Changsha Metro Explained

Changsha Metro
Imagesize2:275px
Locale: Changsha and Xiangtan, Hunan
Transit Type:Rapid transit
Lines:6
Stations:140
Ridership:2,580,169 (2023)
3,920,000 (2023 peak)
Operator:Changsha Metro Corporation Ltd.
Website:http://www.hncsmtr.com/
Owner:Changsha Government
Character:Elevated, underground
Native Name:长沙轨道交通

The Changsha Metro (officially ; usually called) is a rapid transit system in Changsha and Xiangtan. The first operational line, Line 2, commenced service on April 29, 2014, making Changsha the 18th city in mainland China to open a rapid transit system.[1]

Lines in operation

data-sort-type="text" style="width:120px;" LineTerminals
(District)
CommencementNewest
extension
LengthStations

(Kaifu)

(Yuhua)
2016202433.43km (20.77miles)25

(Yuelu)

(Changsha Co.)
2014201526.579km (16.515miles)23

(Changsha Co.)

(Yuhu,Xiangtan)
2020202353.69km (33.36miles)33

(Wangcheng)

(Changsha Co.)
201933.5km (20.8miles)25

(Yuhua)

(Changsha Co.)
202022.5km (14miles)18

(Wangcheng)

(Changsha Co.)
202248.11km (29.89miles)34
Total217.78km (135.32miles)140

Line 1

See main article: Line 1 (Changsha Metro).

Line 1 construction began in 2010 and was opened on June 28, 2016.[2] A 9.9km (06.2miles) extension to Line 1 opened in 2024. Line 1 has a line length of with 25 stations, of which 3 is elevated and 22 are underground.[3] The construction budget was 14.2 billion RMB. Line 1 is red on system maps.

Line 2

See main article: Line 2 (Changsha Metro). Line 2 is a line running from west to east in Changsha. It was opened on April 29, 2014[4] and extended in December 2015. The line is long with 23 stations. Line 2 is light blue on system maps.

Line 3

See main article: Line 3 (Changsha Metro). Line 3 started construction on January 3, 2014. The line opened on 28 June 2020.[5] Line 3 has a total length of with 33 stations. The line travels between Xiangtan North railway station and Guangsheng station. A southern extension was opened on 28 June 2023.[6] Line 3 is yellow-green on system maps.[7]

Line 4

See main article: Line 4 (Changsha Metro). Line 4 started construction on December 31, 2014. The line opened on 26 May 2019 with 25 stations.[8] Line 4 has a total length of 33.5km (20.8miles) with 25 stations.[9] The line travels between Guanziling station and Dujiaping station. Line 4 is purple on system maps.

Line 5

See main article: Line 5 (Changsha Metro). Line 5 started construction in 2015.[10] The line opened on 28 June 2020. Line 5 has a total length of with 18 stations. It travels between Maozhutang station and Shuiduhe station. Line 5 is yellow on system maps.

Line 6

See main article: Line 6 (Changsha Metro). Line 6 opened on 28 June 2022. It runs in an east-west direction, connecting the airport with the downtown. The middle section of Line 6 started construction on November 28, 2017.[11] The middle section has a total length of 30.46km (18.93miles) with 23 stations. The 5.5km (03.4miles) western section, with 4 more stations, and the 12.03km (07.48miles) eastern section with 7 more stations, are scheduled for completion in 2022.[12] It will travel between Shaoguang station and Changqing station. Line 6 is dark blue on system maps.

Fares and ticket system

Mobile payment methods

QR Code

Passengers can pay their Changsha Metro fares by using QR code.The system supports Alipay, WeChat Pay,Union Pay,Changsha Metro APP and several other apps. These apps requires one to scan a QR code when entering the fare gate at the origin station and again when exiting at the destination station. The fare is then deducted.

transport card

Passengers can pay their Changsha Metro fares by using China T-Union(Simplified as TU)(Mobile NFC included).Passengers swipe their TU card on the fare gate at the origin station and again when exiting at the destination station.

