China Railway CRH2 EMU | |
Background: |
|
Service: | 2007–present |
Manufacturer: | Kawasaki Heavy Industries, CRRC Qingdao Sifang |
Family: | Shinkansen (E2 series) |
Numberbuilt: | CRH2A: 60+40 trainsets (800 cars) CRH2B: 20 trainsets (320 cars) CRH2C (stage 1): 30 trainsets (240 cars) CRH2C (stage 2): 20 trainsets (160 cars) CRH2E: 20 trainsets (320 cars) |
Formation: | CRH2A: 8 cars per trainset (4M4T) CRH2B/E: 16 cars per trainset (8M8T) CRH2C: 8 cars per trainset (6M2T) |
Capacity: | CRH2A: 610/571/562/588/600/608 CRH2B: 1230 CRH2C: 610/626 CRH2E: 630/880(CRH2E-2463, 2464 and 2465) |
Operator: | China Railway - CR Beijing - CR Shanghai - CR Jinan - CR Xi'an - CR Wuhan - CR Nanchang - CR Zhengzhou - CR Taiyuan - CR Chengdu - CR Guangzhou - CR Nanning |
Lines: | Most 200-250km/h high speed rail lines across China, plus some conventional lines |
Trainlength: | CRH2A/C: 201.4m (660.8feet) CRH2B/E: 401.4m (1,316.9feet) |
Width: | 3380mm |
Height: | 3700mm |
Platformheight: | 1250mm |
Maxspeed: | CRH2A/B/E: 250km/h CRH2C (stage 1): 300km/h CRH2C (stage 2): 350km/h |
Traction: | Water cooling IGBT–VVVF inverter control (CRH2B/E: Mitsubishi Electric type MAP-304-A25V141, CRH2A/C: Hitachi type CII-HHR1420A/B/D, Zhuzhou CSR Times Electric type TGA10/10A/10E/10G) |
Traction Motors: | 3-phase AC induction motors (CRH2B/E: Mitsubishi Electric type MB-5120-A, Zhuzhou CSR Times Electric type MT-205 CRH2A/C: Hitachi/CRRC Yongji Electric type YJ-92A, Zhuzhou CSR Times Electric type YQ-365) |
Poweroutput: | CRH2A: 4.80NaN0 CRH2B/E: 9.6MW CRH2C:
|
Transmission: | AC-DC-AC |
Electricsystem: | Overhead catenary |
Collectionmethod: | Pantograph |
Brakes: | Regenerative, electronically controlled pneumatic brakes |
The CRH2 Hexie is one of the high-speed train models in China. The CRH2 is based on the E2-1000 Series Shinkansen design from Japan with the license purchased from a consortium formed of Kawasaki Heavy Industries, Mitsubishi Electric, and Hitachi, and represents the second Shinkansen train model to be exported.
In 2004, the Ministry of Railway in China purchased an initial 60 sets of the train from Kawasaki Heavy Industries with a maximum speed of 250km/h. However, the newer versions of the CRH2 are not related to the E2-1000 Series despite having the same exterior shell.[1]
On October 20, 2004, the Ministry of Railway in China ordered 60 sets of CRH2A trains from Kawasaki Heavy Industries in Japan. Along with 60 sets of Bombardier's Regina-based CRH1A, and 40 sets of Alstom's Pendolino-based CRH5A, these train sets are consider as first batch of CRH trains.
Each of the CRH2A set consists of 8 cars. The first 3 sets (CRH2-001A - CRH2-003A) were built in Japan, the next 6 sets (CRH2-004A - CRH2-009A) were delivered in complete knock down form and assembled by CSR Sifang Locomotive and Rolling Stock. The remaining 51 sets (CRH2-010A - CRH2-060A) were built by Sifang through technology transfer from Japan.
The first train arrived at Qingdao port on March 8, 2006, with little fanfare, and was not even publicized in China. These trains have a maximum operation speed of 2500NaN0 and started providing high-speed train service from April 18, 2007, the date of the sixth national railway speed-up.
