The Coquihalla railway link, operated by the Kettle Valley Railway (KV), a Canadian Pacific Railway (CP) subsidiary, connected the Coquihalla Summit and Hope in southwestern British Columbia. This standard gauge trackage, which followed the Coquihalla River through the North Cascades, formed the greater part of the KV Coquihalla Subdivision.
During surveys for a transcontinental railway route in the 1870s, Sandford Fleming estimated 60NaN0 of aggregate tunnelling and severe gradients would be required for a Coquihalla route.
When surveying alternative east–west routes over the passes (namely Allison (longest), Coquihalla, and Railroad (shortest)) in 1902, Edgar Dewdney rejected all of them in favour of rails via Spences Bridge. Around 1900, the Columbia and Western Railway (C&W), a CP subsidiary, had projected a line to connect Princeton and Penticton via Keremeos,[1] but this never eventuated. CP's Thomas Shaughnessy claimed he would build a direct Kootenays to the coast line, but the chosen route was more suited to local traffic. Chief engineer Andrew McCulloch was not given the freedom to select the optimal route.
By 1910, the CP and Great Northern Railway (GN), had each surveyed routes through the Coquihalla canyon. GN's James J. Hill planned a 8miles tunnel under the mountain between Tulameen and Portia, because negotiating Railroad Pass without a tunnel was impractical. Exiting on the east side of the Coquihalla River, this tunnel would not have interfered with earlier and later trails and roads. Extreme weather proved to make the upper Coquihalla canyon extremely expensive to maintain. Such a tunnel would not only protect against these weather-related issues but would be 300NaN0 shorter. After calling for tenders,[2] GN ultimately chose the longer Coquihalla Pass route instead.
The CP route via Osprey Lake (Bankeir) and Brookmere was not optimal. A sounder choice would have been southwest to the Similkameen River and northwest to a Railroad Pass tunnel. To bring into being this tunnel option, a compromise between CP and GN should have been forced upon both parties earlier. Instead, the CP and GN conflicts over the narrow Coquihalla right-of-way triggered years of legal claims. In November 1913, they signed the Coquihalla Agreement, whereby CP would build and maintain the Coquihalla line, but GN would receive running rights. In early 1914, they signed the Tulameen Agreement, whereby GN would be responsible for Princeton–Brookmere, upon which CP would have running rights.
In 1937, John Sullivan wrote to McCulloch, both retired senior CP employees, stating, "Of all the blunders in railway building history the CPR's southern British Columbia rail line (namely the KV) is the greatest".
In harsh weather, scree forms an unstable building base. In the upper canyon, the railbed lay at the transition from semi-solid rock to scree. The latter provided the outer part of the rail bed, while the inner part was cut from the rock face. Construction crews returning in spring 1916 needed first to repair much of the 1915 construction work that had been destroyed by slides over the winter.
The maximum gradient was 2.2 per cent. Construction costs were $136,000 per mile, five times the average cost for Canadian railways in 1913. One particular mile in the upper canyon cost $300,000, being one of the most expensive miles of railway built up to that time. The provincial construction subsidy was $10,000 per mile.
The last spike on the KV was driven in July 1916 east of the tunnel adjacent to the Ladner Creek bridge.[3]
Regular passenger service began at the end of July 1916. Eastbound trains took on pusher engines at Hope.
Washouts and slides closed the Coquihalla during December 1917–May 1918, January–May 1921, 2 to 4 months in 1930s, and 6 months in 1938–39. During World War II, Japanese Canadians from the Tashme Incarceration Camp formed a bridge and building maintenance gang. Having barely recovered from the damage of the previous winter, the line again closed in fall 1949.
In 1926, CP was making plans to abandon the Coquihalla route, following a series of slides. Even if an abandonment received government approval, CP might have been required to return government construction subsidies and would also forfeit the annual fee paid by GN. When slides and washouts in 1932 resurrected thoughts of abandonment, the ongoing GN payments were the deciding factor. Severe weather damage in early 1939 raised concerns again, but the likelihood of an escalating war in Europe, which would increase rail traffic, instead prompted extensive upgrades.