Single-trip ticket

Passengers can buy a single-trip ticket on the auto vending machine in the metro station by using cash as well as Alipay, WeChat Pay,Union Pay.Passengers can pay their Changsha Metro fares by using China T-Union(Simplified as TU)(Mobile NFC included).Passengers swipe their TU card on the fare gate at the origin station and again when exiting at the destination station.

Incidents

Future development

Short-term expansions

data-sort-type="text" style="width:120px;" LineTerminals
StatusPlanned OpeningLength
km
StationsReference

(North Ext. Phase 2)
PlannedTBA4.632[15]

(West Ext.)
Under Construction202514.511

(North Ext.)
ApprovedBefore 203015.269

(South Ext.)
PlannedTBA8.437

(North Ext.)
PlannedTBA3.652

(East Ext.)
Under Construction20243.621
Under Construction20271716

(East Ext.)
PlannedTBA5.465
Loop Line[16] PlannedTBA55.532[17]

See also

External links

28.2035°N 112.9577°W

Notes and References

  1. Web site: Changsha metro opens . . April 29, 2014 . railwaygazette.com . April 30, 2014.
  2. Web site: http://news.changsha.cn/h/187/20160628/437492.html . zh:地铁1号线今日开通 长沙迈入地铁换乘时代 . . June 28, 2016 . 长沙新闻网 . June 28, 2016 . zh . October 8, 2016 . https://web.archive.org/web/20161008055052/http://news.changsha.cn/h/187/20160628/437492.html . dead .
  3. Web site: http://news.changsha.cn/cs/2/201010/t20101026_1179224.htm . zh:长沙地铁1号线一期工程可研报告获批 2015年全面竣工 . . October 26, 2010 . 长沙新闻网 . April 30, 2014 . zh . dead . https://web.archive.org/web/20150618054148/http://news.changsha.cn/cs/2/201010/t20101026_1179224.htm . June 18, 2015 . mdy-all .
  4. Web site: 湖南首条地铁开通 长沙开启"半小时生活圈". www.huaxia.com. 2019-03-19. September 24, 2015. https://web.archive.org/web/20150924031733/http://www.huaxia.com/hn-tw/hnsy/xwsc/2014/04/3864131.html. dead.
  5. Web site: 长沙地铁3号线5号线预计6月28日载客初期运营. 2020-06-25.
  6. Web site: 27 June 2023. 地铁即将直达湘潭!带你提前打卡长株潭城轨西环线湘潭北站. VOC. 2023-06-28.
  7. Web site: 长沙地铁1到4号线颜色确定 2号线为天蓝色 - 中国日报湖南双语网. https://web.archive.org/web/20141111055620/http://www.chinadaily.com.cn/dfpd/hun/2012-09/08/content_15744783.htm. dead. 2014-11-11. 2014-11-11. 2019-03-19.
  8. Web site: 长沙地铁4号线周日"迎客" 赶快带上这份乘车指南来"尝鲜". https://web.archive.org/web/20190526010547/http://www.hn.xinhuanet.com/2019-05/25/c_1124540509.htm. dead. May 26, 2019. 2019-05-25.
  9. Web site: 长沙已开通两条地铁线 4号线即将试运行. hn.rednet.cn. 2019-01-15.
  10. Web site: 长沙地铁5号线一期工程开工 - 湖南频道. hn.rednet.cn. 2019-03-19.
  11. Web site: 长沙地铁6号线一标段开工建设 - 能源频道. ny.rednet.cn. 2019-03-19.
  12. Web site: 长沙地铁6号线河西段正式进入实施阶段,2021年试运营-民生-长沙晚报网. www.icswb.com. 2019-01-15.
  13. https://www.reuters.com/world/china/record-rains-paralyse-chinas-southern-city-changsha-2024-06-24
  14. Web site: Metro station floods in China's Changsha city . June 24, 2024 .
  15. Web site: 发展改革委批复长沙市城市轨道交通第三期建设规划(2017-2022年).
  16. Web site: 官方回复:长沙地铁8号线最新消息!盘点8号线双地铁口!. . 2022-10-26.
  17. Web site: 急急急!长沙"地铁第四期建设"连招四标!. 2022-09-13.