Transportation Expansion Project Explained

The Transportation Expansion (T-REX) Project[1] was a $1.67 billion project aimed at improving transportation options for commuters in the Denver metro area within the areas of Interstate 25 and 225, which was recognized as the 14th busiest intersection in the United States at the time. The T-REX effort widened major interstates to up to 5 mainline lanes in each direction and added 19miles of double-track light rail throughout the metropolitan area (40miles total). The T-REX project finished 3.2% under its $1.67 billion budget and 22 months ahead of schedule in 2006.[2]

The T-REX project is one of the first transportation projects in the US to use a design-build contract in which the same contractor is responsible for the project's engineering and construction. Under this type of contract, the contracting agency provides a general concept of the plan, and the contractor is responsible for most of the details, many of which are worked out as the project proceeds.[3] [4]

The T-REX corridor carries more than 280,000 vehicles per day and connects the two largest employment centers in the region: Downtown Denver and the Denver Tech Center.

Funding

The TABOR laws enacted in 1992 disallowed the T-REX from being funded by state, county, city or gas taxes. The state of Colorado was also hesistant in collecting mandatory additional tax from its residents.[5] [6] Metropolitan areas that would benefit from the expansion voted to approve an increase of property taxes required for the build-out. In November 1999, voters in affected municipalities approved two property-tax increases which partially funded the transit portion of the project.

Among those were:

History

A 1992 traffic congestion study commissioned by the Denver Regional Council of Governments (DRCOG) found that traffic volume along the corridor had exceeded its maximum capacity of 180,000 vehicles per day and, within a few years from the time of the study, the freeway would be near gridlock most of the day. Adding to the gloomy forecast of gridlock, planners projected that 150,000 new jobs would be added in the downtown area and at the huge Denver Tech Center, which is 15 miles (24 kilometers) to the south, over the next 20 years. The study recommended widening the freeway by several lanes, and suggested incorporating mass transit options into any future improvements.

In April 1995, The Colorado Department of Transportation and RTD started a partnership that became T-REX. The two agencies and DRCOG commissioned the Southeast Corridor Major Investment Study (MIS), which investigated solutions to the I-25/I-225 congestion problem.[9] Arapahoe and Douglas counties along with the cities of Denver, Aurora, and Greenwood Village participated in the initial MIS. Two other Denver-area corridor studies were also initiated.

The initial MIS was primarily transit-oriented in scope. The recommendations included light rail, highway improvements, pedestrian/bicycle facility improvements, enhanced Transportation Demand Management (TDM), Intelligent transportation system (ITS) measures. It also recommended safety improvements such as acceleration and deceleration lanes and wider shoulders. The initial MIS did not call for additional highway lanes. The Federal Highway Administration and CDOT did not agree with this omission, and leaders of all four agencies thought that the MIS placed too much emphasis on transit.[10] [11] Mobility was instead focused on, and the agencies focused on "highway and transit as coordinated pieces of a comprehensive strategy to maximize mobility in a project with limited available right of way", which led to the creation of T-REX.[12]

A second, more comprehensive MIS was completed two years later. Unlike the initial study, the scope included Core Infrastructure (Highway) improvements as well as Transit solutions. It recommended expanding highway lanes up to 7 wide in each direction as well as adding light rail support throughout the corridor. Additionally, the cities of Lone Tree, Parker and Centennial were also included for input and feedback. DRCOG adopted the recommendations of the 1997 Study which included the 19miles of double-track light rail and 13 stations with the track running next to or in the median of I-25 and I-225.

In November 1998, DRCOG adopted a 20-year regional transportation plan called Metro Vision 2020.[13] T-REX was a top priority in the plan.

Planning for the project began in June 1999. The passage of a law allowing the state Department of Transportation (CDOT) to use Transportation Revenue Anticipation Notes to borrow money based on federal funds the state had not yet been approved.[14] The Colorado Department of Transportation (CDOT), Regional Transportation District (RTD), Federal Highway Administration and Federal Transit Administration soon signed a "Partnering Agreement" to work on the project, and voters approved the plan to run light rail through the corridor.[15] Southeast Corridor Constructors, a joint venture between Omaha, Nebraska-based Kiewit Construction[16] and Pasadena, CA-based Parsons Transportation Group [17] won the design-build contract in May 2001. Construction began only a few months later in June 2001.

