the BOT concerning the construction and planning of this line.[61] At the March 12 hearing, the project's construction was endorsed by east side civic organizations.[62] In June 1930, the Board of Estimate approved the construction of the line, and in July Chairman Delaney sent letters to 450 real estate owners outlining the planned route and requested their consent for the construction of the project, of which the Board needed 50%.[63] On August 23, 1930, bids on the construction of the connection (bellmouths) between the Eighth Avenue Line and the proposed Worth Street Line were put up for bid by the Board of Transportation. These bellmouths were constructed to allow work on the Worth Street Line to be done without interrupting service on the Eighth Avenue Line. This route was expected to the first line of the IND Second System to be built. At the time it was anticipated that the line would open a year or so after the completion of the Eighth Avenue Line under the East River to Brooklyn.[64] However, the construction of the line was delayed due to the city's lack of funding after 1932. The Board of Transportation resumed efforts to build the line after a study of existing conditions in the area was completed, and on the basis that funding would be provided from government and private sources. The plans were truncated to a three-stop crosstown line entirely within Manhattan. Stops would have been located at Foley Square, Rutgers Street, and Lewis Street. The Lewis Street stop, located in the Lower East Side, would have been the line's terminal. Construction was expected to begin in 1937 and be complete by 1944.[65] In 1938 the cost of the line was pegged by the BOT to be $16.73 million.[66]

Even though these bellmouths were never used and the line was never completed, the bellmouths are still visible south of Canal Street adjacent to the local tracks. Other provisions were built in anticipation of the construction of the line. A large open space above the platform level at the East Broadway station on the Sixth Avenue Line was intended to become a two-track station. Above the tunnel north of the Broadway station on the Crosstown Line, a six-track station shell was partially completed. This station would have provided service to the IND Worth Street and the Houston Street Lines.[67]

Station listing

Neighborhood
(approximate)
StationTracksServicesOpenedTransfers and notes
align=center colspan=7 Manhattan
Inwoodalign=center expressnowrapSeptember 10, 1932Bx12 Select Bus Service
crossovers to connecting tracks to 207th Street Yard
expressSeptember 10, 1932
connecting tracks to 207th Street Yard merge
Washington Heightsalign=center expressSeptember 10, 1932
align=center expressSeptember 10, 1932
align=center expressSeptember 10, 1932George Washington Bridge Bus Station
Local tracks begin in 174th Street Yard
align=center allSeptember 10, 1932IRT Broadway–Seventh Avenue Line
localSeptember 10, 1932
localSeptember 10, 1932Bx6 Select Bus Service
HarlemallSeptember 10, 1932IND Concourse Line
IND Concourse Line joins
localSeptember 10, 1932
align=center allSeptember 10, 1932M60 Select Bus Service to LaGuardia Airport
localSeptember 10, 1932
Upper West SidelocalSeptember 10, 1932
localSeptember 10, 1932
localSeptember 10, 1932
localSeptember 10, 1932M86 Select Bus Service
localSeptember 10, 1932M79 Select Bus Service
localSeptember 10, 1932
Midtownalign=center allSeptember 10, 1932IRT Broadway–Seventh Avenue Line
IND Sixth Avenue Line splits
 ↓localSeptember 10, 1932IND Queens Boulevard Line
Accessible southbound only
IND Queens Boulevard Line joins
align=center allSeptember 10, 1932IRT Broadway–Seventh Avenue Line
IRT Flushing Line
IRT 42nd Street Shuttle
BMT Broadway Line at Times Square–42nd Street
IND Sixth Avenue Line at, daytime only
Port Authority Bus Terminal
M34A Select Bus Service
align=center allSeptember 10, 1932Penn Station

Amtrak, Long Island Rail Road, and New Jersey Transit
M34/M34A Select Bus Service

ChelsealocalSeptember 10, 1932M23 Select Bus Service
align=center allSeptember 10, 1932BMT Canarsie Line at
Greenwich Villagealign=center allSeptember 10, 1932IND Sixth Avenue Line
Connection to PATH at
local crossovers to/from IND Sixth Avenue Line (no regular service)
Hudson SquarelocalSeptember 10, 1932
TriBeCaallSeptember 10, 1932
Financial Districtalign=center expressSeptember 10, 1932two parts of the same station; local tracks end
BMT Broadway Line at
IRT Broadway–Seventh Avenue Line at
Connection to PATH at
align=center localSeptember 10, 1932
Local tracks end
align=center expressFebruary 1, 1933formerly Broadway–Nassau Street
IRT Broadway–Seventh Avenue Line
BMT Nassau Street Line
IRT Lexington Avenue Line
Connection to PATH at
align=center colspan=7 Brooklyn
continues through the Cranberry Street Tunnel
Brooklyn HeightsexpressJune 24, 1933[68] This section of line opened on February 1, 1933; the station opened later.
