Chennai HSCTC explained

Country:IND
Chennai High Speed Circular Transportation Corridors
Cities:Chennai
Alternate Name:Adyar corridor, North Buckingham Canal corridor, Central Buckingham Canal corridor, Connectivity corridor, East Coast elevated expressway, Chennai bypass corridor, Chennai Port–Maduravoyal corridor, Mambalam Canal corridor, Inner Ring Road corridor
Formed:2009
History:First corridor: Chennai Port–Maduravoyal corridor; scheduled for completion in 2013
Length Km:107.795
Length Round:3

Chennai High Speed Circular Transportation Corridors (HSCTC) is an urban road transit in the form of elevated concentric beltways planned for the city of Chennai. The beltways are envisaged as an elevated 2-tier system with design speed of 80 km/h. The top tier is a 2-lane dedicated corridor for the Chennai BRTS system. The second tier is a 4-lane road for 4-wheelers (no buses and autos).[1]

Beltways

Four beltways have been proposed, which cover a distance of 107.795 km. A connectivity corridor is also proposed to integrate the beltways with the ECR elevated expressway.

Beltway 1

Beltway 1 is the outermost beltway encompassing an area of 167 km2. It is formed by the following corridors.

Beltway 2

This beltway encompasses an area of 52 km2. It is formed by the following corridors.

Beltway 3

This beltway encompasses an area of 30 km2. It is formed by the following corridors.

Beltway 4

The beltway 4 is formed by the following corridors.

Integrating beltways with elevated expressways

  1. Already under construction by NHAI

Corridor details

These 4 beltways can be broken down into 9 corridors.

NameTypeAlong/acrossFromToviaLength (km)Cost in INR crores (estimated)StatusDeveloped byCompletion
Adyar corridorElevated 2-tier corridorSouthern banks of Adyar RiverThiru-vi-ka BridgePorurNandambakkam15.8451430ProposedAdyar Poonga Trust2013 (estimated)
Port-Maduravoyal corridorElevated corridorBanks of Cooum RiverChennai PortMaduravoyal191655[2] /2090[3] Under Construction[4] [5] NHAI2012
Chennai bypass corridorFully access-controlled at grade 4-lane corridor with 2-lane elevated BRTS corridor along the medianTambaramManaliMaduravoyal32CompleteNHAI2010
North Buckingham Canal corridorElevated corridorWestern bank of Buckingham Canal, Wall Tax Road, Poonamallee High Road, Flag Staff RoadManali Oil Refinery Road (MORR)War MemorialChennai Central12.3740ProposedAdyar Poonga Trust
Central Buckingham Canal corridorElevated corridorWestern Bank of Buckingham CanalSwami Sivananda SalaiRadhakrishnan Salai2.860170ProposedAdyar Poonga Trust
Connectivity corridorElevated corridorECR Elevated Expressway, Santhome bypass road, Santhome High Road, Greenways RoadRadhakrishnan SalaiThiru-vi-ka BridgeForeshore Estate5.140350ProposedAdyar Poonga Trust
Mambalam Canal corridorElevated corridorMambalam CanalAdyar corridorG.N. Chetty RoadAnna Salai, South Usman Road, Venkatnarayana Road, Theyagaraya Road5.000195ProposedAdyar Poonga Trust
Inner Ring Road corridorAt-grade 8-lane corridorInner Ring RoadJafferkhan BridgeKoyambeduAshok Nagar5.9525At-grade corridor coz of elevated corridor 2 of Chennai Metro that is under construction along the same alignment.Adyar Poonga Trust
East Coast Elevated ExpresswayElevated corridorEast CoastLight HouseECRBesant Nagar9.7430* (1st phase)Proposed[6] Tamil Nadu State Highways2013 (estimated)
Entire HSCTC107.7955400#

* Revised cost during tender process # Excluding cost of Chennai bypass corridor

Chennai Port–Maduravoyal corridor [19 km]

See main article: Chennai Port–Maduravoyal Expressway.

This 19 km corridor is implemented under Phase-VII [7] of National Highways Development Project by NHAI. The pre-construction work has already begun.

Chennai bypass corridor [32 km]

See main article: Chennai bypass.

