Church Fenton railway station serves the village of Church Fenton in North Yorkshire, England. It is situated where the Cross Country Route from Leeds to York meets the Dearne Valley line from Sheffield to York, just under 10.75miles from York.

History

The York and North Midland Railway opened the first part of its route through the village (and on as far as Milford) on 29 May 1839,[1] completing it the following year. On completion of a branch from there to Harrogate via Wetherby and Tadcaster by the Y&NM in 1848 a new station on a slightly different site gave it new importance and within two years it had become a calling point on the new East Coast Main Line (ECML) from York to London with the opening of a line from Burton Salmon to Knottingley (trains then continuing via Askern and Doncaster).

Further development of the station occurred in 1869, when a 50NaN0 link was opened by the North Eastern Railway from there to Micklefield on the former Leeds & Selby Railway to create a new main line between Leeds and York. The NER had been looking to shorten the previous, indirect route between the two cities via Castleford for some time prior to this, but plans to build a line via Tadcaster had come to nothing and so this alternative route was chosen. The existing line from here to York was subsequently quadrupled to handle the increased levels of traffic and the station substantially altered, with the addition of extra platforms and connections between the two pairs of lines. The station lost its ECML status in 1871 when the new direct line from York to Doncaster via Selby was opened, but trains from London to Harrogate continued to call and yet another addition to the list of routes serving the station came in 1879 when the Swinton and Knottingley Joint Railway line via Pontefract Baghill and Ferrybridge was opened.[2] In connection with the quadrupling of the lines the present station was opened in 1904 slightly south of the second station.[3]

Today the station remains busy, even though the Harrogate line fell victim to the Beeching cuts in January 1964 and passenger trains towards Castleford ended six years later. The Leeds to York Line carries a frequent passenger service (including CrossCountry and TransPennine Express services) whilst the line towards Sherburn, Milford Junction and thence to Knottingley, Castleford and Pontefract carries large quantities of freight. Northern operates all services that call on the Leeds to York, Dearne Valley and Hull to York routes that run through the four operational platforms (a fifth on the western side, once used for Harrogate trains, is disused). Since the winter 2023 timetable update, scheduled passenger services towards Castleford, Wakefield Kirkgate and Huddersfield now pass through here once again (for the first time in over 50 years), but run through without stopping.

The station is covered by a long-line automatic P.A system to provide real-time train running details. Passenger information screens are also installed and there is a ticket machine available for passengers to buy tickets (card only) or a permit to travel (for cash fares). Access to all four platforms is via footbridge, so there is no step-free access to any of the platforms.[4] The former booking office at street level is now in private commercial use as a restaurant, but the platform level buildings were all demolished by 1990.

Services

The service levels at the station were increased significantly at the summer 2018 timetable change and modified again in December 2018 - trains on the York to Leeds line now call hourly each way throughout the day, whilst many York to Hull and trains also stop (previously only a limited peak service was provided on this route). Most Leeds-bound services normally continue through to via Bradford Interchange and run express to Leeds. A limited service (three per day) is also provided to via the Dearne Valley line.

Sundays now also see an hourly service to Leeds and either one or two per hour to York, plus seven trains to Hull and one to Selby. Most Leeds services continue to Blackpool North. One rail-replacement bus calls southbound in the early evening (pick-up only) en route to (there now being no rail service to Sheffield via Pontefract on Sundays).

Upgrade and electrification

The Transpennine Route Upgrade includes electrification from Manchester to York through Church Fenton. In May 2021 it was confirmed that electrification of the line had been approved along with other improvements.[5] The Integrated Rail Plan for the North and Midlands published in November 2021 further confirmed this upgrade.(IRP)[6] [7]

References and notes

Notes and References

  1. Body, p. 53
  2. Body, p .54
  3. http://www.disused-stations.org.uk/c/church_fenton/index.shtml Disused Stations - Church Fenton
  4. http://www.nationalrail.co.uk/stations/CHF/details.html Church Fenton station facilities
  5. Web site: Government announces £317m in Transpennine Route Upgrade investment. 26 May 2021. Rail Technology Magazine. 26 May 2021. https://web.archive.org/web/20210526094806/https://www.railtechnologymagazine.com/articles/government-announces-ps317m-transpennine-route-upgrade-investment. live.
  6. Web site: 18 November 2021. Integrated Rail Plan for the North and Midlands. Department for Transport. 978-1-5286-2947-8. live. UK Government. 18 November 2021. 18 November 2021. https://web.archive.org/web/20211118113149/https://assets.publishing.service.gov.uk/government/uploads/system/uploads/attachment_data/file/1034360/integrated-rail-plan-for-the-north-and-midlands.pdf.
  7. Web site: Media. Insider. Trans-Pennine Route Upgrade project moving to next phase. 22 March 2021. Insider Media Ltd. 17 May 2022. https://web.archive.org/web/20220517174846/https://www.insidermedia.com/news/north-west/trans-pennine-route-upgrade-project-moving-to-next-phase. live.