Continues as the IND Fulton Street Line, with crossovers to/from the IND Culver Line (no regular service)

External links

Notes and References

  1. News: New Subway Link Opens Wednesday. New York Times. January 29, 1933. 3. July 22, 2018. December 16, 2022. https://web.archive.org/web/20221216145354/https://www.nytimes.com/1933/01/29/archives/new-subway-link-opens-wednesday-independent-line-will-offer-express.html. live.
  2. News: Old Jamaica Farm Divided for Homes. October 8, 1939. The New York Times. June 29, 2018. 153. June 30, 2018. https://web.archive.org/web/20180630000414/https://www.nytimes.com/1939/10/08/archives/old-jamaica-farm-divided-for-homes-builders-will-open-initial-group.html. live.

    "the property is near the Woodhaven Boulevard station of the Eighth Avenue subway"

  3. News: Delaney Assails Transit Sitdowns. January 31, 1943. The New York Times. June 29, 2018. 26. April 29, 2014. https://web.archive.org/web/20140429050321/http://select.nytimes.com/gst/abstract.html?res=FA0B14FD3C581B7B93C3AA178AD85F478485F9. live.

    "the Jamaica inspection barn of the Eighth Avenue Subway System, in Kew Gardens, Queens"

  4. Book: Kramer, Frederick A.. Building the Independent Subway. January 1, 1990. Quadrant Press. 9780915276509. en.
  5. New York City Transit Authority Maintenance of Way Department. General Signal Arrangement, Sta. 943+00 to Sta. 971+50. November 15, 1968. April 19, 2007. https://web.archive.org/web/20070926085645/http://images.nycsubway.org/pdf/sixthave-west4th.pdf. September 26, 2007.
  6. Web site: Abandoned Stations: Court St, and Hoyt-Schermerhorn Sts platforms. Brennan. Joseph. 2002. Abandoned Stations. April 19, 2007. January 17, 2019. https://web.archive.org/web/20190117232311/http://www.columbia.edu/~brennan/abandoned/court.html. live.
  7. News: Take the Tomato 2 Stops to the Sunflower. Grynbaum. Michael M.. City Room. May 10, 2010 . November 6, 2016. December 17, 2017. https://web.archive.org/web/20171217014649/https://cityroom.blogs.nytimes.com/2010/05/10/take-the-tomato-to-the-sunflower/?_r=0. live.
  8. News: Addition to Bridge Upheld. Tobin. Austin J.. May 10, 1960. The New York Times. June 29, 2018. 36. Austin J. Tobin. June 29, 2018. https://web.archive.org/web/20180629235915/https://www.nytimes.com/1960/05/10/archives/addition-to-bridge-upheld-building-of-second-deck-on-george.html. live.
  9. News: Across the Hudson by Rapid Transit. January 30, 1984. The New York Times. June 29, 2018. A16.
  10. News: 100 Miles of Subway in New City Project. September 16, 1929. The New York Times. June 29, 2018. 1. 0362-4331. June 27, 2018. https://web.archive.org/web/20180627210909/https://www.nytimes.com/1929/09/16/archives/100-miles-of-subway-in-new-city-project-52-of-them-in-queens.html. live.
  11. New York City Board of Transportation. File No. 72, Drawing No. 58: Proposed Additional Rapid Transit Lines and Proposed Vehicular Tunnels. August 23, 1929.
