The Finnis Lithium Project is a lithium mine situated near Darwin in the Northern Territory, Australia. It is being developed by Core Lithium.
The ore body was discovered in 2016, and feasibility work was done in 2018–2020 with a firm investment decision made in September 2021. Commercial production began in February 2023
The mine comprises of leases, covering the Bynoe pegmatite field (BPF) and several pegmatites near Darwin. Specifically, it encompasses the five ore deposits "Grants, Carlton, Sandras, Hang Gong SW, and BP33." The:with a consistent lithium content across the ore body.[1]
Core Lithium is developing the project,[2] having completed a pre-feasibility study (PFS) in June 2018 and a definitive feasibility study (DFS) in April 2019. Revisions to the feasibility study were completed in 2020 to incorporate underground mining methods in the mining plan. A revised DFS was completed in July 2021 outlining a project that will occur in multiple stages. The first stage will involve open-pit mining near Grants and Hang Gong, as well as underground mining at the Grants, BP33, and Carlton prospects.[3] The Australian JORC 2012 compliance process estimated 3.45 million tonnes (Mt) of mineral resource at 1.4 percent lithium oxide.[2] Major Project Status (MPS) was granted by the Australian government in March 2021, recognizing the strategic significance of the project.[4]
Battery-grade lithium hydroxide was produced as part of the test works on spodumene mineral concentrate sample from the project in April 2021.[3] Construction began in 2021 and full operational mining commenced in October 2022, with the first shipment of spodumene concentrate being exported from the Port of Darwin in May 2023.[3]
Development of the mine is an $89 million project. Over the 12-year lifespan of the project 16e6t of ore
In 2022, Tesla contracted for 110e3t of spodumene concentrate over four years from the Core Lithium and the Finniss lithium mine.[5] [6]