The "Partnering Agreement" was a key to the success of the project. Signed by all stakeholders, it established four primary goals:

A Policy Committee was founded to provide input on policy-related issues and monitored project progress relative to the overall public agency decision-making process, and a Technical Committee focused on all planning, engineering and environmental issues and assisted in the development and refinement of alternatives. Members of this committee were individuals from the various cities and jurisdictions within the study area who had a technical background.[12]

The two committees used goals from the "Partnering Agreement" to refine and evaluate each alternative. Public meetings and numerous workshops were held during NEPA (National Environmental Policy Act) to present the definition of alternatives and to guide the Colorado Department of Transportation and RTD in the development and evaluation of any Preferred Alternatives. Committee members primarily consisted of elected and/or appointed policy/decision-making officials from the affected areas.[12] After the adoption of the MIS, all four agencies in June 1998 signed a "partnering charter" that created a leadership team to identify and pursue the best multi-modal solutions.

To keep the public updated, a project newsletter was issued at significant project milestones. The committees remained intact during the NEPA and preliminary engineering process, and monthly meetings were held to keep them involved. Press releases and a media tour were utilized to keep the project in the media, and project displays were placed in public buildings to keep the public informed. A project website was continuously updated with the latest documents and information. Project team members met over 215 times with community groups.

By the end of 2002, the T-REX Project acquired six single-family homes, two duplexes, and two apartment buildings. It negotiated 30 total acquisitions and 172 partial acquisitions with a $100 million budget. Businesses were eligible for replacement property costs and moving costs. The T-REX Project also purchased business properties.[18]

T-REX's five-year design-build project added 19miles of light rail and improved 17miles of highway through southeast Denver, Aurora, Greenwood Village, Centennial and Lone Tree. Construction began in Fall 2001 and construction ended in December 2006, 22 months ahead of the original schedule. Additionally, light rail service along the Southeast Corridor began in late 2006.

Decision for light rail instead of HOV lanes

Light rail transit was endorsed because of the following reasons according to the T-REX factbook:

Denver Mayor John Hickenlooper believes that light rail presents an effective solution to congestion, as the addition of more highway lanes often results in rapid occupancy by additional vehicles. Due to the capacity of light rail carts in comparison to cars, increasing the capacity of the rail line can accommodate more traffic without causing a slowdown.[19] [20]

Timeline

Results

1.5e6USgal of motor fuel and related air pollution that is worth about $4 million per year is estimated to be saved due to the project.[21] The linking of I-25 into Denver's two major employment centers downtown and the Denver Tech Center where more than 200,000 people work decreased commute times for residents. Regional growth is estimated to add another 150,000 jobs in DTC and downtown over the next 20 years, according to the Denver Regional Council of Governments, a multi-county oversight group.[22] Denver Mayor John Hickenlooper and former Governor Bill Owens proposed the "Mission of Economic Development", which encourages companies to relocate to the corresponding areas developed by the T-REX project.[23] [24]

Infrastructure results

On Interstate 25:

On Interstate 225:

Similar projects

The reconstruction of Interstate 15 for the 2002 Winter Olympics in Salt Lake City, a joint development by UDOT and the Utah Transit Authority, was a model for the T-REX project.[26] The project similarly involved a combination of light-rail and roadwork. Unlike T-REX, Utah's rail line were not in the interstates right of way.

Representatives from the Arizona Department of Transportation, the Maricopa Association of Governments and the Valley Metro Rail system in Phoenix observed T-REX. Phoenix is in the early stages of a similar project on its Interstate 10 corridor, one that also involves expanding the highway and building more rail lines. While Phoenix's light-rail project will not be complete until around 2019, the highway improvements are planned to be completed in the next five years. Like T-Rex, Valley Metro plans to run its rail lines in the highway's right-of-way.[27] Wisconsin Department of Transportation has considered implementing design-build strategies into future projects.[28]

A secondary project, the FasTracks, was publicly supported during the 2004 election, which may be related to the success of the T-REX.[29]

Reception

The public was generally in favor of the project. There was some opposition from property owners who opposed the outright taking of, or encroachment onto their property. According to T-REX, relocation was supported by relocation experts. Public input did result in minor changes to the project, including light rail alignment and station locations. Political support may also have been a factor in the expediting of the project. Colorado Governor Roy Romer supported the project from the outset, and there was local political support for the implementation of the light rail. However, some local politicians and special interest groups were against the expansion of the highway.[30]

Some consider it to be one of the most successful transportation upgrade projects in the United States.[31] [32] [33] [34] It also received a National Design-Build Award from the Design-Build Institute of America.[35]