  12. Web site: Metropolitan Transportation Authority. Draft Long List of Alternatives. https://web.archive.org/web/20110805201335/http://www.mta.info/mta/planning/lmlink/documents/lm_longlist.pdf. August 5, 2011. October 2005. December 26, 2013.
  13. News: Plan a New Subway on Upper West Side. March 3, 1918. The New York Times. June 29, 2018. 27. 0362-4331. June 14, 2010. https://web.archive.org/web/20100614203951/http://www.nycsubway.org/articles/nytimes-1918-broadway.html. live.
  14. News: Two Subway Routes Adopted by City. August 4, 1923. The New York Times. June 29, 2018. 9. 0362-4331. June 30, 2019. https://web.archive.org/web/20190630012122/https://www.nytimes.com/1923/08/04/archives/two-subway-routes-adopted-by-city-estimate-board-accepts-wash.html. live.
  15. News: Plans Now Ready to Start Subways. March 12, 1924. The New York Times. June 29, 2018. 1. 0362-4331. June 28, 2019. https://web.archive.org/web/20190628162149/https://www.nytimes.com/1924/03/12/archives/plans-now-ready-to-start-subways-commission-notifies-city-it-can.html. live.
  16. News: Hylan Subway Plan Links Four Boroughs at $450,000,000 Cost. December 10, 1924. The New York Times. June 29, 2018. 1. 0362-4331. June 14, 2018. https://web.archive.org/web/20180614021251/https://www.nytimes.com/1924/12/10/archives/hylan-subway-plan-links-four-boroughs-at-450000000-cost-manhattan.html. live.
  17. News: Will Break Ground Today for New Uptown Subway. March 14, 1925. The New York Times. June 29, 2018. 15. 0362-4331. June 14, 2018. https://web.archive.org/web/20180614021410/https://www.nytimes.com/1925/03/14/archives/englandaustralia-air-route-via-america-seen-in-3-years.html. live.
  18. News: The City's New Underground Province; The Eighth Avenue Subway Will Be Not Only a Transit Line but a Centre for the Shopper A New Underground Province of New York The Eighth Avenue Subway Will Be a Rapid Transit Line With Innovations and Will Provide Centres for the Shoppers. Warner. Arthur. November 22, 1931. The New York Times. 0362-4331. May 2, 2018. May 3, 2018. https://web.archive.org/web/20180503050550/https://www.nytimes.com/1931/11/22/archives/the-citys-new-underground-province-the-eighth-avenue-subway-will-be.html. live.
  19. News: $9,631,760 Awarded On Church Street; Payment Made to 161 Owners for Subway and Road-Widening Improvements. Transforming Old Centre Realty Enhanced and Modern Buildings Are Replacing Ancient Structures. Realty Values Increase. To Cost $14,000,000.. January 6, 1929. The New York Times. June 28, 2018. en. 0362-4331. August 15, 2019. https://web.archive.org/web/20190815002908/https://www.nytimes.com/1929/01/06/archives/9631760-awarded-on-church-street-payment-made-to-161-owners-for.html. live.
  20. News: Transit Board Land Ceded To Boroughs; New Street Areas, Valued at $10,000,000, Are in Manhattan, Brooklyn and the Bronx. Acquired In Condemnation Widening of Thoroughfares for Subways Also Has Increased Real Estate Values.. January 28, 1932. The New York Times. June 28, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628044638/https://www.nytimes.com/1932/01/28/archives/transit-board-land-ceded-to-boroughs-new-street-areas-valued-at.html. live.
  21. Web site: DEEP SIXTH: a walk up Avenue of the Americas - Forgotten New York. Walsh. Kevin. forgotten-ny.com. April 15, 2003. en-US. May 14, 2018. May 15, 2018. https://web.archive.org/web/20180515043916/http://forgotten-ny.com/2003/04/deep-sixth-a-walk-up-avenue-of-the-americas/. live.
