Casco-class monitor explained

The Casco-class monitor was a unique class of light draft monitor built on behalf of the United States Navy for the Mississippi theatre during the American Civil War. The largest and most ambitious ironclad program of the war, the project was dogged by delays caused by bureaucratic meddling. Twenty ships of the class were eventually built at great expense, but proved so unseaworthy when trialed that they were quickly sidelined, causing a public scandal.

History

After the success of the US Navy's first monitor,, in preventing the Confederate ironclad from breaking the Union blockade at Hampton Roads in the spring of 1862, the navy became enthused with the monitor concept (at the expense of the larger broadside ironclad type), and ordered a number of new classes of monitor, one of which was the Casco class.[1] The Cascos were a unique "light draft" class designed specifically for operating in the shallow bays, rivers, and inlets of the Confederacy.[2]

The specifications for the Casco class originally called for a vessel with a light draft, not exceeding six feet, and a low freeboard to present the smallest possible target to Confederate guns. For the design of the new class, the Navy turned once again to John Ericsson, designer of USS Monitor. Ericsson came up with a design for a 225feet-long vessel with a single revolving turret containing two 11inches guns, an armored upper deck, and twin screw propellers giving a top speed of around eight knots. Around the hull of the vessel, a large wooden "raft" was to be constructed, which would help increase buoyancy. Ericsson kept the design deliberately simple in keeping with the inexperience of the private shipyards which would be called upon to build them.[3] He anticipated that each ship would take no more than forty days to complete.[4]

The monitor office

At around the same time however, the Navy created a new "monitor office" to centralize oversight of the new monitor program. The new office, located across the hall from Ericsson's design bureau, was nominally headed by Rear Admiral Francis H. Gregory, but was effectively run by Chief Engineer Alban C. Stimers, to whom was entrusted the power of setting general plans and ship specifications. Stimers, an ambitious man, was keen to take credit for the design of the new monitors and frequently visited Ericsson's bureau to make changes to the specifications.[3] [5]

The greatest single alteration to the design however, came not directly from Stimers but from Admiral Joseph Smith, chief of the Bureau of Yards and Docks in Washington, D.C., who suggested that the oval hull of the ship be surrounded by large iron tanks which could be pumped full of water in order to lower the ship's freeboard still further when in combat to present an even smaller target, or drained for normal travel. Stimers liked the idea and ordered the changes, but when Ericsson saw the new plans he resigned from the project. The new plans greatly added to the design's complexity, requiring sophisticated pumping mechanisms, while the added weight would also reduce speed and buoyancy.[4]

More design changes

In February 1863 the monitor office offered contracts for twenty of the new Casco-class monitors, in spite of the fact that the original architect, Ericsson, had not approved the new design. Winning bidders included prominent firms like Reaney, Son & Archbold in Chester, Pennsylvania, Wilcox & Whitney at Camden, Harlan & Hollingsworth in Wilmington, Delaware and Merrick & Sons of Philadelphia (the latter of whom subcontracted much of the work to William Cramp & Sons). A number of smaller firms were also contracted. The cost was estimated at $395,000 per ship, or approximately $8 million in total. Some shipyards, such as Cramp, were forced to substantially upgrade their ironworking facilities for the production of the new vessels.[6] By the end of 1863, frequent design changes were causing growing problems for the contractors. Stimers and his team of thirty draftsmen at the monitor office continued to submit changes even as the vessels were in the process of production, leading to long delays. One yard in Boston received a total of 83 drawings and 120 letters of explanation from Stimers, and the specification manual for the ships grew to 92 pages of small print.[7] The final design called for a total of thirteen auxiliary engines and pumps per ship, fancy brasswork in place of cast iron, and a complex system of pipes for draining and filling the water tanks. The added weight to a ship designed with only a 15inches freeboard at the outset raised questions about the ships' eventual seaworthiness.[8]

Scandal and inquiry

By spring of 1864, the first of the Casco-class vessels,, was ready for her initial trial. Putting to sea, waves washed across the deck, while the stern remained totally submerged by three or four inches (10 cm).[9] A second trial, of, confirmed the disaster, with waves washing over the deck and the ship only able to make a speed of 3½ knots as opposed to the original specification of eight. Moreover, the trials were conducted "light", without the normal operational loads of coal, ammunition and stores. The ships were unseaworthy and virtually useless.[8] [10] [11] [12]

By this stage, the twenty vessels, in various stages of completion, had cost half a million dollars apiece. Amid public scandal, the Navy set up an inquiry. Stimers was found responsible and removed from his post, and the Navy appointed experienced administrators in his place. The vessels were redesigned and refitted in order to improve buoyancy, but few of them saw active service before the end of the war and those that did were decommissioned and laid up within months, while the majority were never commissioned at all. Within a few years, all the ships of the Casco class had been retired and scrapped or otherwise disposed of.[13]