According to Chinese and Japanese media, CRH2A trains started test trials ahead of commercial operation on the Shanghai-Hangzhou and Shanghai-Nanjing lines on January 28, 2007.
On September 14, 2010, the Chinese MOR ordered additional 40 sets of CRH2A trains (CRH2-151A - CRH2-190A) from CSR Sifang.
In November 2007, the Ministry of Railway in China ordered 10 CRH2 sets with 16 cars per set (8M8T). These trains have been given designations CRH2B (CRH2-111B - CRH2-120B). Each CRH2B has three 1st seating cars (ZY), twelve 2nd seating cars (ZE), and one dining car (CA). Designed maximum operation speed is 2500NaN0 with a power of 9600kW.
The first units were delivered on June 29, 2008,[2] [3] and came into service on the Hefei–Nanjing Passenger Railway on August 1, 2008.[4]
After the introduction of the modified E2-1000 Series, Sifang built its own CRH2 with a maximum safe operating speed of 350km/h. The original train sets imported from Kawasaki had a maximum safe operating speed of 250km/h.
During June 2005 and September 2005, The Chinese Ministry of Railways launched bidding for High speed trains with a top speed over 300km/h. Along with Siemens's Velaro-based CRH3C, CSR Sifang bid 60 sets of CRH2C, includes 30 sets of CRH2C stage one with a top speed of 300km/h, and 30 sets of CRH2C stage two with a top speed of 350km/h.
In development and research of the 350km/h high speed train, The CRH2-300 project was launched by Chinese MOR and CSR. In 2006 the China Development Bank provided CNY 15 billion developmental financial loans to CSR Group for the projects of NaN0NaN0 high speed trains.[5] Over 50 academics, 150,000 technicians, 600 contractors were involved in the project.[6] This train's livery is not like the CRH2A, which the blue stripe does not end at the fronts of trainsets.
CRH2C Stage one is a modified version of CRH2A. It has a maximum operating speed up to 300km/h by replacing two intermediate trailer cars with motorized cars. Equipped with an array of the state-of-the-art technologies, including aluminum alloy body with a reduced weight, high speed turntable, high speed pantograph, and optic-fiber based integrated control system.[7]
Chinese MOR ordered 30 sets of CRH2C stage one, name code CRH2-061C - CRH2-090C. The first set, CRH2-061C was unveiled on December 22, 2007.[8] [9]
During the test on April 22, 2008, CRH2-061C reached a top speed of over 3700NaN0 on Beijing-Tianjin high-speed rail.[10]
During the test on December 11, 2009, CRH2-061C reached a top speed of 394.2km/h on Zhengzhou-Xi'an high-speed rail.[11]
Together with CRH3C, the CRH2C stage one first came into service on Beijing-Tianjin Intercity high-speed rail on August 1, 2008, and all CRH2C stage one trains have been replaced by CRH3C in April, 2009. Currently, most of these trains are serving on the Shanghai-Nanjing high speed rail.
CRH2C Stage two is the "re-design" version of the CRH2. Some of the details, like the aluminum body structure, noise reduction technology & reduction technique, draw on the CRH3C.And cancelled the driver's door. According to CSR Sifang, the improvements include the following aspects:
Chinese MOR ordered 30 sets of CRH2C stage two, name code CRH2-091C - CRH2-110C and CRH2-141C - CRH2-150C. The first set, CRH2-091C was unveiled in January 2010 and came into service on Zhengzhou-Xi'an high-speed rail in February, 2010.[13]
In November and December 2007, the Ministry of Railway in China ordered 20 CRH2 sleeper trains with 16 cars per set (8M8T). These trains are modified CRH2Bs, outfitted with traditional railway sleeping berths (couchette car) and have been given designations CRH2E (numbered CRH2-121E - CRH2-140E).Each CRH2E has thirteen 1st class sleeping cars (WR), two 2nd class seating cars (ZE), and one buffet car (CA) or one second class/dining car (ZEC). Designed maximum operation speed is 2500NaN0 with 9600kW of power output.