  22. News: Traffic Now Forces Huge Street Cutting; Sixth Avenue Extension to Focal Point on Canal, Street Is Perhaps the Most Extraordinary of Its Kind in the Entire History of New York City. Adams. Mildred. September 19, 1926. The New York Times. May 15, 2018. en-US. 0362-4331. October 23, 2019. https://web.archive.org/web/20191023134716/https://www.nytimes.com/1926/09/19/archives/traffic-now-forces-huge-street-cutting-sixth-avenue-extension-to.html. live.
  23. News: To Open 6th Av. Extension; Walker and Miller to Take Part in Ceremony Today.. September 18, 1930. The New York Times. May 15, 2018. en-US. 0362-4331. May 15, 2018. https://web.archive.org/web/20180515114053/https://www.nytimes.com/1930/09/18/archives/to-open-6th-av-extension-walker-and-miller-to-take-part-in-ceremony.html. live.
  24. News: 10,000 Must Leave Condemned Houses; City's Order to Persons in Path of Sixth Av. Extension Comes as Surprise to Many. Last Day of Grace Aug. 31 Razing of Buildings In Greenwich Village Prepares Traffic Artery for Holland Tunnel.. July 29, 1926. The New York Times. May 15, 2018. en-US. 0362-4331. May 10, 2018. https://web.archive.org/web/20180510050833/https://www.nytimes.com/1926/07/29/archives/10000-must-leave-condemned-houses-citys-order-to-persons-in-path-of.html. live.
  25. Book: Transit Journal. 1932. McGraw-Hill Publishing Company, Incorporated. en.
  26. News: Copeland. George H.. 1932-06-19. The City's New Subway Line Promises Speed and Comfort; Innovations to Be Found in the Eighth Avenue System; How It Fits Into the Rapid Transit Scheme, and the Expected Revenues. en-US. The New York Times. 2022-07-01. 0362-4331. July 1, 2022. https://web.archive.org/web/20220701184231/https://www.nytimes.com/1932/06/19/archives/the-citys-new-subway-line-promises-speed-and-comfort-innovations-to.html. live.
  27. News: 1932-08-22. Tile Colors a Guide in the New Subway; Decoration Scheme Changes at Each Express Stop to Tell Riders Where They Are. en-US. The New York Times. 2022-07-01. 0362-4331. July 1, 2022. https://web.archive.org/web/20220701184626/https://www.nytimes.com/1932/08/22/archives/tile-colors-a-guide-in-the-new-subway-decoration-scheme-changes-at.html. live.
  28. News: Gay Midnight Crowd Rides First Trains in New Subway. September 10, 1932. The New York Times. June 29, 2018. 1. 0362-4331. September 12, 2012. https://web.archive.org/web/20120912162150/http://select.nytimes.com/gst/abstract.html?res=FA0D13F7395513738DDDA90994D1405B828FF1D3. live.
  29. News: City Opens Subway to Brooklyn Today. February 1, 1933. The New York Times. June 29, 2018. 19. 0362-4331. June 26, 2018. https://web.archive.org/web/20180626194044/https://www.nytimes.com/1933/02/01/archives/city-opens-subway-to-brooklyn-today-regular-express-service-on-the.html. live.
  30. News: City Subway Adds a New Link Today. March 20, 1933. The New York Times. June 29, 2018. 17. 0362-4331. June 27, 2018. https://web.archive.org/web/20180627014126/https://www.nytimes.com/1933/03/20/archives/city-subway-adds-a-new-link-today-service-to-be-extended-halfmile.html. live.
  31. News: New Bronx Subway Starts Operation. July 1, 1933. The New York Times. June 29, 2018. 15. 0362-4331. March 26, 2020. https://web.archive.org/web/20200326095048/https://www.nytimes.com/1933/07/01/archives/new-bronx-subway-starts-operation-40000000-branch-of-city-system.html. live.
  32. New York City Board of Transportation. Station Guide, Independent City Owned Rapid Transit Railroad. c. 1937. April 18, 2007. October 23, 2012. https://web.archive.org/web/20121023002151/http://images.nycsubway.org/maps/ind_1937.pdf. live.