For a line it had never commercially used, GN had paid CP $150,000 annually since 1916, and CP had paid GN $60,000 annually for actual use. In 1944–45, to end such payments, GN paid $4,500,000 to CP to terminate the Coquihalla Agreement. In turn, CP paid GN $1,500,000 to terminate the Tulameen Agreement and acquired that leg.
During World War II, bulldozers were introduced for snow clearing, which proved superior to the prior combination of rotary and wedge plows. In addition, substandard snowsheds were removed rather than replaced, resulting in 10 of the original 15 sheds being demolished over an eight-year period.
Not a single passenger was killed during the lifetime of the railway. A speeder checking for slides and washouts preceded every passenger train through the Coquihalla Pass. In winter, a plow train preceded the speeder. In addition, foot patrols checked the whole route every day.
In 1952, passenger train schedules were changed by 12 hours, meaning the Coquihalla was travelled during daylight. In 1954, the passenger schedule reverted to night time travel through the area. After the November 1959 slides and washouts in the vicinity of Jessica, passenger service through the Coquihalla permanently ceased that month.
CP Train Timetables (Regular stop or Flag stop) | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Mile | 1916 | 1919 | 1929 | 1932 | 1935 | 1939 | 1943 | 1948 | 1954 | 1959 | |
[4] | [5] | [6] | [7] | [8] | [9] | [10] | [11] | [12] | [13] | ||
Hope | 162.7 | Reg. | Reg. | Reg. | Reg. | Reg. | Reg. | Reg | Reg. | Reg. | |
CNRCrossing | 162.2 | Flag | |||||||||
Othello | 157.2 | Flag | Flag | Flag | Flag | Flag | Flag | Flag | Flag | ||
Lear | 153.3 | Flag | Flag | Flag | Flag | Flag | Flag | Flag | Flag | ||
Jessica | 148.2 | Both | Reg. | Flag | Flag | Flag | Flag | Flag | Flag | ||
Aurum | 146.7 | Flag | Flag | ||||||||
Portia | 142.6 | Flag | Flag | Reg. | Reg. | Reg. | Both | Both | Flag | Flag | |
Iago | 137.9 | Flag | Flag | Flag | Flag | Flag | Flag | Flag | Flag | ||
Romeo | 132.2 | Flag | Flag | Flag | Flag | Flag | Flag | Flag | Flag | ||
Coquihalla | 126.1 | Reg. | Reg. | Reg. | Reg. | Reg. | Reg. | Both | Flag | Flag |
KV infrastructure and incidents for Coquihalla–Romeo | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
The Juliet–Coquihalla table of the Coldwater River former railway trackage is the adjacent segment. | |||||||||||||||||
17.2 | Wye Operational Jul 1916 to Jul 1961. Mainly used for turning pusher engines from Hope during 1916–c.1930. Sited about 400m (1,300feet) south of present Britton Creek Rest Area. The northeast leg of the wye is the beginning of present Tulameen FSR. | ||||||||||||||||
17.2 | By yearend 1913, the westward advance of the KV rail head from the Brodie Station reached this point, where it remained until tracklaying recommenced in late summer 1914. | ||||||||||||||||
18.0 | Coquihalla | Jul 1916 to Nov1959 | Small shack | c.1916. just north of water tank. | 1961 | Removed after 1961. | Likely built 1915 just south of water tank. | Building removed after 1972. Foundation remains. | 1916 | Dec 1959 | 40000impgal aligned with present Coquihalla Lakes Lodge. Deactivated 1954. Foundation remains. | None | Two-stall built 1917 (aligned with north end of Upper Lake). Later demolished. | Jul 1916 to Jul1961. Length 25880NaN0 | |||
Coquihalla Lakes Road largely follows the KV rail bed to Mile 18.7, as does the Trans Mountain Pipeline private road to Mile 19.6. At this point, the road leaves the KV rail bed, which is impassable and dangerous, but visible in places on the hillside above. | |||||||||||||||||