The Chennai bypass corridor is a 32 km fully access controlled at-grade corridor. A 2-lane elevated BRTS corridor is proposed along the median of the Phase II of this expressway. The corridor is under construction.

Adyar corridor [15.845 km]

Section I

Section II

North Buckingham Canal corridor [12.3 km]

Section I

Section II

Section III

Section IV

Central Buckingham Canal corridor [2.860 km]

Inner Ring Road corridor [5.9 km]

Mambalam Canal corridor [5 km]

Connectivity corridor [5.140 km]

East Coast elevated expressway [9.7 km]

See main article: East Coast Elevated Expressway.

This is 9.7 km elevated expressway along the east coast of Bay of Bengal from Light House, Chennai to East Coast Road via Besant Nagar.

Interchanges

A total of 15 interchanges has been proposed along the HSCTC alignment of which 3 are already under construction by NHAI. A 3-tier interchange at Irumbuliyur is already functional.

Adyar corridor interchanges (6)

Chennai bypass corridor interchanges (2)

See main article: Irumbuliyur Junction and Madhavaram Junction.

Chennai Port–Madhuravoyal elevated expressway interchanges (2)

See main article: Maduravoyal Junction and Koyambedu Junction.

North Buckingham Canal corridor interchanges (2)

Mambalam Canal corridor interchanges (1)

East Coast elevated expressway interchanges (2)

Project status

2008

January:

November:

2009

28 May:

31 May:

3 June:

16 June:

12 August:

26 August:

2010

July 2010:

See also

Notes and References

  1. http://www.tnudf.com/index.asp Tamil Nadu Urban Development Fund
  2. http://www.processregister.com/Chennai_Port-Maduravoyal_Four_Lane_Elevated_Road/Project/pid23275.htm Chennai Port-Maduravoyal Four Lane Elevated Road Project by National Highways Authority Of India
  3. https://web.archive.org/web/20090621205250/http://www.hindu.com/2009/06/18/stories/2009061859590400.htm Tamil Nadu / Chennai News : Elevated expressway work to begin in November
  4. http://www.tn.gov.in/gorders/highways/hway_e_63_2008.pdf
  5. https://web.archive.org/web/20090131194036/http://hindu.com/2009/01/28/stories/2009012858270300.htm Tamil Nadu / Chennai News : Elevated expressway to have toll plazas
  6. https://web.archive.org/web/20090203072504/http://hindu.com/2009/01/25/stories/2009012558090100.htm Front Page : Work on elevated road along the coast will begin shortly
  7. http://www.nhai.org/nhdpphase7.asp .Completed Stretches on Golden Quadrilateral
  8. http://www.tn.gov.in/tnassembly/Governors_address_Jan2008.htm
  9. https://web.archive.org/web/20120127181202/http://www.hindu.com/2008/11/02/stories/2008110255220600.htm Tamil Nadu / Chennai News : Consultant appointed for BRTS corridors
  10. https://web.archive.org/web/20090607071134/http://www.hindu.com/2009/05/31/stories/2009053158450300.htm Tamil Nadu / Chennai News : Alignment for elevated bus corridors notified
  11. https://web.archive.org/web/20090606132908/http://www.hindu.com/2009/06/03/stories/2009060357630300.htm Tamil Nadu / Chennai News : Residents oppose elevated road project
  12. https://web.archive.org/web/20121024115709/http://articles.timesofindia.indiatimes.com/2009-06-03/chennai/28204946_1_corridor-adyar-river-adyar-poonga-trust Adyar Poonga Trust promises to resettle families displaced by circular corridor – Times Of India
  13. https://web.archive.org/web/20090618065653/http://www.hindu.com/2009/06/16/stories/2009061651800300.htm Tamil Nadu / Chennai News : Proposed elevated roads in Chennai a boon or bane?
  14. http://economictimes.indiatimes.com/News/News-By-Industry/Transportation/Chennai-circular-corridor-shortened-to-accommodate-metro-railway/articleshow/4886050.cms Chennai circular corridor shortened to accommodate metro railway – Economic Times
  15. https://web.archive.org/web/20090830103950/http://www.hindu.com/2009/08/26/stories/2009082659990300.htm Tamil Nadu / Chennai News : Study likely to be over by January
  16. http://www.thehindu.com/news/cities/Chennai/article533602.ece Nod for expressway