See also

External links

Notes and References

  1. Web site: 2004-11-11 . Fact Book 2003 . en . https://web.archive.org/web/20041111094231/http://trexproject.com/trex_content/about/trex_2003_factbook.pdf . 2004-11-11 . 2023-05-26.
  2. Metro Denver Development, Transportation Infrastructure, http://www.metrodenver.org/DataCenter/Infrastructure/
  3. Carter and Bergess -Managing Mega-Projects: T-REX, http://www.c-b.com/information%20center/transportation/ic.asp?issue=4&p=1&tID=23&pID=87
  4. On parallel tracks, http://americancityandcounty.com/features/government_parallel_tracks/
  5. Web site: Highways for LIFE . 2022-10-14 . Federal Highway Administration (FHWA).
  6. [Bill Owens (Colorado politician)|Bill Owens]
  7. T-REX Project Factbook, http://www.metrodenver.org/documents/T-REX%20Factbook.pdf
  8. Web site: T-REX Transportation Expansion Project - Verdict Traffic . 2022-10-14 . www.roadtraffic-technology.com.
  9. [Civil Engineering]
  10. Public Roads Magazine-Federal Highway Administration- Colossal partnership: Denver's $1.67 billion T-REX project.(Brief Article), http://www.encyclopedia.com/doc/1G1-82784226.html
  11. Public Roads Magazine- Federal Highway Administration, http://www.tfhrc.gov/pubrds/septoct01/trex.htm
  12. [US Department of Transportation]
  13. Metro Vision 2020 - Comprehensive guide for regional planning that integrates previously separate plans for growth development transportation and water quality management, http://www.drcog.org/index.cfm?page=MetroVision2020
  14. [University of Denver]
  15. In Denver's Transit Breakthrough (PDF), http://denverinfill.com/images/blog/2005-07/2005-07-06_in_denvers_transit_breakthrough.pdf
  16. Kiewit- Transportation Market Experience,http://www.kiewit.com/markets/transportation.asp
  17. Parsons Project Profile--Southeast Corridor Transportation Expansion Project (T-Rex),http://www.parsons.com/about/press_rm/potm/02-2003/index.html
  18. T-REX Factbook page 19 - Right of Way Issues, http://www.metrodenver.org/documents/T-REX%20Factbook.pdf
  19. Web site: November 2006 . 1st . 2006-11-01 . On parallel tracks . 2022-10-14 . American City and County . en-US.
  20. Hickenlooper, Owens plan California eco-devo trip, http://www.bizjournals.com/denver/stories/2003/06/23/daily38.html
  21. Web site: Denver, Sacramento, San Francisco: Light Rail Continues Vigorous Growth - Light Rail Now . 2022-10-14 . lightrailnow.org.
  22. McGraw Hill Constructor Magazine, Web site: Constructor Magazine - A publication of the AGC . November 20, 2006 . dead . https://web.archive.org/web/20061019180438/http://constructor.construction.com/coverStories/archives/2006-05.asp . October 19, 2006 .
  23. Denver Business Journal- Hickenlooper, Owens have pursued California eco-devo trips to show how companies could increase their employees quality of life by being located in Denver. http://denver.bizjournals.com/denver/stories/2003/06/23/daily38.html
  24. Denver Office of Economic Development Podcasts - Podcast #1 -Catering to the Creative Class - Denver Mayor John Hickenlooper, http://www.denvergov.org/PodcastFiles/OED/HickenlooperPodcast.mp3
  25. Mannequin that U.S. man used for carpool lane fetches $15,000 at charity auction,
  26. News: Kopytoff . Verne . 1997-11-09 . The 2002 Olympics Are Transforming Salt Lake City . en-US . The New York Times . 2022-10-14 . 0362-4331.
  27. [Valley Metro]
  28. Web site: Wisconsin Department of Transportation Research and Library . 2022-10-14 . wisconsindot.gov.
  29. What is FasTracks?, http://www.rtd-fastracks.com/main_26
  30. [Federal Highway Administration]
  31. Colorado DOT- T-REX takes top awards at national contractor convention, http://www.dot.state.co.us/Communications/News/DM2007TREX.pdf
  32. Associated General Contractors of America- Presents First-ever Grand Award to Nation's Top Project at AGC's 88th Annual Convention, http://www.agc.org/galleries/pr/07-025.doc
  33. [US Department of Transportation]
  34. T-REX team is 2004 award recipient,http://findarticles.com/p/articles/mi_m3724/is_5_68/ai_n14712958
  35. Design-Build Award Competition Winners, http://www.dbia.org/awards/Pages/Project-Awards.aspx