19.7 | Tunnel #1: 196feet timber lined. Concrete portals added at west end in 1947 and east end in 1951. | ||||||||||||||||
19.7 | Tunnel #2: 280feet length. Concrete portals added in 1943. Since collapsed. | ||||||||||||||||
20.3 | Tunnel #3: 192feet length. Concrete portals added at west end in 1948 and east end in 1941. Since collapsed. | ||||||||||||||||
20.5 | Sweeney's Cut. | ||||||||||||||||
20.6 | Gulch: 150feet timber frame trestle. Rebuilt in 1947. Removed. | ||||||||||||||||
20.7 | Gulch: 405feet timber frame trestle. Rebuilt in 1947. Army demolition exercise blew up in Sep 1969. | ||||||||||||||||
21.0 | In early Oct 1914, the westward advance of the KV rail head from the Brodie Station reached this point. | ||||||||||||||||
21.0 | Gulch: 50feet box culvert. Replaced by 105feet timber frame trestle in 1948. | ||||||||||||||||
21.2 | Falls Creek (Bridal Veil Falls to northwest): 404feet timber frame trestle. Replaced by 405feet timber frame trestle and steel deck lattice span c.1927. Collapsed winter 1995–96. | ||||||||||||||||
21.4 | Hayden's Cut: Unstable rock prevented 50feet tunnel. Presumably named after conductor Augusto Taylor Hayden, who died in Nov 1916 when a rockslide smashed into a snowplow unit in the vicinity. | ||||||||||||||||
21.5 | Gulch: 150feet timber frame trestle. Destroyed by forest fire in 1938. Snowslide took out 750NaN0 in 1949. Later removed. | ||||||||||||||||
21.7 | Tack Creek: 315feet timber frame trestle. Replaced by 295feet steel deck plate girder spans in 1954. Partially dismantled when rails lifted in 1962. Steel towers remain. | ||||||||||||||||
22.2 | Gulch: timber frame trestle of unknown dimensions. | ||||||||||||||||
22.3 | Gulch: 285feet timber frame trestle. Destroyed by forest fire in 1938. Replaced by fill in 1952. | ||||||||||||||||
22.5 | Tunnel #4: 250feet length. Concrete portals added at west end in 1945 and east end in 1942. Collapsed in May 1959. Replaced by diversion around the mountain. | ||||||||||||||||
22.7 | Cultus Creek: 630feet timber frame trestle. Removed c.1970. | ||||||||||||||||
23.1 | Tunnel #5: 306feet length. Concrete portals added at west end in 1945 and east end in 1939. | ||||||||||||||||
23.2 | Gulch: 135feet timber frame trestle. Removed. | ||||||||||||||||
23.3 | Gulch: 195feet timber frame trestle. Removed. | ||||||||||||||||
23.5 | Tunnel #6: 260feet length. Concrete portals added at west end in 1942 and east end in 1946. | ||||||||||||||||
23.5 | Water: 7000impgal open tank on the northwest side of the main line. Deactivated late 1940s. Mostly emergency water supply. | ||||||||||||||||
23.6 | Unnamed creek: 330feet timber frame trestle. Rebuilt in 1948. Removed. | ||||||||||||||||
23.8 | Snowshed #1: 264feet length. Extended by 4750NaN0 in 1917 and 2210NaN0 in 1918. Removed in late 1945. |
KV infrastructure and incidents for Romeo–Iago | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
24.1 | Romeo | Jul 1916 to Nov1959 | None | N/A | N/A | N/A | 1915. | Burned down 1962. | 1916 | Dec 1959 | None | None | None | Jul 1916 to Jul1961. Length 23300NaN0 | |||
During switching in 1930, a brakeman slipped and was fatally struck by a freight car. | [14] | ||||||||||||||||
24.0 | Snowshed #2: 186feet length. Removed in 1944. | ||||||||||||||||
24.1 | Snowshed #3: 230feet length. Extended by 4030NaN0 in 1920. Removed in 1945. | ||||||||||||||||
24.3 | Snowshed #4: Two short sheds 48feet and 128feet lengths. Gap of 440NaN0 closed in 1937. Extended by 1100NaN0 in 1920. Removed in 1945. | ||||||||||||||||
