Chhabra Power Plant | |
Country: | India |
Location: | Chowki Motipura (Village), Baran, Rajasthan |
Coordinates: | 24.6236°N 77.0383°W |
Status: | O |
Operator: | RVUNL |
Th Fuel Primary: | Coal |
Ps Units Operational: | 6 |
Ps Electrical Capacity: | 2320.00 MW |
Commissioned: | 2010 |
Extra: | Source: Chhabra Thermal Power Plant |
Chhabra Thermal Power Plant is one of Rajasthan's coal fired power plants. It is located at Chowki Motipura (Village) of tehsil Chhabra in Rajasthan's Baran district.[1] The planned capacity of power plant is 2320 MW.
Stage | Unit Number | Installed Capacity (MW) | Date of Commissioning | Status | |
---|---|---|---|---|---|
Stage I | 1 | 250 | 2009 October | Running | |
Stage I | 2 | 250 | 2010 May | Running | |
Stage II | 3 | 250 | 2013 December | Running | |
Stage II | 4 | 250 | 2014 July | Running [2] | |
Stage III | 5 | 660 | 2016 Oct | Running (EPC by L&T POWER) [3] | |
Stage III | 6 | 660 | Nov2018 | (EPC BY L&T POWER) Running |