  33. News: Two Subway Units Open at Midnight. August 18, 1933. The New York Times. June 29, 2018. 17. 0362-4331. June 27, 2018. https://web.archive.org/web/20180627013040/https://www.nytimes.com/1933/08/18/archives/two-subway-units-open-at-midnight-links-in-cityowned-system-in.html. live.
  34. News: 6th Ave. Tube Adds Two New Services. December 5, 1940. The New York Times. June 29, 2018. 27. 0362-4331. June 17, 2018. https://web.archive.org/web/20180617194705/https://www.nytimes.com/1940/12/05/archives/6th-ave-tube-adds-two-new-services-provides-express-facilities-to.html. live.
  35. News: 2 Subway Lines to Add Cars, Another to Speed Up Service. Ingalls. Leonard. August 28, 1953. New York Times. January 25, 2016. 0362-4331. July 2, 2022. https://web.archive.org/web/20220702214634/https://timesmachine.nytimes.com/timesmachine/1953/08/28/83735052.html?pdf_redirect=true&site=false. live.
  36. News: March 21, 1970. E Trains to Stop On Lower Level. 207. New York Daily News. May 24, 2020.
  37. Web site: Another Transit Improvement... E Train Riders 42nd Street Station . Wikimedia Commons . New York City Transit Authority . 1970.
  38. Web site: Service Adjustments on the BMT and IND Lines Effective Midnight, Saturday, August 27. 1977. New York City Transit Authority. Flickr. June 9, 2016. September 15, 2016. https://web.archive.org/web/20160915071754/https://www.flickr.com/photos/127872292%40N06/27461551962/. live.
  39. Web site: IND Subway Services. Korman. Joseph. ERA NY Division Bulletins October and November 1968. thejoekorner.com. October 7, 2018. November 22, 2019. https://web.archive.org/web/20191122080736/http://www.thejoekorner.com/lines/Indhistory.htm. live.
  40. Web site: Hey, What's a "K" train? 1985 Brochure. 1985. New York City Transit Authority. Flickr. June 17, 2016. September 15, 2016. https://web.archive.org/web/20160915071759/https://www.flickr.com/photos/127872292%40N06/27733842265/. live.
  41. News: Big Changes For Subways Are to Begin. Johnson. Kirk. December 9, 1988. The New York Times. June 6, 2016. 0362-4331. March 8, 2021. https://web.archive.org/web/20210308122331/https://www.nytimes.com/1988/12/09/nyregion/big-changes-for-subways-are-to-begin.html. live.
  42. Book: Annual Report on ... Rapid Routes Schedules and Service Planning. 1989. New York City Transit Authority. en. March 25, 2018. https://web.archive.org/web/20180731182400/https://books.google.com/books?id=_5hq0ippLSwC&q=Manhattan+Bridge&dq=%221983%22+%22new+york+city+transit%22+brooklyn+service+change&source=gbs_word_cloud_r&cad=4. July 31, 2018. live. mdy-all. 17.
  43. Web site: System-Wide Changes In Subway Service Effective Sunday, December 11, 1988. 1988. New York City Transit Authority. Flickr. June 17, 2016. September 15, 2016. https://web.archive.org/web/20160915071757/https://www.flickr.com/photos/127872292@N06/27699872706/. live.
  44. Web site: May 1994 Subway Map. May 1994. New York City Transit. en-us. Flickr. October 7, 2018. April 4, 2023. https://web.archive.org/web/20230404211507/https://www.flickr.com/photos/127872292@N06/16543351666/in/album-72157652636594213/. live.
  45. Web site: March 1, 1998 B C Routes are switching places above 145 St. March 1998. New York City Transit. Flickr. October 23, 2016. January 5, 2017. https://web.archive.org/web/20170105070321/https://www.flickr.com/photos/127872292@N06/30425279591/. live.
  46. News: Changes in B & C service. February 24, 1998. New York Daily News. March 29, 2019. March 29, 2019. https://web.archive.org/web/20190329222603/https://www.newspapers.com/clip/22796445/b_and_c_service_change_1998/. live.
  47. Web site: March 1, 1998 B C Routes are switching places above 145 St. March 1998. Flickr. New York City Transit. October 23, 2016. https://web.archive.org/web/20170105070321/https://www.flickr.com/photos/127872292@N06/30425279591/. January 5, 2017. live. mdy-all.
