Xi'an–Chongqing high-speed railway 西渝高速铁路 | |
Status: | Planned |
Start: | Xi'an East |
End: | Chongqing West / Wanzhou North |
Operator: | China Railway High-speed |
Linelength: | 6530NaN0 |
Speed: | 3500NaN0 |
The Xi'an–Chongqing high speed railway[1] is a planned railway line in China. It is 653km (406miles) long and has a design speed of 350km/h.[2] It will be part of the Baotou (Yinchuan)–Hainan corridor.[3]
Work on the 170.420NaN0 section between Xi'an and Ankang began on 29 June 2021.[4] It is expected to be completed by June 2026.[5] Construction on the remaining section between Ankang and Chongqing is expected to begin in the second half of 2022.[6]
--! colspan="2" | Route--> | Station №--> | Station Name[7] | Chinese | Distance --> | CR transfers/connections | Metro transfers/connections | Location--> | ||
---|---|---|---|---|---|---|---|---|---|---|
Chongqing West | ||||||||||
Beibei South | ||||||||||
Hechuan East | ||||||||||
Guang'an East | ||||||||||
Dazhu | ||||||||||
Dazhou South | Chengdu–Dazhou–Wanzhou high-speed railway | |||||||||
Xuanhan South | ||||||||||
Fankuai | Branch line | |||||||||
Chengkou | ||||||||||
Langao | ||||||||||
Ankang West | ||||||||||
Tongmu | ||||||||||
Zhen'an West | ||||||||||
Zhashui West | ||||||||||
Taihe | ||||||||||
Xi'an East |
The Branch line runs from Fankuai railway station in Xuanhan County, Sichuan Province to Wanzhou North railway station in Wanzhou District, Chongqing.
--! colspan="2" | Route--> | Station №--> | Station Name | Chinese | Distance --> | CR transfers/connections | Metro transfers/connections | Location--> | ||
---|---|---|---|---|---|---|---|---|---|---|
Fankuai | Main line | |||||||||
Kaizhou | ||||||||||
Wanzhou North |