Chhabra Village | |
Native Name Lang: | Hadoti |
Other Name: | Chhabra |
Settlement Type: | city |
Pushpin Map: | India Rajasthan#India |
Pushpin Label Position: | right |
Pushpin Map Caption: | Location in Rajasthan, India |
Coordinates: | 24.67°N 76.83°W |
Subdivision Type: | Country |
Subdivision Name: | ![]() |
Subdivision Type1: | State |
Subdivision Name1: | Rajasthan |
Subdivision Type2: | District |
Subdivision Name2: | Baran |
Unit Pref: | Metric |
Elevation M: | 321 |
Population Total: | 32285 |
Population As Of: | 2011 |
Population Density Km2: | auto |
Demographics Type1: | Languages |
Demographics1 Title1: | Official |
Demographics1 Info1: | Hindi |
Timezone1: | IST |
Utc Offset1: | +5:30 |
Area Code: | 07452 |
Postal Code: | 325220 |
Registration Plate: | Rj28 |
Iso Code: | RJ-IN |
Chhabra is a city and a municipality in Baran district in the state of Rajasthan, India, near to the border with Madhya Pradesh. Chhabra is a historic walled city with a fort. Its name comes from the six gates in the walls.
Chhabra is located at .[1] It has an average elevation of 321 metres (1053 feet). Chhabra is connected with broad gauge line and is well connected to Jaipur, Kota, Indore, Jabalpur etc. by Express and Passenger trains.
India census,[2] Chhabra had a population of 32,285. Males constitute 52.172% of the population and females 47.827%. Literacy rate of Chhabra city is 72.84% higher than state average of 66.11%. In Chhabra. Male literacy is around 82.09% while female literacy rate is 62.87%.Population of Children with age of 0-6 is 4649 which is 14.40% of total population of Chhabra (M). In Chhabra Municipality, Female Sex Ratio is of 917 against state average of 928. Moreover, Child Sex Ratio in Chhabra is around 857 compared to Rajasthan state average of 888.
Hadoti is the most spoken language of the city followed by Hindi.
Chhabra has a thermal power plant which is operational. The second phase (4 X 250 MW) and (2 X 660) of the Thermal Power Plant is in running condition. This plant is owned by RRVUNL and as per information available on the web site of RRVUNL the second phase is likely to become operational in December 2011. The proposed capacity of thermal power plant is 2,320 MW now.
Chhabra (Rajasthan Assembly constituency)