Chongqing–Guiyang railway explained

Chongqing–Guiyang railway
Native Name:渝贵铁路
Status:Operating
Locale:Chongqing and Guizhou Province, China
Routes:1
Open:January 25, 2018
Linelength:3450NaN0
Speed:200km/h
Map State:collapsed

Chongqing–Guiyang railway is a major trunk higher-speed rail selected for construction under the 11th Five Year Plan set by the Chinese Government. Construction started on December 22, 2010, and opened on January 25, 2018.[1]

Profile

The railway extends from Chongqing to Guizhou for a total length of 3450NaN0. Of this, are within Chongqing and within Guizhou Province. The total investment amounted to around 44.92 billion RMB. The design corresponds to national level I railway standards; the line is electrified and double-track. The design speed is and the foreseen operational speed is . The main function of this railway is passenger, express freight, and container transport.

The line forms part of a larger network of railways such as the Chongqing–Lanzhou railway and the Guiyang–Guangzhou high-speed railway, fast becoming another important access route to the sea. Trains run from Chongqing to Guiyang in two hours and from Chongqing to Guangzhou in six hours. It improves the north–south movement of passengers and fast freight along the railway transport corridor while also relieving pressures and increasing capacities on existing conventional railway lines in the region. It is seen as a potential catalyst for economic development in several impoverished areas, especially in Guizhou, one of the poorest provinces of China.

The line forms part of the Baotou (Yinchuan)–Hainan corridor. A parallel Chongqing–Guiyang high-speed railway is planned in the medium or long term.

Route

Starting in Chongqing's Shapingba District at Chongqing West railway station, the line passes through Qijiang, Tongzi, Zunyi, and Xifeng and terminates at Guiyang North railway station.

The Chongqing–Guizhou railway follows a route generally similar to that of the older Sichuan–Guizhou railway, constructed in 1956–65; however due to the more extensive use of tunnels (145 of them), the new line is significantly shorter (instead of).[2]

Stations

Notes and References

  1. News: 渝贵铁路、重庆西站、沙坪坝站25日开通,乘车出行的你千万别走错地方!. Chongqing Morning News. 2018-01-19. 2018-01-19. zh. https://web.archive.org/web/20180119120304/http://www.sohu.com/a/217558021_349048. 2018-01-19. dead.
  2. Web site: 渝黔铁路预计2017年底建成.重庆7小时到香港. Construction of the Yu-Qian Railway is anticipated to be completed by the end of 2017. Chongqing to Hong Kong in 7 hours. January 5, 2015. CQNews.