The first batch of CRH2E, CRH2-121E - CRH2-126E, came into service on Beijing-Shanghai railway on December 21, 2008.[2] [14] On 23 July 2011, one sleeper coach on CRH2-139E trainset has been derailed in the 2011 Wenzhou train collision, together with CRH1-046B.
The rest of CRH2Es were deployed on Beijing–Guangzhou–Shenzhen–Hong Kong High-Speed Railway since January 2015, operating overnight sleeper trains between Beijing and Guangzhou (including some trains to Shenzhen).
A brand new variant of the CRH2E entered service in 2017 numbered beyond CRH2E-2463.[15] [16] Instead of a traditional railway sleeping berth the sleeper train is organized with the corridor running down the middle of the train car with double deck "capsules" on each side.[17] Each capsule is similar in layout to airplane first class, and passengers are no longer sharing the room. Each capsule comes with independent tables, outlets, lamps, hangers and curtains. The body of the train is redesigned to reduce noise levels during travel. The trains have been dubbed "moving hotels".[18]
CRH2G is a specialized cold and sand/windstorm resistant version of the CRH2 manufactured by CRRC Qingdao Sifang. The trains were tested on the Lanzhou–Xinjiang HSR and Harbin–Dalian HSR.[19] Tests where completed on November 10, 2015, and the first sets were assigned to Lanzhou–Xinjiang HSR.[20]
See main article: article and China Railways CRH380A. In 2008, the Chinese MOR & CSR launched CRH2-380 project, the main purpose is to develop new-generation of high speed trains with maximum operation speed of 380km/h. CRH2 is one of the fundamental platforms of the new trains, which is designated as CRH380A.
At the time of the sixth national railway speed-up, at least 37 CRH2A sets had been delivered by Kawasaki and Sifang.[21] In 2008, all 60 CRH2A sets had been delivered by Kawasaki. The post-2008 production model of the CRH2 are designed and made solely by Sifang with a maximum safe operation speed of 350km/h.[1]
Power Destination
Coach Type
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
Type | ZE | ZEC | ZE | ZY | ZE | ||||
Type | ZE | ZY | ZE | ZEC | ZE | ZY | ZE | ||
Type | ZE | ZET | ZE | ZEC | ZE | ZY | ZE | ||
Type | ZYS | ZE | ZE | ZEC | ZE | ZYT | |||
Type | ZY | ZE | ZEC | ZE | ZY | ||||
Type | ZE | ZEC | ZY | ZE | |||||
Type | ZE | ZYE | ZE | ZEC | ZE | ZY | ZE | ||
Type | ZY | ZE | ZEC | ZE | |||||
Power Configuration | TC | M | TP | T | MP | M | TC | ||
Power Units | Unit 1 | Unit 2 | |||||||
Capacity | 55 | 100 | 85 | 100 | 55 (+16) | 100 | 51 | 64 | |
Capacity | 55 | 100 | 46 | 100 | 55 (+16) | 100 | 51 | 64 | |
Capacity | 55 | 100 | 43+16 | 100 | 55 (+16) | 100 | 51 | 64 | |
Capacity | 15+4 | 51+4 | 85 | 100 | 55 (+16) | 100 | 24+4 | ||
Capacity | 42 | 78 | 85 | 100 | 55 (+16) | 100 | 51 | ||
Capacity | 55 | 100 | 85 | 100 | 55 (+16) | 78 | 51 | 64 | |
Capacity | 55 | 100 | 16+43 | 100 | 71 | 100 | 51 | 64 | |
Capacity | 48 | 90 | 90 | 77 | 63 | 90 | 90 | 65 |
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
