Chhota Udaipur–Dhar line explained

Box Width:28em
Chhota Udaipur–Dhar line
Status:Partiailly Operational
Open:
(Chhota Udaipur–Alirajpur section)
Tracklength:1570NaN0
Tracks:1
Speed:up to 80km/h
Map State:collapsed

The Chhota Udaipur–Dhar line is a railway line under construction from Chhota Udaipur railway station to Dhar railway station. It is a part of Western Railway zone of Indian Railways.

This corridor passes through the ranges of Chhota Udaipur Hills in Gujarat and Sondwara Plateau in Madhya Pradesh. It will play an important role in directly connecting Vadodara and Indore and also it's a joint project of Indore–Dahod line. It will put Dhar first time on the railway line. This was demanded over decades by the residents of Nimar region as well as Central Gujarat.[1]

It's also an important tourism destination by rail after connecting with Alirajpur and Dhar. Where Alirajpur is famous for wood carvings and mango farms, Dhar is famous for historical tourist destinations.

Main line sections

This line is divided into two sections:[2]
1) The first section is of Chhota Udaipur–Alirajpur section with the length of .
2) The second section is of Alirajpur–Dhar section with the length of .[3]

Stations

Chhota Udaipur–Dhar line
Station NameStation CodeFrom AhmedabadConnections
1 CTD 205.2 Km Miyagam Karjan–Chhota Udaipur line
2Padaliya Road PLRD 214.5 Km None
3 MTSI 227.5 KmNone
4Ambari Richhavi ABRV 239.6 Km None
5 ARPR 253.7 Km None
5Khandala KADA 263.5 Km None
6Jobat JOBAT 273.9 KmNone
7Dekakund --- --- None
8Kakarwa --- --- None
9Tanda Road --- --- None
10Kodi --- --- None
11Jamaniya --- --- None
12Maphatpura --- --- None
13 DHAR 362.2 Km Indore–Dahod line

Projects

In 2014, Prime Minister's office has given clearance to this line and report was forwarded to Ministry of Railway. As a report of the line was sent to railway ministry for the railway line from Khandwa to Dhar via Khargone and Barwani by Government of Madhya Pradesh and was against considered for 2008-09 railway budget for survey.[4] [5] This railway line will be laid on 157-km Chhota Udaipur-Dhar rail line was that to be built at a cost .[6]

Currently, the first section of this line was opened on 30 October 2019 and a passenger train on this route also started running.[7] The second section of this line is partly constructed upto Jobat. Jobat Railway station is 274km (170miles) from Ahmedabad & 174km (108miles) from Vadodara

External links

Notes and References

  1. Web site: MP tribal areas off India's rail map - Times of India. timesofindia.indiatimes.com. 2016-03-18.
  2. Web site: Poor rail connectivity hits industrialisation in MP | india | Hindustan Times. Hindustan Times. 2016-03-18.
  3. Web site: Rathwa writes to PM on stalled rail projects linking MP, Gujarat. Zee News. 2016-03-18.
  4. Web site: Status report on Khandwa-Dhar railway line sought - Times of India. timesofindia.indiatimes.com. 2016-03-18.
  5. Web site: Khandwa-Dhar rail link: PMO acts to bring long-pending project on track - Times of India. timesofindia.indiatimes.com. 2016-03-18.
  6. Web site: Western Railway . wr.indianrailways.gov.in. 2016-03-18.
  7. https://www.naidunia.com/madhya-pradesh/alirajpur-inauguration-of-first-train-from-chhota-udaipur-to-alirajpur-3292681 naidunia.com