Courthouse station (MBTA) explained

Courthouse
Style:MBTA
Style2:Silver
Coordinates:42.3528°N -71.0475°W
Address:Seaport Boulevard at Pittsburg Street
Line:South Boston Piers Transitway
Other: MBTA bus:
Passengers:2,530 boardings (weekday average)[1]
Pass Year:FY2019
Opened:December 17, 2004
Accessible:Yes
Other Services Header:Former services
Other Services Collapsible:yes
Mapframe:yes
Mapframe-Marker:bus
Mapframe-Zoom:14

Courthouse station is an underground bus rapid transit station on the MBTA's Silver Line, located under Seaport Boulevard at Thomson Street on the South Boston Waterfront. It is named for the John Joseph Moakley United States Courthouse which is one block to the north on Fan Pier. The station also serves the Fort Point neighborhood, the Institute of Contemporary Art, Boston, and nearby residential and commercial development. Like all Silver Line stations, Courthouse station is accessible.

Station design

Construction of the $110 million station was technically demanding, as the Waterfront district is built on fill rather than solid ground or rock. Slurry walls and large braces were built, allowing 210,000 cubic yards of soil to be excavated for the platform area.[2] The station was called Fan Pier during early planning until it was determined that the federal courthouse would be located nearby.[3] Because the station was initially surrounded by parking lots, its original headhouses were intended to be temporary until development occurred. The station was also designed to allow two future entrances at the east end of the mezzanine if needed.[4]

The station was intended as the centerpiece of the Silver Line and a key feature of Boston's Innovation district, with a visual impact significantly different from other stations in the MBTA system. It includes "some of the most complex and ornate station finishes installed in any MBTA transportation facility to date" which cost $30 million to complete. The lobby includes a polished stone floor and distinctive purple overhead lighting fixtures, while both the platforms have brushed steel finishes on support columns and walls. The station was turned into an "idea lab" nightclub and conference center in June 2014 for Boston Idea Week, which included several other MBTA-centered events.[5] [6]

History

Courthouse station opened along with the rest of the South Boston Piers Transitway from South Station to Silver Line Way on December 17, 2004. Through service on the SL2 and SL3 routes serving the Design Center and City Point areas began on December 31, 2004, followed by SL1 service on June 1, 2005. SL3 service was discontinued on March 20, 2009.

The station has headhouses on the north and south sides of Seaport Boulevard. The south headhouse was closed from October 5, 2015 until October 2016 due to construction of a hotel partially over the headhouse.[7] SL3 service (a new South Station–Chelsea route different from the discontinued City Point route) at the station began on April 21, 2018.

The station suffers from water infiltration from several sources, which has damaged ducts and electrical conduits. A $26.9 million contract for waterproofing and repairs was approved by the MBTA in December 2020, with construction to take place from January 2021 to early 2023.[8] Construction of a northeast headhouse with a separate elevator is also underway; bidding began in December 2020, with notice to proceed given on a $15.3 million contract in June 2021.[9] [10]

External links

Notes and References

  1. Web site: A Guide to Ridership Data . MassDOT/MBTA Office of Performance Management and Innovation . June 22, 2020 . 10.
  2. Web site: MBTA Transitway Courthouse Station and Tunnel . J.F. White Contracting . 10 July 2014.
  3. Book: South Boston Piers / Fort Point Channel transit project, Boston, Massachusetts: Final Environmental Impact Statement / Final Environmental Impact Report . December 1993 . Federal Transit Administration and Massachusetts Bay Transportation Authority . Internet Archive . 2.34.
  4. Silver Line Waterfront Bus Rapid Transit (BRT): 2007 Evaluation . June 1, 2007 . Paul . Schimek . Kari . Watkins . David . Chase . Karl . Smith . Stephen . Gazillo . Federal Transit Administration.
  5. News: Courthouse Station Turns 'Techno Meets Hipster' Nightclub-Like Lab for Boston Idea Week . BostInno . 16 June 2014 . Bernard, Gillis . 10 July 2014.
  6. The MBTA Is Embracing Boston Idea Week . Boston Magazine . 11 June 2014 . Annear, Steve . 10 July 2014 . 14 July 2014 . https://web.archive.org/web/20140714214216/http://www.bostonmagazine.com/news/blog/2014/06/11/boston-idea-week-mbta-bands-on-trains/ . dead .
  7. Web site: Route SL1: Upcoming . Bus Service Alerts . Massachusetts Bay Transportation Authority . https://web.archive.org/web/20150911173135/http://www.mbta.com/rider_tools/transit_updates/?ttype=bus&atype=alert&route=SL1&detail=SL1 . 11 September 2015 . 11 September 2015.
  8. Web site: MBTA Construction Contract No. X02CN04: SL Courthouse Station Waterproofing Resiliency and Repairs . December 7, 2020 . Karl E. . Eckstrom . Massachusetts Bay Transportation Authority.
  9. Web site: Notice to Bidders . December 1, 2020 . Massachusetts Bay Transportation Authority.
  10. Web site: SILVER LINE COURTHOUSE STATION NORTHEAST HEADHOUSE . June 7, 2021 . Massachusetts Bay Transportation Authority.