Type | ZE | ZEC | ZE | ZY | ZE | ||||
Type (EC) | ZY | ZE | ZEC | ZE | |||||
Power Configuration | TC | M | MP | M | MP | M | TC | ||
Power Units | Unit 1 | Unit 2 | |||||||
Capacity | 55 | 100 | 85 | 100 | 55 (+16) | 100 | 51 | 64 | |
Capacity (EC) | 48 | 90 | 90 | 77 | 63 | 90 | 90 | 65 |
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | ZY | ZE | CA | ZE | |||||||||||||
Power Configuration | TC | M | TP | T | M | T | M | T | TP | M | TC | ||||||
Power Units | Unit 1 | Unit 2 | Unit 3 | Unit 4 | |||||||||||||
Capacity | 36 | 68 | 51 | 100 | 85 | 100 | 85 | (32) | 85 | 100 | 85 | 100 | 85 | 100 | 85 | 65 |
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
Type | ZE | ZEC | ZE | ZY | ZE | ||||
Power Configuration | TC | M | MP | M | MP | M | TC | ||
Power Units | Unit 1 | Unit 2 | |||||||
Capacity | 55 | 100 | 85 | 100 | 55+16 | 100 | 51 | 64 | |
Capacity | 55 | 100 | 85 | 100 | 54+16 | 100 | 51 | 65 |
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Type | ZE | WR | CA | WR | ZE | ||||||||||||
Type | ZE | WR | WRC | WR | ZE | ||||||||||||
Type | WR | WRC | WR | ||||||||||||||
Power Configuration | TC | M | TP | T | M | T | M | T | TP | M | TC | ||||||
Power Units | Unit 1 | Unit 2 | Unit 3 | Unit 4 | |||||||||||||
Capacity | 55 | 40 | (0) | 40 | 40 | 55 | |||||||||||
Capacity | 55 | 40 | 20 | 55 | |||||||||||||
Capacity | 40 | 60 | 20 | 60 | 40 |
Coach No. | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | |
---|---|---|---|---|---|---|---|---|---|
Type | ZY | ZE | ZEC | ZE | |||||
Power Configuration | TC | M | MP | M | MP | M | TC | ||
Power Units | Unit 1 | Unit 2 | |||||||
Capacity | 48 | 90 | 77 | 63 | 90 | 65 |
See main article: Wenzhou train collision.
On July 23, two bullet trains were traveling in the same direction and the train in front, the CRH 1-046B was stopped by a or a faulty signal hit by lightning. The light that the second train was supposed to stop at was hit by lightning, malfunctioned and showed a green signal while it was supposed to be red. The second train was a CRH 2-139E. The CRH2 front cars fell off the viaduct and one standing at a 90° angle between the viaduct and the ground. The cars that fell to the ground are cars 1-3 and the fourth one was the one standing.
Operator | Quantity | Serial number | Depot | Notes | |
---|---|---|---|---|---|
Wuhan Railway Bureau | 22 | 2011、2013、2033、2034、2039、2043、2045~2048、2050、2051、2053、2055、2169、2179、2180、2200、2205、2206、2209、2210 | Hankou | ||
26 | 2017、2019、2022、2023、2027、2029、2035、2049、2052、2054、2056、2059、2060、2151、2152、2162~2164、2173、2192、2193、2199、2201、2207、2208、2211 | Wuhan | |||
Shanghai Railway Bureau | 37 | 2001、2003、2005~2007、2009、2012、2015、2020、2024、2028、2031、2044、2057、2058、2153、2154、2159、2161、2166~2168、2174~2177、2181~2184、2186、2187、2189、2194~2196、2203 | Shanghai South | ||
35 | 2002、2004、2008、2014、2016、2018、2021、2025、2026、2030、2032、2036~2038、2040~2042、2155~2158、2160、2165、2170~2172、2178、2185、2188、2190、2191、2197、2198、2202、2204 | Nantong | |||