Ships

Construction data
Ship name Builder ContractedLaunched Turret
removed?
RenamedFate
Atlantic Iron Works, Boston14 April 18637 May 1864
  • 4 December 1864
YesHero, 15 June 1869Scrapped, 1875
Aquilla Adams, South Boston17 May 18635 May 1864
  • 20 January 1865
YesOrion, 15 June 1869
Piscataqua, 10 August 1869
Sold for scrap, 1874
Continental Iron Works, Greenpoint, Brooklyn17 April 186331 May 1865
    • 19 January 1866
NoCharybdis, 15 June 1869
Cohoes, 10 August 1869
Sold for scrap, July 1874
Charles W. McCord, St. Louis24 June 18633 July 1865
    • 12 March 1866
NoHecate, 15 June 1869
Etlah, 10 August 1869
Sold for scrap, 12 September 1874
Alexander Swift, Cincinnati26 March 186320 April 1865
    • 6 May 1866
NoHarpy, 15 June 1869
Klamath, 10 August 1869
Sold for scrap, 12 September 1874
Wilcox & Whiting, Camden, New Jersey24 April 186318 May 1865
    • 28 November 1865
NoArgos, 15 June 1869
Koka, 10 August 1869
Sold for scrap, 2 October 1874
J.H. Underbill, Brooklyn4 June 186321 March 1865
    • 23 June 1865
YesAchilles, 15 June 1869
Modoc, 10 August 1869
Sold for scrap, August 1875
Harlan & Hollingsworth, Wilmington, Delaware2 March 186326 November 1864
    • 4 May 1865
YesNemesis, 15 June 1869
Napa, 10 August 1869
Sold for scrap, 1875
Union Iron Works, Brooklyn2 April 186319 October 1864
  • 27 March 1865
YesGorgon, 15 June 1869
Minnetonka, 10 August 1869
Sold for scrap, 1875
Donald McKay, Boston10 June 186326 April 1865
  • 10 August 1865
NoAetna, 15 June 1869
Nausett, 10 August 1869
Sold for scrap, August 1875
Curtis & Tilden, Boston2 April 186313 March 1865
  • 18 August 1865
NoEolus, 15 June 1869
Shawnee, 10 August 1869
Sold for scrap, 9 September 1875
Charles W. McCordat, St. Louis24 June 186314 July 1865
    • 12 March 1866
NoIris, 15 June 1869
Shiloh, 10 August 1869
Sold for scrap, 1874
Donald McKay, Boston4 May 186331 December 1864
  • 6 June 1865
NoErebus, 15 June 1869
Algoma, 10 August 1869
Scrapped, 1874
Globe Works, South Boston17 March 18631 February 1865
  • 27 July 1865
NoSpitfire, 15 June 1869
Suncook, 10 August 1869
Scrapped, July 1874
Reaney, Son & Archbold, Chester, Pennsylvania9 March 18634 June 1864
  • 12 July 1864
NoHydra, 15 June 1869
Otsego, 10 August 1869
Sold for scrap, 1874
Snowden & Mason, Brownsville, Pennsylvania4 March 186321 December 1865
    • 7 May 1866
NoFury, 15 June 1869
Umpqua, 10 August 1869
Sold for scrap, 12 September 1874
George W. Lawrence, Portland, Maine2 June 186325 July 1865
    • 28 October 1865
NoStromboli, 15 June 1869
Wassuc, 10 August 1869
Sold for scrap, 9 September 1875
A. & W. Denmead & Son, Baltimore13 March 18634 May 1865
    • 21 October 1866
NoNiobe, 15 June 1869
Waxsaw, 10 August 1869
Sold for scrap, 25 August 1875
Merrick & Sons, Philadelphia2 March 18638 May 1865
    • 15 December 1865
NoTartar, 15 June 1869
Yazoo, 10 August 1869
Sold for scrap, 5 September 1874
Alexander Swift, Cincinnati26 March 186330 May 1865
    • 6 May 1866
NoTempest, 15 June 1869
Yuma, 10 August 1869
Sold for scrap, 12 September 1874

References

Notes and References

  1. Heinrich, pp. 42–43.
  2. http://www.hazegray.org/danfs/monitors/umpqua.htm USS Umpqua
  3. Roberts, p. 110.
  4. Heinrich, p. 44.
  5. Heinrich, p. 43.
  6. Heinrich, pp. 44–45.
  7. Roberts, p. 116.
  8. Heinrich, p. 47.
  9. Roberts, p. 159.
  10. Roberts, p. 160.
  11. http://www.history.navy.mil/photos/pers-us/uspers-s/a-stimrs.htm Alban C. Stimers
  12. https://books.google.com/books?id=P91VDwAAQBAJ&dq=%22the+construction+of+a+dozen+light-draft+monitors+was+undertaken+late+in+the+war%22&pg=PT174 Millers Photographic History of the Civil War Vol 6 "The Navies"
  13. Heinrich, p. 48. See also DANFS entries for the individual ships below.