Chencunbei | |||||||||||
Native Name: | 陈村北 | ||||||||||
Native Name Lang: | zh-Hans | ||||||||||
Symbol: | metro | ||||||||||
Symbol Location: | Guangzhou | ||||||||||
Mlanguage: |
| ||||||||||
Address: | Between Guangzhu West Expressway (广珠西线高速公路) and Huanzhen East Road (环镇东路), Chencun Subdistrict, Shunde District, Foshan, Guangdong | ||||||||||
Country: | China | ||||||||||
Coordinates: | 22.9783°N 113.2395°W | ||||||||||
Operator: | Guangzhou Metro Group | ||||||||||
Platforms: | 2 (1 island platform) | ||||||||||
Tracks: | 2 | ||||||||||
Structure: | Underground | ||||||||||
Accessible: | Yes |
Chencunbei Station is a station of Guangzhou Metro Line 7, located underground between Guangzhu West Expressway and Huanzhen East Road in Chencun Subdistrict, Shunde District, Foshan, Guangdong Province, China.[1] The station was opened on May 1, 2022, with the opening of the western extension of Line 7.[2] [3]
This is the first station in Foshan's Shunde District when travelling westbound on Line 7.
The station was handed over to the '3 Powers' on November 12, 2021, for territorial management and operation of the station and facilities.[4]
G | Street level | Exits B, F |
L1 Concourse | Lobby | Ticket Machines, Customer Service, Shops, Police Station, Safety Facilities |
L2 Equipment Area | Equipment Area | Station Equipment |
reserved track area | ||
Reserved island platform | ||
reserved track area | ||
L3 Platforms | Platform | towards Meidi Dadao (Chencun) |
Island platform, doors will open on the left | ||
Platform | towards (Dazhou) |
Exit number | Exit location | ||
---|---|---|---|
Exit B | Huanzhen East Road | ||
Exit F | Huanzhen East Road |