24.4 | Snowshed #5: 310feet length. Extended by 550NaN0 in 1919 and 480NaN0 in 1920. Later rebuilt and shortened. Collapsed c.1970. | ||||||||||||||||
24.5 | Snowshed #6: about 190feet length. Removed in late 1943. | ||||||||||||||||
24.7 | Snowshed #7: 554feet length. Gap of 2000NaN0 to shed 8 closed in 1920. Removed in 1945. | ||||||||||||||||
24.7 | Snowshed #8: 376.5feet length. Joined to shed 7 in 1920. | ||||||||||||||||
25.2 | Snowshed #9: 402feet length. Removed in 1946. | ||||||||||||||||
25.3 | In November 1941, a westbound passenger train hit a rockslide. The locomotive plunged about 2000NaN0 down an embankment. The fireman and engineer died. | ||||||||||||||||
25.8 | Slide (Needle) Creek: 320feet steel deck truss span, 60feet deck plate girder span, and 50feet deck plate girder span. Dismantled in 1981. | ||||||||||||||||
26.0 | Snowshed #10: 504feet length. Extended by 2400NaN0 in 1919 and 2720NaN0 in 1920. Removed in 1945–46. | ||||||||||||||||
26.3 | Snowshed #11: 826feet length. Extended by 2000NaN0 in 1942 and 300NaN0 in 1944. Removed 9460NaN0 in 1945. Collapsed c.1968. | ||||||||||||||||
26.6 | Snowshed #12: Two sheds 118adj=on0adj=on and 709feet lengths. Gap of 3300NaN0 closed and 7370NaN0 removed at unknown dates. Final part removed c.1969. | ||||||||||||||||
26.8 | Snowshed #13: 144feet length. Removed by 1945. | ||||||||||||||||
26.9 | Snowshed #14: 280feet length. Removed after 1969. | ||||||||||||||||
27.2 | Trans Mountain Pipeline road rejoins the former rail bed. | ||||||||||||||||
27.6 | Tunnel #7: 164feet length. Concrete portal added at west end in 1943. | ||||||||||||||||
28.2 | Snowshed #15: 360feet length. Several rebuilds in 1930s. When a snowslide destroyed 1720NaN0 of the timber structure in 1951, a 350feet reinforced concrete replacement was built. The present road passes around the rock-filled snowshed. | ||||||||||||||||
28.3 | Gulch: 404feet timber frame trestle. Lengthened by 310NaN0 at an unknown date. Destroyed by rockslide in 1956. Replaced by line revision. Overlooks where the Hudson's Bay Company (HBC) trail forded the river. | ||||||||||||||||
In late Mar 1926, a freight locomotive fell through the damaged trestle and plunged about 1500NaN0. Two loaded coal cars were destroyed but the locomotive sustained little damage. | [15] |
KV infrastructure and incidents for Iago-Portia | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
29.7 | Iago | Jul 1916 to Nov1959 | None | N/A | N/A | N/A | Likely, 1915. | Half buried in 1932 snowslide. Moved to beside water tank c.1936. Burned down in 1962. Foundation remains. | 1916 | Dec 1959 | 20000impgal enclosed tank. Rebuilt as open structure in 1948. Dismantled in 1960s. Foundation remains. | 60ST built in 1945. Dismantled in Mar 1952. | None | Jul 1916 to Jul1961. Length 2670NaN0 | |||
In mid-Dec 1917, a slide struck a snowplow unit at Iago. The caboose plunged about 7000NaN0 into the canyon. One occupant died, two were seriously injured. | |||||||||||||||||
In late Jan 1954, the lead diesel locomotive of an eastbound passenger train struck a snowslide, derailed, and plunged about 1500NaN0. | [16] | ||||||||||||||||
31.0 | Norley Creek: 119feet timber frame trestle. Replaced by fill by 1947. | ||||||||||||||||
31.2 | Trans Mountain Pipeline road leaves the former rail bed. | ||||||||||||||||
31.9 | Carry Creek: 359feet timber frame trestle. Replaced by fill in 1944. | ||||||||||||||||
31.9 | In mid-Sep 1915, the westward advance of the KV rail head from the Brodie Station reached this point. | ||||||||||||||||