Nanchang Railway Bureau | 19 | 2215~2218、2233、2236、2237、2246、2249、2250、2252、2257、2260、2261、2284、2285、2290、2429、2430 | Nanchang | ||
20 | 2212~2214、2220~2224、2247、2248、2251、2253~2256、2259、2291~2293、2302 | Nanchang West | |||
18 | 2219、2235、2282、2283、2324、2427、2447、2452、2457、2458、4006、4012、4013、4045、4047~4050 | Xiamen North | |||
7 | 2234、2258、2451、2453、2454、4008、4046 | Fuzhou South | |||
22 | 2271、2275、2326、2434~2437、2440~2442、2446、2455、2456、2476、2477、2493、2494、4009、4014~4017 | Longyan | |||
Chengdu Railway Bureau | 25 | 2230、2305、2321、2323、2335、2336、2338~2340、2385、2390、2438、2480~2482、2490、2491、4007、4022、4035~4040 | Chongqing North | ||
8 | 2228、2231、2304、2325、2373、2492、4023、4042 | Chongqing West | |||
13 | 2272、2333、2337、2360、2363、2364、2374、2391、2392、2395~2397、4020 | Guiyang North | |||
Nanning Railway Bureau | 55 | 2238、2240~2245、2262、2263、2269、2270、2276、2279、2281、2286、2287、2296、2297、2301、2303、2312~2314、2327、2328、2346~2348、2370、2371、2375、2377、2378、2383、2386、2387、2393、2394、2398、2399、2401、2404、2407、2443~2445、2450、4018、4027、4031、4032、4069、4071、4114、4115 | Nanning | ||
35 | 2239、2266、2277、2278、2280、2288、2289、2300、2306、2307、2366~2369、2376、2384、2400、2402、2412、2413、2431~2433、2439、4034、4041、4043、4068、4070、4116~4121 | Guilin North | |||
Taiyuan Railway Bureau | 20 | 2294、2295、2308~2311、2316~2319、4122~4131 | Taiyuan | ||
Guangzhou Railway Bureau | 21 | 2274、2298、2320、2330、2331、2341、2349、2350、2380、2381、2389、2403、2405、2416、2474、2488、4002、4004、4025、4056、4067 | Guangzhou South | ||
26 | 2299、2329、2343、2344、2372、2379、2382、2388、2408、2409、2428、2448、2473、2475、2478、2479、2487、2495、2497、4003、4024、4060、4062~4064、4066 | Foshan West | |||
6 | 2449、2496、2498、4055、4061、4065 | Changsha | |||
Jinan Railway Bureau | 22 | 2225~2227、2267、2268、2332、2334、2361、2362、2365、2410、2411、2414、2415、2459、2483、2485、2486、4010、4011、4051、4052 | Qingdao | ||
10 | 2345、2352~2359、2484 | Jinan | |||
Kunming Railway Bureau | 43 | 2229、2232、2264、2265、2273、2315、2322、2342、2351、2406、2460、2489、2499、2828、4001、4005、4019、4021、4026、4028~4030、4033、4044、4053、4054、4057~4059、4082~4095 | Kunming South | ||
China Railway Corporation | 1 | 2010 | 200~250km/h comprehensive inspection train | ||
CRH2B | |||||
Shanghai Railway Bureau | 10 | 2111~2120 | Nanjing | ||
Wuhan Railway Bureau | 17 | 2466~2472、4096~4105 | Hankou | ||
CRH2C | |||||
Shanghai Railway Bureau | 57 | 2062~2067、2069~2110、2141~2149 | Nanjing | ||
China Railway Corporation | 3 | 2061, 2068, 2150 | Track Inspection Train | ||
CRH2E | |||||
Beijing Railway Bureau | 17 | 2122~2126、2128、2130~2135、2137、2138、2463~2465 | Beijing South | ||
Guangzhou Railway Bureau | 5 | 2121、2127、2129、2136、2140 | Shenzhen | ||
2 | 2461、2462 | Foshan West | |||
China Railway Corporation | 1 | 2139 | Retired | CRH2E-2139 was severely damaged after Wenzhou train collision on 23 July 2011. Carriages 1 to 5 scrapped after derailment, Carriages 6 to 10 dismantled by MOR, and Carriages 11 to 16 transformed into inspection trains. | |
CRH2J | |||||
China Railway Corporation | 1 | 0205 | Comprehensive inspection trains in orange livery |