  48. News: The B and C routes will switch places above 145th Street beginning March 1. February 23, 1998. New York Daily News. March 29, 2019. March 29, 2019. https://web.archive.org/web/20190329222544/https://www.newspapers.com/clip/22800206/b_c_swap/. live.
  49. Web site: Lower Manhattan Airport and Commuter Access Alternatives Analysis . March 19, 2008 . . 2004 . https://web.archive.org/web/20150924090025/http://www.renewnyc.com/plan_des_dev/transportation/pdf/Final_Report.pdf . September 24, 2015 .
  50. Web site: 9/11 Service Changes. 11 September 2007. Second Ave. Sagas. 26 June 2019. August 2, 2019. https://web.archive.org/web/20190802033701/http://secondavenuesagas.com/2007/09/11/the-view-from-underground-911-services-changes/. live.
  51. Web site: Map of 9/11 service changes. nycsubway.org. 26 June 2019. June 27, 2020. https://web.archive.org/web/20200627043508/https://www.nycsubway.org/perl/caption.pl?/img/maps/calcagno-2001-09-17.gif. live.
  52. News: 2 Subway Lines Crippled by Fire; Long Repair Seen. Chan. Sewell. January 25, 2005. The New York Times. October 7, 2018. 0362-4331. August 12, 2014. https://web.archive.org/web/20140812195928/http://www.nytimes.com/2005/01/25/nyregion/25subway.html. live.
  53. Web site: Whitford. Emma. January 8, 2016. MTA Will Completely Close 30 Subway Stations For Months-Long "Revamp" . Gothamist. July 18, 2016. https://web.archive.org/web/20160801200338/http://gothamist.com/2016/01/08/subway_facelift_shutdown.php. August 1, 2016. mdy-all.
  54. Web site: MTAStations. governor.ny.gov. Government of the State of New York. July 18, 2016. November 2, 2019. https://web.archive.org/web/20191102093442/https://www.governor.ny.gov/sites/governor.ny.gov/files/atoms/files/MTAStations.pdf. live.
  55. Web site: Enhanced Station Initiative: CCM Pre-Proposal Conference. October 25, 2016. Metropolitan Transportation Authority. 8 (PDF page 15). August 11, 2017. August 12, 2017. https://web.archive.org/web/20170812060517/http://web.mta.info/nyct/procure/contracts/143675sol-3.pdf. live.
  56. Web site: 72 St BC Station Reopens After Major Repairs to Steel and Concrete Structure, Functional Improvements. October 4, 2018. mta.info. Metropolitan Transportation Authority. October 4, 2018. October 4, 2018. https://web.archive.org/web/20181004185040/http://www.mta.info/press-release/nyc-transit/72-st-bc-station-reopens-after-major-repairs-steel-and-concrete-structure. live.
  57. Web site: MTA will shutter 4 Upper Manhattan subway stations for repairs. Warerkar. Tanay. 2018-02-19. Curbed NY. 2018-02-20. August 1, 2019. https://web.archive.org/web/20190801224955/https://ny.curbed.com/2018/2/19/17028804/upper-west-side-subway-closure-repairs. live.
  58. Web site: Press Release - NYC Transit - Structural Repairs & Functional Enhancements at Cathedral Pkwy-110 St Subway Station to be Completed Labor Day Weekend. August 27, 2018. MTA. August 29, 2018. August 30, 2019. https://web.archive.org/web/20190830213547/http://www.mta.info/press-release/nyc-transit/structural-repairs-functional-enhancements-cathedral-pkwy-110-st-subway. live.
  59. Web site: Press Release - NYC Transit - 163 St-Amsterdam Av Station to Reopen After Structural Repairs & Functional Improvements. September 23, 2018. MTA. September 24, 2018. September 4, 2019. https://web.archive.org/web/20190904141344/http://www.mta.info/press-release/nyc-transit/163-st-amsterdam-av-station-reopen-after-structural-repairs-functional. dead.