32.0 | Unnamed creek: 162feet of steel deck plate girder spans. Removed in 1962. Abutments and towers remain. | ||||||||||||||||
33.0 | Trans Mountain Pipeline road rejoins the former rail bed. | ||||||||||||||||
33.9 | Boston Bar Creek: 70feet steel deck plate girder span and two 134feet timber frame trestle approaches. Removed after 1961. Footings are just below the current one-lane timber road bridge off Highway 5 Exit 202. | ||||||||||||||||
34.0 | Boston Bar Creek: 85feet timber frame trestle on western leg of wye. Removed in mid-1980s. The northbound highway on-ramp approximates the eastern leg of the wye. The western leg was almost totally west of the highway. The wye was used primarily to turn snowplows. |
KV infrastructure and incidents for Portia-Aurum | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
34.4 | Portia | Jul 1916 to Nov1959 | None | N/A | N/A | N/A | None | N/A | N/A | N/A | None | None | None | Jul 1916 to Jul1961. Length 25590NaN0 | |||
35.2 | Gulch: 405feet timber frame trestle. Replaced by fill in 1954. | ||||||||||||||||
35.5 | Unnamed creek: 112feet timber frame trestle from early 1930s. Removed. | ||||||||||||||||
35.9 | Unnamed creek: 359feet timber frame trestle. Rebuilt during 1940s and 1950s. Removed. | ||||||||||||||||
36.7 | Tunnel #8: 91feet length. Concrete portals added at west end in 1944 and east end in 1949. Since collapsed. | ||||||||||||||||
36.8 | Ladner Creek: 560feet length, comprising eight steel deck plate girder spans, which stand 2250NaN0 above the creek. The 12-degree curve is the sharpest on the KV. | ||||||||||||||||
36.8 | In early Sep 1915, the eastward advance of the KV rail head from the CN/KV crossing at Hope reached this point. In mid-Oct 1915, a rockslide demolished the bridge construction camp after the inhabitants had left for work that day. | ||||||||||||||||
36.9 | Unnamed creek: Box culvert. Replaced by 135feet timber frame trestle after early 1930s. Removed. | ||||||||||||||||
37.0 | Unnamed creek: 104feet timber frame trestle. Replaced by 45feet timber frame trestle at unknown date. Removed. | ||||||||||||||||
37.1 | Twenty Mile Creek: 131feet comprising two steel deck plate girder spans. Removed. | ||||||||||||||||
37.7 | Unnamed creek: 254feet timber frame trestle. Replaced by fill and concrete culvert in 1930. |
KV infrastructure and incidents for Aurum-Jessica | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
38.3 | Aurum | Sep 1931 to Sep1947 | None | N/A | N/A | N/A | None | N/A | N/A | N/A | None | None | None | None | |||
38.3 | Tangent Creek: 284feet timber frame trestle. Replaced by fill and 12feet timber frame trestle and concrete culvert in 1956. After the Nov 1959 washout, this fill was never repaired. | ||||||||||||||||
38.5 | Unnamed creek: 54feet timber frame trestle. Replaced by 21feet steel half deck plate girder span in 1950. | ||||||||||||||||
38.6 | Verona | Apr 1922 to Sep1925 | None | N/A | N/A | N/A | None | N/A | N/A | N/A | None | None | None | None | |||
38.7 | Unnamed creek: 240feet pile trestle later lengthened. Replaced by concrete box culvert on realignment in 1944. | ||||||||||||||||
39.0 | Fifteen Mile Creek: 224feet timber frame trestle. Replaced by 240feet timber frame trestle at unknown date. Removed. When the rail bed became a logging road, two adjacent flatcars were installed as the road bridge deck. | ||||||||||||||||
39.4 | Unnamed creek: 74feet timber frame trestle. Replaced by 75feet timber frame trestle on old alignment. Replaced by 60feet timber frame trestle in 1950 on new alignment. | ||||||||||||||||
39.5 | Unnamed creek: 105feet timber frame trestle on old alignment. | ||||||||||||||||
