Central Circular Route Explained

Country:JPN
Central Circular Route
Map Custom:yes
Maint:Metropolitan Expressway Company Limited
Established:1982

The, signed as Route C2, is one of the routes of the Shuto Expressway system serving the central part of the Greater Tokyo Area. The route is a circumferential highway running through the outer wards of Tokyo. The route is the middle of four ring expressways planned for the city; the other three being the C1 Inner Circular Route, the C3 Tokyo Gaikan Expressway, and the C4 Ken-Ō Expressway.

Route description

The Central Circular Route has a total length of 48.8km (30.3miles).

It is a ring that lies approximately 8km (05miles) from the center of the city and goes through the wards of Edogawa, Katsushika, Adachi, Kita, Itabashi, Toshima, Shinjuku, Nakano, Shibuya, Meguro, and Shinagawa.

The eastern half is an elevated structure and the western half is an underground one. The Yamate Tunnel is a deep tunnel constructed beneath Yamate Street, the first section over 11km (07miles) in length, was opened to traffic on 22 December 2007. From 2010, the tunnel extended the Central Circular Route south from near Ikebukuro to Ohashi Junction connecting with Route 3. The last 9.4km (05.8miles) through Meguro and Shinagawa was opened to traffic on 7 March 2015.[1] When this last section of the tunnel opened the Yamate Tunnel formed Japan's longest, and the world's second longest road tunnel.[2] During the tunnel's first week of operations, traffic volume on the Inner Circular Route was reduced by seven percent from the previous week, and congestion on expressways inside the Central Circular Route (an index measured by recording segments where average traffic speed is less than 40abbr=onNaNabbr=on, and multiplying the affected distance by the affected time) was approximately halved from the previous week.[3]

The C2 begins and ends at the Bayshore Route, which serves to close the southeastern part of the loop.

History

The first section of the Central Circular Route was opened to traffic on 30 March 1982. Since then, the expressway was completed in phases. Construction work on underground sections of the route began in 1992. Given the extensive tunneling and engineering challenges involved, construction costs for the route were estimated to be 2 trillion yen.[4] The Central Circular Route was completed on 7 March 2015.[5]

Exit list

List of currently existing interchanges and exits ordered following the outer loop (clockwise):

MunicipalityExit/interchange nameDestinationsNotes
Shinagawa-kuC2 Oi-minami
C18
Shinagawa-kuŌi JCTBayshore Route
Shinagawa-kuGotanda
C20
Meguro-kuŌhashi JCTRoute 3 (Shuto Expressway) Outbound to Yōga and Tōmei Expressway. Inbound to Tanimachi from Inner Loop.
Shibuya-kuTomigaya
C22
Shibuya-kuHatsudai-Minami
C23
Shinjuku-kuNishi-shinjuku JCTRoute 4 Outbound to Takaido and Chūō Expressway. Inbound to Miyakezaka from Inner Loop.
Nakano-kuNakano-chojabashi
C24
Shinjuku Station, Tokyo Metropolitan Government OfficeInner loop exit/outer loop entrance only
Shinjuku-kuNaka-ochiai JCT (Planned)Planned Nerima Route outbound to Nerima and Kan-etsu Expressway.Tokyo Metropolitan Expressway Corporation plans to connect between C2 and Kan-estu Expressway through Nerima Route.
Toshima-kuNishi-ikebukuro Entrance
C25
Ikebukuro StationInner loop entrance/outer loop exit only
Toshima-kuNishi-ikebukuro Exit
C26
Ikebukuro StationInner loop exit.
Itabashi-kuTakamatsu Entrance
C28
Yamate-dori streetOuter loop entrance only. Inner loop exit has closed and moved to Nishi-ikebukuro in 2007, due to the extension of Yamate Tunnel.
Itabashi-kuKumanocho JCT Route 5 inbound to Higashi-ikebukuro and Takebashi JCT from Inner loop.Route C2 Outer Loop to Route 5 inbound is not connected.inbound only
Itabashi-kuItabashi JCTRoute 5 outbound to Ōmiya and Kan-etsu Expressway via Tokyo Gaikan Expressway.outbound only
Itabashi-kuShin-itabashi
C29
National Route 17, also known as Nakasendō avenueOuter loop exit only
Itabashi-kuTakinogawa
C31
National Route 17, also known as Nakasendō avenueInner loop entrance only
Kita-kuŌji-minami
C33
Ōji Station, Asukayama Park.Inner loop entrance/outer loop exit.
This interchange is currently being reconstructed into a full interchange in combination with Oji-kita Rampway.
Kita-kuŌji-kita
C34
Ōji Station, Asukayama Park.Inner loop exit/outer loop entrance
Note: this interchange is currently being reconstructed into a full interchange in combination with Oji-minami Rampway.
Adachi-kuKōhoku JCTKawaguchi Route to Angyō and Tōhoku Expressway
Adachi-kuOgiohashi
C35, C36
Adachi-kuSenju-shimbashi
C37, C38
Kita-senju Station, National Route 4, also known as Nikkō Kaidō avenue
Katsushika-kuKosuge JCTMisato Route outbound to Misato and Jōban Expressway
Katshushika-kuKosuge
C40
Inner loop exit/outer loop entrance
Katsushika-kuHorikiri JCTMukojima Route inbound to Ginza and Hakozaki
Katsushika-kuYotsugi
C41, C42
National Route 6, also known as Mito Kaidō avenue
Katsushika-kuHirai-ōhashi
C43
Outer loop exit/inner loop entrance
Edogawa-kuKomatsugawa JCT Komatsugawa Route outbound to Keiyō Road from Outer loop.Route C2 to Route 7 inbound is not connected.Outer Loop only
Edogawa-kuFunaboribashi
C46
Inner loop exit/outer loop entrance
Edogawa-kuSeishinchō
C47
Outer loop exit/inner loop entrance
This freeway stub will become part of Route 10
Edogawa-kuKasai JCTBayshore Route East to Urayasu and Higashi-Kantō Expressway
Bayshore Route West to Shin-kiba and Haneda Airport

Notes and References

  1. Web site: Completion Date of Central Circular Route. Press Release . 16 April 2013 . Metropolitan Expressway Co. Ltd.. 7 April 2014.
  2. Web site: Planning and Construction - Urban Long Tunnels, Yamate Tunnel. Shutoko. Metropolitan Expressway Company Limited. 6 March 2015.
  3. Web site: 下田. 健太郎. 中央環状線内側の首都高各線で渋滞・混雑量が半減. Nihon Keizai Shimbun. 日経コンストラクション. 20 March 2015. 19 March 2015.
  4. News: Tokyo's 47-km-long expressway loop fully opens. 7 March 2015. Jiji. The Japan Times. 7 March 2015.
  5. Web site: 首都高の歴史. ja. Metropolitan Expressway. 8 November 2019.