  60. News: 100 Miles Of Subway In New City Project; 52 Of Them In Queens; Transportation Board Gives Out Routes of Second System to Cover Four Boroughs. $438,400,000 Cost To Build Second Av. Trunk Line to Be Hub, Linking With Bronx and New River Tubes to East. Rockaways To Be Served Project's Sponsors See Network Touching All Sections Now in Need of Rapid Transit. Big Items Not in Cost Estimate. East Side Belt Line. New Subway Unit To Have 100 Miles 100 Four New Routes in Bronx. Queens Gets Most Mileage. Main Manhattan-Bronx Line. 163d St.-Lafayette Avenue Line. East-West Bronx Line. New Brooklyn Lines. To Serve Rockaway. Queens Cross Connections. For Easterly Queens.. September 16, 1929. The New York Times. 0362-4331. April 2, 2018. April 3, 2018. https://web.archive.org/web/20180403022202/https://www.nytimes.com/1929/09/16/archives/100-miles-of-subway-in-new-city-project-52-of-them-in-queens.html. live.
  61. News: Public Hearings.. March 2, 1930. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628021345/https://www.nytimes.com/1930/03/02/archives/public-hearings.html. live.
  62. News: Want Grand St. Subway.; East Side Civic Groups Approve Proposal at a Hearing.. March 13, 1930. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628021350/https://www.nytimes.com/1930/03/13/archives/want-grand-st-subway-east-side-civic-groups-approve-proposal-at-a.html. live.
  63. News: Planning To Build Worth St. Subway; Transportation Board Officials Getting Sanction of Property Owners. Delaney Outlines Route. New East Side Link Will Connect With Other Rapid Transit Lines Near Church Street.. July 27, 1930. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628022600/https://www.nytimes.com/1930/07/27/archives/planning-to-build-worth-st-subway-transportation-board-officials.html. live.
  64. News: Push Subway Links To Aid Brooklyn; Members of Transit Board to Ask Bids on Church Street Connection on Aug. 22. B.M.T. Contract Let Board of Estimate Gets $654,000 on Defaulted 14th St. Job--Awards $2,215,000 for Land.. July 30, 1930. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628022629/https://www.nytimes.com/1930/07/30/archives/push-subway-links-to-aid-brooklyn-members-of-transit-board-to-ask.html. live.
  65. News: $414,518,050 Outlay For City Projects Asked By Bureaus; Additional Sums for Works Already Under Way Account for Most of the Total. December 16, 1937. The New York Times. June 27, 2018. en. 0362-4331. June 27, 2018. https://web.archive.org/web/20180627230805/https://www.nytimes.com/1937/12/16/archives/414518050-outlay-for-city-projects-asked-by-bureaus-additional-sums.html. live.
  66. News: Transit Expansion To Cost $827,102,344; Delaney Submits Long-Range Program to Planning Board--Many Items Must Wait Early Unification Assumed Projects as Submitted Transit Expansion To Cost $827,102,344 Reply To Haskell Issued Morris Says Demand for Price on Transit Cannot Be Met Now. September 15, 1938. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628021228/https://www.nytimes.com/1938/09/15/archives/transit-expansion-to-cost-827102344-delaney-submits-longrange.html. live.
  67. News: Eighth Av. Subway Nearly Completed; Basic Construction Work From Chambers to 207th St. Done Except on Few Short Stretches. To Operate Late In 1931 Equipment, Rolling Stock and Electrical Apparatus Are Being Rapidly Provided. Report Work Done to July 31. Ten of 300 New Cars Delivered.. August 24, 1930. The New York Times. June 27, 2018. en. 0362-4331. June 28, 2018. https://web.archive.org/web/20180628024152/https://www.nytimes.com/1930/08/24/archives/eighth-av-subway-nearly-completed-basic-construction-work-from.html. live.
  68. News: Jobs are Filled on All Subway Links. June 25, 1933. The New York Times. June 29, 2018. 8. 0362-4331. June 29, 2018. https://web.archive.org/web/20180629213330/https://www.nytimes.com/1933/06/25/archives/jobs-are-all-filled-on-subway-links-board-reports-thousands-already.html. live.