39.6 | Snowshoe Creek: 315feet timber frame trestle on old alignment. Added 450NaN0 in 1932 and 980NaN0 in 1946. | ||||||||||||||||
39.6 | Snowshoe Creek: 15feet timber frame trestle on new alignment in 1950. |
KV infrastructure and incidents for Jessica–Lear | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
39.8 | Jessica | Jul 1916 to Nov1959 | Small freight/passenger shelter. | Unknown | 1961 | Likely 1915, west of water tank. | Removed. Foundation remains. | 1916 | Dec 1959 | 20000impgal enclosed tank. Deactivated 1947. | None | None | Jul 1916 to Jul1961. Length 26550NaN0 | ||||
40.2 | Gulch: 104feet timber frame trestle. Replaced by fill in 1952. | ||||||||||||||||
40.3 | Gulch: 259feet timber frame trestle. Replaced by fill in 1951 on old alignment. | ||||||||||||||||
40.5 | Gulch: 240feet timber frame trestle. Replaced by fill in 1951 on new alignment. | ||||||||||||||||
40.5 | In early Sep 1926, a runaway freight train derailed at the east end of the bridge, plunged into the canyon, and caused at least four deaths. Fire destroyed the bridge, which was rebuilt. | [17] | |||||||||||||||
40.9 | Unnamed creek: Wood box culvert. Replaced by 45feet timber pile trestle in 1947. Replaced by a fill and pipe at unknown date. | ||||||||||||||||
41.4 | Unnamed creek: Bridge top culvert. Replaced by 45feet timber pile trestle at unknown date. | ||||||||||||||||
42.5 | Eleven Mile (Deneau) Creek: 284feet timber frame trestle. Replaced by 285feet timber frame trestle at unknown date. | ||||||||||||||||
43.0 | Unnamed creek: 45feet timber pile trestle. When washed out in Nov 1959, never repaired. | ||||||||||||||||
43.1 | Ten Mile Creek: 120feet timber frame trestle. Replaced by fill and steel culvert in 1954. | ||||||||||||||||
44.4 | Nine Mile Creek: Bridge top culvert. Replaced by 15feet timber pile trestle at unknown date. |
KV Infrastructure for Lear–Hope | |||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Mile | Place | Passenger Service | Station Building | Section House | Section Crew | Storage Capacity | Engine House | Track | Ref. | ||||||||
Type | Built | Closed | Comments | Built | Comments | From | To | Water Tank | Coal Chute | Passing | Other | ||||||
45.2 | Lear | Jul 1916 to Nov1959 | Small freight/passenger shelter. | Unknown | 1961 | Likely 1915. | Removed after 1961. | 1916 | Dec 1959 | 40000impgal open tank built in 1947. Deactivated in winter 1953–54. | None | None | Jul 1916 to Jul1961. Length 26310NaN0 | ||||
46.2 | Gold Creek | May 1927 to Sep1930 | None | N/A | N/A | N/A | None | N/A | N/A | N/A | None | None | None | None | |||
49.0 | Othello | ||||||||||||||||
54.3 | Hope |
The massive capital investment of the difficult construction was never remotely recovered.
In 1960, Trans Mountain Pipeline bought the Brodie–Jessica right-of-way. That year, work trains, operating from each side of the blockage, collected employee and CP possessions. In 1961, CP announced plans to formally abandon the route, which received government approval that summer. Rails were lifted westward from Mile 38.3 to Hope in August 1961 and eastward from the washout to Boston Bar Creek in September and October. The balance were removed in 1962. Trans Mountain Pipeline built a private road north from Portia. largely upon the former rail bed.
In October 1961, KV passenger trains terminated at Spences Bridge in the middle of the night for transfers to a main line connection, instead of terminating at Vancouver.
The surviving rail bed forms part of the Kettle Valley Rail Trail segment of the Trans Canada Trail.