Cao Lãnh Bridge Explained

Bridge Name:Cao Lãnh Bridge
Native Name:Cãu Cao Lãnh
Native Name Lang:vi
Official Name:Cao Lãnh Friendship Bridge
Carries:Motor vehicles, pedestrians and cyclists
Crosses:Tiền River, Mekong Delta, Vietnam
Designer:Wilbur Smith Associates – WSP Finland – Yooshin Engineering Corporation Joint Venture
Design:Cable-stayed bridge
Spans:150 + 350 + 150 m (cable stayed parts)
Builder:Chinese Road and Bridge Corporation (CRBC) and the Vinaconex E&C<ref name="kgbo"/>
Begin:2013
Complete:2018
Open:27 May 2018
Life:100

The Cao Lãnh Bridge is a cable-stayed bridge over the Tiền River, a branch of the Mekong River at Cao Lãnh in Vietnam. The bridge is one of three components of the planned Central Mekong Delta Connectivity Project (CMDCP). The other two components are the Vàm Cống Bridge at Vàm Cống and the 4 lane expressway connecting the two bridges. The Cao Lanh Bridge was inaugurated on 27 May 2018.

Design

The cable-stayed bridge is 650m (2,130feet) long with a central span of 350m (1,150feet) and a maximum clearance above high water level of 37.5m (123feet). The total length of the bridge, including the approach viaducts, is 2010m (6,590feet) with spans of 17 x 40 + (150+350+150) + 17x40 (m). It has H-shape towers 120m (390feet) high, cast in situ concrete girder superstructure with a double-plane of cables in a semi-fan type configuration. It carries four lanes for traffic. The maximum speed on the bridge will be 80 km/h.

The objective of the Central Mekong Delta Connectivity Project is to encourage the economic and social development of the Cửu Long Delta area. The project was developed with the financial assistance from the Asian Development Bank (ADB) and the Government of Australia.[1] It is jointly funded by the governments of Australia and Vietnam, and the ADB. The bridge was the largest overseas assistance project undertaken by the Australian government costing A$160 million.

Construction

The groundbreaking ceremony for the Cao Lanh Bridge, was held on 19 October 2013 and attended by senior officials from the Vietnamese and Australian Governments and the Asian Development Bank (ADB). The bridge was expected to be completed after 43 months in mid-2017 but was delayed.[2] [3]

The opening of the bridge, held on 27 May 2018, was attended by Vietnam Deputy Prime Minister Trinh Dinh Dung, Australian Foreign Minister Julie Bishop, Vietnam Minister for Transport Nguyen Van The, ADB Country Director Eric Sidgwick and senior officials from ministries, cities and provinces.[4]

See also

External links

10.4127°N 105.6519°W

Notes and References

  1. Web site: Australia Raises Development Assistance for Vietnam Next Year . Vietnam Briefing . 23 May 2011 . Asia Briefing Ltd . 18 June 2012.
  2. Web site: Cao Lanh Bridge groundbreaking ceremony . 19 October 2013 . Departmental Media Liaison . Parliamentary Secretary to the Minister for Foreign Affairs . 3 January 2014 . dead . https://web.archive.org/web/20140103093609/http://ministers.dfat.gov.au/mason/releases/2013/bm_mr_131019.html . 3 January 2014 .
  3. News: Building work begins on Cao Lanh Bridge. 3 January 2014. 21 October 2013. Viet Nam News. 25 January 2021. https://web.archive.org/web/20210125211515/https://vietnamnews.vn/economy/246511/building-work-begins-on-cao-lanh-bridge.html. dead.
  4. Web site: Cao Lanh Friendship Bridge opened to traffic . Le Diem . 28 May 2018 . Vietnam Economic Times . 5 June 2018 . 29 November 2019 . https://web.archive.org/web/20191129054607/http://vneconomictimes.com/article/vietnam-today/cao-lanh-friendship-bridge-opened-to-traffic . dead .