The Sunshine Coast Line is the current marketing name of what originally was the Tendring Hundred Railway Line, a branch off the Great Eastern Main Line in the East of England. It links to the seaside resorts of and, via a branch, . The line is part of the Network Rail Strategic Route 7, SRS 07.08, and is classified as a London & South East commuter line.[1] Passenger services on the line are currently operated by Greater Anglia.

Trains for Clacton-on-Sea usually originate at London Liverpool Street, while those for Walton-on-the-Naze typically start at Colchester (or on Sundays). There are, however, limited morning and evening peak-time services in each direction between Walton-on-the-Naze and Liverpool Street.

History

Steam era

The Great Eastern Main Line out of Shoreditch in London reached by 1843 and was extended to in 1846.

The first short section of this branch line was built by the Colchester, Stour Valley, Sudbury & Halstead Railway to the port of, and opened for freight traffic on 31 March 1847. In 1859 the Tendring Hundred Railway Company was formed to extend the line from Hythe to, which opened on 8 May 1863 for both passenger and goods services from Colchester. By the time the Wivenhoe extension opened the line had been taken over by the Great Eastern Railway (GER) who provided the rolling-stock in return for 50% of takings.

The route was extended to on 8 January 1866, to on 28 July 1866, and on to the terminus at Walton-on-Naze on 17 May 1867. In the meantime, a short branch to a new station called St. Botolph's, located more centrally in Colchester, opened on 1 March 1866. This station was renamed Colchester Town on 8 July 1991 by British Rail.[2]

A second company, the Wivenhoe & Brightlingsea Railway, had been incorporated in 1861 to build a line from Wivenhoe to, which opened on 17 April 1866. There were also proposals to build a line to Clacton as early as 1866, but nothing came of them until 1877, when the Clacton-on-Sea Railway was incorporated. The connection from to Clacton opened on 4 July 1882, also operated by the GER.

The GER negotiated to buy both the Tendring Hundred Railway and the Clacton-on-Sea Railway, and they became part of the GER on 1 July 1883. The Wivenhoe & Brightlingsea company was absorbed by the GER on 9 June 1893.[3]

In 1923 the line (along with the rest of the GER) became part of the London and North Eastern Railway.

A section of the line between Frinton and Walton-on-Naze had to be re-sited in 1929 due to fears of coastal erosion on the original alignment.[4]

Following nationalisation on 1 January 1948, the line became part of the Eastern Region of British Railways.

Electrification

Electrification of the line commenced in the 1950s and by January 1959 the line was electrified as far as . The first trial train to run on the newly electrified section departed Colchester on 18 January 1959. The line was the first in the country to be electrified at 25 kV AC, using overhead wires,[5] with electrified services inaugurated on 13 April 1959.[6] Between 1962 and 1992, services on the line were largely operated by a fleet of electric multiple units which were specially designed and constructed for the route. The 309s were replaced on the route by newer rolling stock between 1992 and 1994 during the Network SouthEast era.

Passenger services have been operated by two different franchises since privatisation of British Rail in 1997: First Great Eastern until 31 March 2004, when National Express took over with the company branded as One until February 2008, at which time it was rebranded as National Express East Anglia. It is currently operated by Abellio Greater Anglia.

Recent developments

A £104 million engineering project known as the Colchester to Clacton Resignalling Project took place on the line between December 2006 and July 2009.[7] Life-expired signalling equipment was renewed and a new control system was fitted; 170 modern LED signals were erected and eight manual level crossings were replaced by full barrier crossings with security cameras. The line was closed every weekend and on public holidays, with bus replacement services provided.[8]

There was opposition from the town of Frinton to keep the manual gates, which were reportedly removed "under cover of darkness". Folklore has it that townspeople used to lock the gates to keep out coach-loads of tourists.[9]

Infrastructure

The line is double track except for the branch between and which is single track. It is electrified at 25 kV AC, has a loading gauge of W6 and a line speed limit of between . The branch to has a maximum speed limit of .[1] The Engineer's Line Reference for the line from Colchester Junction to Clacton is COC, and from Thorpe-le-Soken Junction to Walton-on-the-Naze is TWN.[10]

Passenger train services are operated by Class 720 electric multiple units. The Walton-on-the-Naze to Colchester local services are typically formed of five carriages. The Clacton-on-Sea to London Liverpool Street services are typically formed of ten carriages.

Stations

The following table summarises the line's 12 stations, their distance measured from, and estimated number of passenger entries/exits in 2018–19:

Station Location Local authority Mileage Patronage
North ColchesterCity of Colchester4,453,178
Branch to Colchester Town:
Central ColchesterCity of Colchester54771,090
Main section to Thorpe-le-Soken:
HytheCity of Colchester265,716
WivenhoeCity of Colchester56401,240
AlresfordDistrict of Tendring62,994
Great BentleyDistrict of Tendring81,144
WeeleyDistrict of Tendring6334,908
Thorpe-le-SokenDistrict of Tendring65131,088
Branch to Clacton-on-Sea:
Clacton-on-SeaDistrict of Tendring799,344
Branch to Walton-on-the-Naze:
Kirby CrossDistrict of Tendring44,782
Frinton-on-SeaDistrict of Tendring200,904
Walton-on-the-NazeDistrict of Tendring136,708

Services

The typical Monday to Saturday off-peak service on the line is:

Notes and References

  1. Web site: Route 7 - Great Eastern. Network Rail. 2009-05-22.
  2. Book: Butt, R.V.J. . The Directory of Railway Stations . 1995 . Patrick Stephens Ltd . Yeovil . 1-85260-508-1 . R508 . 202, 65 .
  3. . September 1959 . B.W.C. . Cooke . Tothill Press Ltd . Westminster . 701 . 105 . The Great Eastern Line in the Tendring Hundred . B.D.J. . Walsh . 641 .
  4. Book: Body, Geoffrey . 1986 . PSL Field Guide - Railways of the Eastern Region - Vol 1 : Southern operating area . Wellingborough . Patrick Stephens Limited . 175 . 0-85059-712-9 .
  5. The Railway Magazine . June 1959 . B.W.C. . Cooke . Tothill Press Ltd . Westminster . 698 . 105 . High-Voltage Electrification on B.R. . 369 .
  6. The Railway Magazine . June 1959 . B.W.C. . Cooke . Tothill Press Ltd . Westminster . 698 . 105 . Clacton and Walton Electrification . 378 .
  7. Web site: More reliable railway for Essex as £100m+ upgrade is completed . Network Rail . 2 September 2009 . 8 September 2011 . dead . https://web.archive.org/web/20120329064401/http://www.networkrailmediacentre.co.uk/Press-Releases/MORE-RELIABLE-RAILWAY-FOR-ESSEX-AS-100M-UPGRADE-IS-COMPLETED-11fc.aspx . 29 March 2012.
  8. Web site: MORE RELIABLE RAILWAY FOR ESSEX AS £100M+ UPGRADE IS COMPLETED. NetworkRail. 2009-09-02. 2010-03-29.
  9. News: Frinton-on-Sea's historic railway gates removed 'under cover of darkness'. The Guardian. 2009-04-20. 2010-03-29 . London . Robert . Booth.
  10. Web site: Engineer's Line Reference.